1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.

Slides:



Advertisements
Similar presentations
Alternative Sources of Energy Distributed Generation economics, variability factors, capacity contributions, and environmental considerations related to.
Advertisements

Presented by: Rod Meredith Assistant Director Public Works Riley County, KS Matthew Leaper Business Development Manager Johnson Controls, Inc. IMPLEMENTING.
Energy Conservation Energy Management.
Presented to: DOE/CETC Ottawa 2005 Bob Bechtold Harbec Plastics, Inc.
The Power to Make a Difference PPL Electric Utilities April 2010.
Heating, Ventilating, and Air-Conditioning
Planning for Updates and Linkages to EM&V CALMAC February 17, 2004.
Geothermal Heating & Cooling System Harnesses the free renewable energy in your own backyard to heat and cool your home. Economical - Can save you up.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
Installation of New CHP system at the Old Aberdeen Campus.
California Energy Commission Customer-side Distributed Generation Impacts CED 2013 Preliminary Demand Analysis Working Group DG PUP June.
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
T OPPORTUNITIES FOR ENERGY EFFICIENCY AT TRIBAL GAMING FACILITIES.
1 Experience with IR 70kW installations on LFG, will current emission performance be enough? January 26, 2005.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
September 24, 2003Forester’s Co-Op Introduction and Overview of Washington Ridge Youth Conservation Camp Project - 3 year MOU & Team Building Biomass Fueled.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
Neeharika Naik-Dhungel, EPA CHP Partnership Program Central Pennsylvania AEE Meeting January 26, 2012 Combined Heat and Power: CHP Partnership and the.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Over 60,000 Honda MCHP Units at work in Japan
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Solar Energy Technology for Commercial Facilities John Archibald American Solar, Inc. Association of Energy Engineers Baltimore Chapter.
Equipment Lease Program Design Delivering the Benefits of Demand Response and Energy Efficiency.
Micro-Turbine Systems for Energy Production from Agricultural and Food Waste.
Renewable Technologies Available in Ireland Paul Kane.
Don ’ t blow off steam- microturbines make cheap, clean energy from waste heat Presented By: Ahmad Sabri El-Sayed Nagy By: Lindsay Audin Web Address:
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Air Emission Benefits of CHP Air Innovations Conference August 10, 2004 Joel Bluestein Energy and Environmental Analysis, Inc. Prepared under contract.
EvergreenEcon.com Heat Pump Water Heater Model Validation, Market Progress Assessment, and Process Evaluation RTF HPWH Sub-Committee Meeting October 15,
Green Building Demonstration Project Adam Saling City of San Diego.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Renewable Power Generation Wind Energy Systems:  Fastest growing segment of renewable energy business (up 75% in capacity since 1990) Possible limitations.
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Technology details, potential and experiences of Trigeneration
The following advertisement is created for the sole purpose of understanding the Commissioning process. The following advertisement is created for the.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
Name of Building(s) or Project Speaker(s) Organization(s)
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
Lecture Objectives: Finish with example modeling problems –Phase change thermal storage materials –Energy and airflow Interpret energy simulation results.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
2010 Massachusetts Energy Efficiency Programs July 1, 2010.
Task XI Time of Use Pricing and Energy Use for Demand Management Delivery Task Status Report April 2006 Richard Formby.
Microturbine Demonstration at Atlantis Marine World Aquarium.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Water is the Natural Choice Hydronic Comfort Systems Increase and Maintain Building Efficiency For the Life of Your Building
Wisconsin’s Focus on Energy - Program Update John Nicol, PE Industrial Program Manager.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
CHP Project Costs Screening Public Utility Commission of Ohio Public Utility Commission of Ohio Combined Heat and Power: Financial.
Tim Pollard Head of Sustainability Wolseley UK.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Energy Efficiency and Conservation Direct Use Program Proposal Washington Gas Light Co. For Discussion with EmPOWER Maryland Stakeholders January 27, 2012.
The Energy Efficiency and Solar Nexus:
Irvine Ranch Water District Distributed Energy Storage Case Study
Calibrated Energy Models: One New Change
Presentation transcript:

1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004

2 Who is PowerHouse Energy A Southern California based Distributor and Authorized Service Provider of both traditional and state-of-the-art energy products It’s sole mission is to create a win-win solution for it’s customers by reducing energy costs and increasing profits through the use of on-site generation equipment while never reducing the customer’s security of supply PHE offers a variety of options for equipment ownership. It will install and service the equipment to insure seamless energy generation

3 Who is Embassy Suites Embassy Suites, Brea is a full service hotel in the central retail district They have 228 guest rooms with a 400 seat restaurant with conference/meeting rooms The hotel operates 24 hours X 7 days a week They have room heat pumps, central water heating, laundry, swimming pool and spa PHE partnered with the hotel in an energy service The hotel was interested in cost savings

4 Pre-CHP Electrical Load

5 Post CHP Installation

6 Progress Checklist

7 Project Schedule

8 Organization Project Management- Thom McMahon/ Installation, Ken Nilsson/Service Funded, Owned and Operated by PowerHouse Energy Project Plan (Actual Date) - Equipment Delivery 12/2002(Same) - System Commissioned 3/2003(5/2003) - Monitoring Underway 5/2003(5/2003)

9 Pictures of Site

10 Pictures of Site

11 P&ID As Built

12 Installation Improvements Improvements this Site - Ventilation improvements - Metering equipment and pool heat interfaces as original installation - Selection of installation contractors - Poor fit of supplied package exhaust ducting Target Improvements-Volume Installations - Standard drawing packages - Experienced installation contractors - Volume material purchases

13 Project Cost Table

14 Electrical Performance Hours of operation to Date 4000 & 4100 Average Electrical Performance 26% 65,000kW/9,200 Therms (LHV) (Dec. 2003) Estimated Parasitic Loses in KW- 5kW/hr Power Quality Tests Done as required by Southern California Edison for Interconnection acceptance.

15 Thermal Performance Thermal Output used 420,000,Btu/hr Average water Delta T across HTX 12 o F Average flow rate through HTX 70gpm CHP Efficiency 55%, (26%e+29%t) Expected Peak Total System Efficiency 70% Electrical 28%+ Thermal 40% Cooling system N/A

16 Emission Performance No emission testing has been done to date. Emissions appear to be in line with Capstone estimates.

17 O&M Performance Availability The equipment was unavailable for 612 hours due to equipment failure, (2 units including site issues). Availability cumulative since start 94.4%. 15 site visits due to equipment, 15 due to data acquisition and site issues. Cost of O&M (less fuel) The current estimate of annual O&M costs excluding hot end replacement in total costs is $7,000 and 0.8cents/kWh, (2 units).

18 Institutional Experience Building department and electric utility interconnection approvals were required. Project management overhead costs associated with approvals were approximately $2,500. No issues were encountered with either approval process.

19 Supplier Support PHE was the supplier that “turn keyed” the installation. Better understanding of radiant heat generation for ventilation of product would be helpful, ~70,000Btu/hr each w/gas compressor. Technical support was very good from Capstone with clear documentation. PHE is a Capstone Business Partner with a clear understanding of O&M costs. PHE took advantage of Capstone’s promotional two unit package with a 3-year back stop warranty of $0.008/kWh costs.

20 General Experience Indoor installations need to account for radiant heat with ventilation. Tight space installations may not be able to accommodate product improvements. PHE has gone on to do several other hotel installations, honing design and contractor work. Current installation costs by PHE are now within 1-2% of planned or budget costs. Suggested development areas, monitoring capability of kW, thermal and gas use in unit. Reliability of electrical components.