Creating forest sector solutions www.fpinnovations.ca One vision Enhanced safety on B.C.’s resource roads A New Radio Communications Protocol for Resource.

Slides:



Advertisements
Similar presentations
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study Technology Assessment Team: Suggested Phase III Activities Presented at ICAO ACP.
Advertisements

Background Presenters Work done in preparation for WHS changes
Resource Road Radio Use Pilot Project March 2008.
C-FAARM Help Desk James Campbell Monitoring and Evaluation Coordinator March 30, 2011 ICT4 Development Conference Lusaka, Zambia.
Secure Systems Research Group - FAU Process Standards (and Process Improvement)
Land Transport Paul Zealand Land Transport – A Key Risk Increasing exposure with increase in onshore Project and Facilities growth Close interaction.
Traffic Control Guidelines
Alberta Occupational Health and Safety Update 2013.
Options for Wide Area Only and Wide Area and Local Area Operations
Georgia Interoperability Network
Connected Vehicles AASHTO Annual Meeting | October 17, 2013 | Denver, CO Mike Cammisa Director, Safety Association of Global Automakers.
VERTEX STANDARD is registered in the US Patent & Trademark Office. All other product or service names are the property of their respective owners. © Vertex.
Resource Roads and Radio Use Changes 2007 SAFETY IMPLICATIONS.
Digital communications. Hams have developed techniques for transforming 1’s and 0’s into tones into the same frequency range as human voice. So now a.
Regulating Broadcasting Overview of the technical specifications that make up the U. S. broadcast spectrum.
Site Surveys SECTION 5 - Radio Site Survey.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
RF Drive Test (Testing) Engr. Mehran Mamonai. Introduction Every good RF design, after its implantation should be evaluated. There are few ways to do.
Guidelines for Traffic Control at Surface Mines
Morris Bodnar Director, Compliance and Interior Offices Tel: (250) Fax: (250) Pilot Implementation of.
Preventing Runovers and Backovers
SHORT WAVE SERVICES: The Gateway to Africa August 2012.
Regulations and Traffic Procedures
NOTIONAL – FOR DISCUSSION PURPOSES ONLY Version 2.2 Hank Suderman Collection Highway and Motor Carrier Truck and Hazmat Shipment Tracking Presented by.
Planning, First Aid and Working Conditions Section C of the Forest Activities Code.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
Symposium 2001June 24, 2001 Curriculum Is Just the Beginning Chris Stephenson University of Waterloo.
NBTC/ITU Workshop on Cross-Border Frequency Coordination June , 2015 Bangkok, Thailand István Bozsóki Head of Division BDT/IEE/SBD 1.
Technician License Course Chapter 5 Operating Station Equipment Lesson Plan Module 11: Transmitters, