Dal Lake Development Project. Dal Lake Central feature of Srinagar city; Centre of socio-economic activity; Religious significance; Large population depends.

Slides:



Advertisements
Similar presentations
Water Pollution. Definitions Impaired Waters Section 303(d) of the Clean Water Act requires states to develop lists of impaired waters, those that do.
Advertisements

Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Presentation by: Latha Chhetri Dy. Chief Urban Designer Urban Planning & Development Division, DUDES, MoWHS 27/08/2010 URBAN PLANNING & DEVELOPMENT DIVISION.
Environmental Science 2012
DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.
BHOPAL LAKE RESTORATION Project Undertaken By Dainik Bhaskar Group.
Water Sensitive Urban Design
1. Panama is in the industrial phase of transition. Describe the expected trends in the country’s birth and death rates. 2. Describe one advantage and.
Lena Shapiro and Nicole Melamed
Chesapeake Bay Program Presented by: Elizabeth Mills, Heather Plumridge, Elizabeth Repko Possibilities, Problems, and Promise.
NATIONAL PROGRAMME OF MID DAY MEAL IN SCHOOLS (MDM) ANNUAL WORK PLAN & BUDGET DEPARTMENT OF SCHOOL EDUCATION GOVERNMENT OF TELANGANA HYDERABAD.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Point Source POLLUTION: CAUSES AND CONSEQUENCES
Luke Gibbs. Job Description  Agricultural engineers use their knowledge to solve the problems of farmers and the agricultural industry. They work to.
Fish Requirements. Wilcox Central High School. Objectives: 1. Describe factors affecting water quality 2. Understand water oxygenation 3. Understand.
Civil engineering branches & scopes
Sasur Khaderi Project under MNREGA Kanchan Verma DM Fatehpur.
National Pollutant Discharge Elimination System(NPDES) Permit.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
ENVIRONMENT SCIENCE.
Types of Water Pollution Sewage Disease-causing agents Sediment pollution Inorganic plant and algal nutrients Organic compounds Inorganic chemicals Thermal.
ANALYSIS OF THE NCERA FARMS INVESTIGATION REPORT AND RECOMMENDATIONS TO THE PORTFOLIO COMMITTEE 1.PURPOSE T O INFORM THE PORTFOLIO COMMITTEE ON THE STEPS.
Total Maximum Daily Loads in MS4 Storm Water Programs.
Agriculture and its effects in Scotland, Belgium and Iceland
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Report of the Comptroller and Auditor General Of India For the year ended 31 March 2000 Improper disposal of biomedical waste by medical establishment.
Government and NPISHs Final Consumption Present practice in India Session III: P.Bhanumati and Anindita Sinharay Ministry of Statistics & Programme.
FreshwaterJeopardy $100 $200 $300 $400 $500 $100$100$100 $200 $300 $400 $500 Freshwater Systems and Resources How We Use Water Quantity of Freshwater Freshwater.
Year wise Details of Environmental Audits Conducted by SAI India & Appeared in the Audit Reports, as compiled by Regional Training Institute, Mumbai.
Environmental Issues. Pollution n The presence of a SUBSTANCE in water, air, or soil that makes them OFFENSIVE to humans.
Mid Day Meal Scheme PAB-MDM Meeting – Manipur Ministry of HRD Government of India.
Oyster Restoration in the Lynnhaven River. Watershed A watershed is an area of land that drains to a common point. A watershed is an area of land that.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Department of Municipal Hygiene and Occupational Health. Lecture on environmental sanitation for the 5th year Lecture Subject: Hygienic bases layout and.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Eric Agnew Environmental Regulations February 15, 2006.
Need for reducing, reusing and recycling waste
Water Pollution . 5 minutes – mark the roll
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Lesson 1.5 Pg
Humans in the Biosphere Chapter 6 Mrs. Yanac. Limited Resources All organisms on Earth must share the planet’s resources and they are LIMITED. Humans.
Sewerage Infrastructure Development in Sarawak
PLAN OF ACTION. GOAL SETTING Meta Conservation of Umiam Lake and its catchment Workable Goals: Stop solid waste dumping and sewage inflow into Umkhrah.
Wastewater Treatment Principles and Regulation. What is Wastewater? Sewage released by residences, businesses and industry Contains liquid and solid components.
THE JnNURM IN CHENNAI An assessment with focus on the urban poor Transparent Chennai.
Planning and Implementation of Sewerage Schemes. Sewerage The waste water collection, transportation through conveyance & Disposal system.
CH. 20: WATER POLLUTION By: Alexa Tsaganos and Cricket Slattery.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
Eutrophication of Lake Erie Teela Gaetz. Formation of Lake Erie | Lake Erie was formed originally by glacial movement around 1 million years ago | Lake.
Background: The Tamil Nadu Slum Clearance Act, 1971 The first and only piece of legislation for slum clearance, and to establish the Slum Clearance Board.
AIRPORT SURVEYS.
PRESENTATION ON RFCTLAR&R ACT, 2013 BY Sri Sangram Keshari Mohapatra JOINT SECRETARY, R&DM DEPARTMENT GOVT OF ODISHA.
Water Pollution: Pollutant Transport Mechanisms
Effluents Standards In Pakistan Environmental protection agency (EPA) is responsible for all aspects of the environment; regulation of sanitation and.
CHAPTER 2 NATURAL RESOURCES AND THEIR CONSERVATION LAND RESOURCE.
Chapter 14 Review Game.
Sanctions and allowances – Based on examples of some Hungarian regions
Hydrosphere Notes Parts 4- Watersheds.
Proposals for State: ……..
Water Pollution.
Water Pollution.
Environmental Issues.
The Health of Our Ocean& Pollution
Department of Environmental Quality Division of Water Resources
CONSTRUCTION METHODS & TECHNOLOGY
Water Pollution.
Water Pollution Chapter 11.
ANNUAL WORK PLAN & BUDGET ANDAMAN AND NICOBAR ADMINISTRATION
Presentation transcript:

