24 th September 2012 (Redditch) 27 th September 2012 (Leeds) 4 th October 2012 (London) 8 th October 2012 (Exeter) 10 th October 2012 (London) QIPP Digital.

Slides:



Advertisements
Similar presentations
Initial thinking on clinical commissioning group (CCG) authorisation
Advertisements

Tips to a Successful Monitoring Visit
Introduction to the Summary Care Record (SCR) GP Module SCR Concept Training GP Module Self Run v
Adult HIV Outpatient PBR Tariff Development National Reference Group Meeting 21/05/10.
Requirements Specification and Management
QIPP Digital Technology and ITK Care Co-Ordination: Interoperability WebEx4. 14 th November 2012.
Next Throughout this demo, if nothing happens for a couple of seconds click ‘Next’ to continue … SCI Gateway Product Demonstration Updated next.
ISB Appraiser Training. Contents Information Standards Board Development methodology Appraisal process Conducting an appraisal Further information.
QIPP Digital Technology and ITK Care Co-Ordination: Interoperability WebEx 3. 1 st Nov 2012.
Implementing the Single Assessment Process across the South West Peninsula Basic awareness.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
ISB Notice and preparing for the implementation of the new IAPT Data Standard Shaun Crowe Mental Health, Employment and IAPT Mental Health Collaborative.
MSU HealthTeam Michigan State University WHAT’S NEW IN 9.2.
IS550: Software requirements engineering Dr. Azeddine Chikh 4. Validation and management.
GPGv4 SCIMP Nov 2010.
Promoting Excellence in Family Medicine Enabling Patients to Access Electronic Health Records Guidance for Health Professionals.
E-Referral enabled collaborative health care Opportunities and considerations Presented by: Sasha Bojicic Emerging Technology Group Canada Health Infoway.
Practice EDI Administrator’s Workshop Pathology Messaging Implementation Programme (PMIP)
Assessment Improvement Maureen McEnaney Safeguarding & Review Manager Every Child Matters.
Development of Clinical Practice Guidelines for the NHS Dr Jacqueline Dutchak, Director National Collaborating Centre for Acute Care 16 January 2004.
NHS Interoperability Programme Workshop Overview Indi Singh 16 th December 2014.
1 Project Nexus Data Management Definition Workshop 18 th May 2009.
Key Information Summary (KIS) NHS Borders Webex Presentation 22 May 2013.
Configuration Management (managing change). Starter Questions... Which is more important?  stability  progress Why is change potentially dangerous?
A new approach: Extending the role of Pharmacy in Primary Care Workstream lead: Ramiz Bahnam.
EContract Authoring Supplier Training Material. ‘Supplier Review’ Process.
Query Health Distributed Population Queries Implementation Group Meeting October 25, 2011.
Developments & Issues in the Production of the Summary Hospital-level Mortality Indicator (SHMI) Health and Social Care Information Centre (HSCIC)
The NHS Summary Care Record Supporting person centred coordinated care Sep 2015 v0.11.
Patient access to on-line records Policy perspective Peter Short National Clinical Lead GP Department of Health Informatics Directorate & GP Partner in.
ipp Telehealth: PHMR Development Review Richard Trusson NHS Technology Office DH Informatics Directorate.
Health Delivery Services May 29, Eastern Massachusetts Healthcare Initiative Policy Work Group Session 2 May 29, 2009.
21-07-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Command Service Date Submitted: Month, NN, 200x Presented at IEEE.
GEtServices Purchasing Units & Materials Training For Suppliers Request.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Implementing the Single Assessment Process across the South West Peninsula Basic awareness.
Devon Partnership NHS Trust Configuration Release 1 25/26 th May 2011 Briefing Session.
QIPP Digital Technology and ITK Care Co-Ordination: Interoperability WebEx4. 8 th November 2012.
24 th September 2012 (Redditch) 27 th September 2012 (Leeds) 4 th October 2012 (London) 10 th October 2012 (London) QIPP Digital Technology and ITK Care.
The Patient Choice Project Use Case Working Session February 12 th, 2016.
EContract Authoring Supplier Training Material Caterpillar Non-Confidential.
An agency of the European Union EudraCt – Results Webinar # 1 Presented by Tim Buxton on 20 January 2016 IT Service Strategy Manager, IT Operations.
360x Overall Flow and Interactions Primary goals are to: Standardize the type of data exchanged and how the data is transported. Provide transparency to.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Training for organisations participating in Peer Review of Paediatric Diabetes.
NHS Health Check National Learning Network 15 th March 2011 NHS Health Check Data Set.
NHS Health Check. NHS Information Centre for Health and social care  Mark McDaid – Project Manager  Martin Hepplestone – Business Analyst ( starts August.
Guide to Medical Billing CHAPTER Third Edition Clinical Records and Medical Documentation 3.
Acting on concerns Ralph Tomlinson Head of Invited Reviews.
Health & Social Care Information Centre SEPHIG: 12 th September, 2012.
Dispelling the myths about dm+d Presenter: Karen ReesDate: 10 th December 2014 dm+d and the NHS Standard.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
CVD Optimal Service Design Workshop Defining “what to change” using the NHS Right Care methodology Part of the NEW Devon Way.
ESB Networks Market Release Meeting of the IGG, May 28th 2009
Initial thinking on clinical commissioning group (CCG) authorisation
Nursing Home Dietetics Service update
Cancer Optimal Service Design Workshop Defining “what to change” using the NHS Right Care methodology Part of the NEW Devon Way.
GP Connect - Workshop WIFI – Guest / Smokescreen
TPP Standard PCS Requirements
WebEx Housekeeping Phones on silent Fire exits Toilets and Coffee
Information for Patients Please return to reception
Update on Exit Capacity Substitution and Revision
Key Value Indicators (KVIs)
Adherence to Evidence Based Medicine Programme Evidence Summary Pack (Version 2) Correction of Ptosis Local commissioners working with local people for.
Annual health checks for people with learning disability
DSG Governance Group Recommendations.
Emergency Care Data Set (ECDS)
Presentation transcript:

24 th September 2012 (Redditch) 27 th September 2012 (Leeds) 4 th October 2012 (London) 8 th October 2012 (Exeter) 10 th October 2012 (London) QIPP Digital Technology and ITK Care Co-Ordination: Interoperability Workshop Outputs

Background  A series of five workshops were held, with a mix of attendees:  30 NHS attendees from a range of NHS organisations:  CCG  GP  PCT  SHA  HIS  Hospice  Acute  Ambulance  15 DH attendees, including:  Informatics  Data Standards  QIPP LTC workstream  QIPP EOL workstream  National EOL Progamme  9 Supplier attendees from 8 different suppliers

Workshop Outputs  The slides and handouts from the workshops are available on the ITK NHS Networks site.slideshandouts  Primary topics that were discussed in the workshops were:  Notifications  Care Plans  End of Life Care Preferences  Managing Changes to Documents  A summary of the main points captured from the discussion in each of the workshops is available on the ITK NHS Networks site.summary of the main points captured from the discussion  NOTE: This slide deck will be used in the WebEx on the 17 th October.

What Happens Next?  Share the collated outputs from the workshops, along with the proposed high-level requirements identified (this slide deck). 12 th October  WebEx: Discuss high level requirements with attendees, and discuss comments or concerns raised 17 th October  Share agreed high level requirements  Share proposed lower-level requirements 19 th October  WebEx: Discuss proposed lower-level requirements 25 th October  Follow-on WebEx sessions to discuss specific topics – full schedule of WebEx sessions to be shared asap. Nov  First draft of ITK Message Specifications shared 3 rd Dec  Release Candidate ITK Message Specifications published  Implementation guidance published End Dec

Main Deliverables Planned by End 2012 ITK Message Specifications Notification message guidance: Implementation Guidance  Notification Sender Requirements  Notification Receiver Requirements EOL Care Co-Ordination message guidance:  EOL Sender Requirements  EOL Receiver Requirements Get Document message guidance:  Document Provider Requirements  Document Requestor Requirements  EPaCCS System Requirements Other guidance:  Notification message  EOL Care Co-Ordination Information and Preferences message  Get Document message

High-Level Scope: Notifications  The proposed content of the Notification was included in the handouts used in the workshops.handouts  In addition to that, the following scope is proposed for the message and supporting implementation guidance:  All recipients of the notification will be listed in the message  Recipient systems will be configurable to allow for different behaviours when a notification is received based on locally defined criteria.  Behaviours may include adding a flag, adding a note to a patient record, creating an item on a work list, or directly notifying a user.  The criteria used may include the event type, sender, or patient – allowing for notifications relating to different cohorts of patients to be treated differently.  An additional flag can be included in the message to indicate that the sender requires acknowledgement when a recipient has seen the notification.  This should only be used when absolutely necessary, and the exact criteria for this acknowledgement would need to be locally defined as there is insufficient clarity to define national requirements for this at this stage.

Out of Scope: Notifications  A number of other requirements were discussed, but will not be included in the scope for the first phase of development – these include:  Inclusion of a free-text paragraph summarising the event/care provided  The concern with this is that we could not control what was put into the field, which would make information governance very difficult.  Inclusion of a level of “urgency” as assessed by the sender  There was not a consensus on the need for this in the workshops  There is a risk that any priority from the sender would be ignored and the behaviour expected by the sender may not be not followed

High-Level Scope: EOL Care Preferences  The proposed content of the EOL Care Preferences was included in the handouts used in the workshops. handouts  In addition to that, the following scope is proposed for the message and supporting implementation guidance:  Clinical coding should be supported for as many fields as possible (proposing its use in around 6-7 fields in phase 1 – TBC)  The document will include patient consent details  The document will include formal and informal carers and their relationship with the patient  The document will contain details of who updated each section of the document, and the date the change was made (full detailed audit of previous versions will be viewable in the EPaCCS system)  Clinical systems can allow a new document to be pre-populated using information pulled from the local patient record  Individual coded items from a received document must not be incorporated directly into a local patient record without rigorous controls (likely to involve manual checks). These controls MUST have been locally assured as clinically safe.

Out of Scope : EOL Care Preferences  A number of other requirements were discussed, but will not be included in the scope for the first phase of development – these include:  Inclusion of additional items in the document, including: Summary sections for each clinical specialty, information pertinent to children’s end of life care, issues with communication or comprehension, equipment issued, domiciliary status, ethnicity, religion, pacemaker, donor register, anticipatory or crisis plan content, details about what is “normal” for the patient  The general consensus from the workshops was that the core content should remain minimal, aligned with the ISB standard.  Adding lots of other sections could make it take longer to complete and it could become a form-filling exercise  Free-text fields exist to capture “other pertinent information”, and any of these items could be captured there if required.  Inclusion of medication  This was excluded from the core information set duing the ISB consultation due to concerns over how this would be managed and kept up to date.  Inclusion of detailed history and/or change log information  The general feeling was that this level of detail would not necessarily be required for direct provision of care, and if it were not available directly in the record that would be acceptable as long as it could be accessed in the EPaCCS system if required.

Managing Changes  A mechanism for electronically requesting a copy of a clinical document was proposed in the workshops.  Support for a “click-through” mechanism was also proposed.  There was general agreement with the need for both mechanisms, with the following specific requirements proposed for this phase:  A clinical document can be electronically requested using an identifier received in a notification – the document returned should always be the latest version  It should be possible to “click-through” into the source system and make changes to the content (subject to IG controls)  A single-sign-on mechanism should be used to avoid the need for multiple login/passwords  In this phase of development the following will not be in scope  Updating a document that has been received, and sending back a new version to the original sender  The complexity of implementing this is very high, and there is a potential clinical risk of conflicting updates not being managed properly  Anyone wanting to change the content should click-through into the source system and make changes there