Dal Lake Development Project

Dal Lake Central feature of Srinagar city; Centre of socio-economic activity; Religious significance; Large population depends on it for survival; Large source of vegetables, fish and aquatic plants; Major tourist attraction.

Dal Lake Area was 75 sq kms in 1200 AD; Area shrank to 24 sq kms in 1962; Area shrank to 15 sq kms in 1982; Current estimate is about 11 sq kms;

Dal Lake Serious deterioration in its water quality in last 40 years; Aquatic life of lake threatened; Threat of disruption of water supply to Srinagar city; May affect tourist traffic to Kashmir if further deterioration of lake not stopped

Dal lake Main cause of shrinkage and water pollution: Human interference by way of settlement on its shores; Encroachment on lake body; construction of earthen embankments within the lake;

Dal Lake Denudation of catchment area; Proliferation of floating gardens; leaching of fertilizer and pesticide into lake from surrounding agricultural fields; Flow of untreated city sewage into lake; Proliferation of houseboats in and on the lake

Dal Lake A consultancy group of experts from New Zealand was engaged in 1977 under Commonwealth Fund to recommend ways for improving the condition of lake

Dal Lake The group recommended: remove human habitation within the lake area and restore the area to lake; catchment area protection, nutrient and sediment removal and improve circulation of water; develop adjoining Nagin Lake;

Dal Lake Rehabilitate the displaced people; provide proper sanitation facilities within the peripheral area and houseboat sanitation; delineate the lake boundaries and control further ingress of population in the lake body

Dal Lake The project was accepted and started in 1978 for completion in 5 years at a cost of Rs. 9 crore later revised to Rs. 64 crore in 1982

Project Planning Project was divided into four phases; Project cost was revised from Rs. 9 crore (1978) to Rs. 64 crore in 1982 and to Rs. 323 crore in 1996; Completion time was extended from 5 years to 14 years; The project is still incomplete as of date

Implementation Construction of northern foreshore road and western foreshore road taken up, against the advise of experts proved counterproductive as it encouraged encroachment on water body instead of containing it.

Implementation Construction of roads resulted in cutting off 206 hectares of lake body from it. Further construction of western foreshore road was stopped, the constructed portion of road closed and converted into a footpath resulting in wasteful expenditure of Rs. 7 crore.

Implementation Construction f northern foreshore road also resulted in separating a large area from the water body and encouraging construction along the lake shore. Government banned construction on the lake shores, results of governmental action were yet to be ascertained.

Acquisition of land and structures Achievement for acquisition of land and structures in the lake area was only 48% and 8 % respectively of the targets set; Land and areas were acquired sporadically and acquired area was not restored to lake; Expenditure of Rs. 7 crore was incurred on acquisition till 1996 which did not serve any purpose; Acquired land continued to be used by people for cultivation.

Encroachments and constructions Encroachment on lake body and unauthorized constructions in and around lake continued unabated during the implementation of the project; The number of encroachments and unauthorized constructions increased from 16 in 1978 to 1967 in 1996

Rehabilitation Out of 1556 residential plots developed at a cost of Rs. 12 crore, only 293 were allotted till 1996; Expenditure of Rs. 7 crore was unutilized; 350 kanals of land were acquired (Rs. 3 crore) in 1988 for rehabilitation of families and Rs. 2 crore spent on development of colony.

Rehabilitation While development work was going on, Srinagar Development Authority pointed that the area was green belt in master plan and can not be used for residential purposes; Further work was stopped; entire expenditure proved unfruitful

Deweeding Experts had suggested selective deweeding through both mechanical and manual means in a manner to cause least disturbance to lake’s eco- system; The department purchased mechanical deweeders (Rs. 3 crore) and put them to extensive use resulting in appearance of algal bloom.

Settling basin Settling basin was estimated to cost Rs crore and expected to be completed in 3 years; Even after incurring an expenditure of Rs. 7 crore, the work is yet to be completed

Houseboat sanitation Problem of houseboat sanitation not resoled even after 18 years; manifold increase in number of houseboats has aggravated the problem; 2 biolets imported from USA in 1988 (Rs. 2 crore) were useless; Scheme of holding tanks (cost Rs. 45 lakh) in 1989 not used.

Peripheral area sanitation Sanitation schemes for peripheral area constructed at a cost of Rs. 2.4 crore not used and land for oxidation tanks not acquired. Sewage treatment plant yet to be constructed; This has further aggravated the lake sanitation.

Catchment area improvement Rs. 8 crore advanced for soil conservation and aforestation work in catchment area; Detailed accounts not obtained; work done by implementing agency not known to project authorities.

Nagin Lake Development Rs. 7 crore were advanced to various agencies in for; Land acquisition; Shifting of leper hospital; sewerage works in shore areas; Work was yet to be taken up and funds were lying unutilised

Banned works Extensive mechanical deweeding was stopped in 1996 due to is extensive harmful effects; Holding tanks for houseboats for collection of sewage was stopped in 1995 as it was not popular; Yet Rs. 3 crore were advanced in 1998 to different agencies for these works

Water quality testing Regular monitoring of water quality of lake was envisaged in 1986; Rs. 1 crore was advanced to a local Engineering College and Rs. 70 lakh to a local degree college for establishing modern laboratory facilities; Department was not aware if facilities had been established, no report was obtained from laboratories about work done

Creation of liabilities Dal Lake division had purchased material (civil construction material and mechanical equipment) without obtaining approval of sanction authority and without obtaining funds for these; This resulted in creation of liabilities for unapproved works.

Shortage of stores Non-observance of rules and regulations led to loss and theft of store material valued at Rs. 57 lakh besides shortages of Rs. 33 lakh noticed in store.

Excess purchases Stores valued at Rs. 2.3 crore in 1995 were still lying unutilized; Purchase was made in excess of requirements

Purchase of model Order for supply of a model of lake was placed on Chandigarh firm in 1996; Order was placed by the Chief Engineer while on leave at Chandigarh and 100% advance payment made to the firm (Rs 4 lakh); The firm supplied the model after a lot of correspondence and after a delay of 3 years; The model received by the Division was in broken condition and had to be discarded.

Irregular drawal of funds Funds amounting to Rs. 5 lakh were drawn by the Division on hand receipts; Name of the work was not indicated on the hand receipts nor were reference to estimate or sanction indicated; The matter is under investigation of State Vigilance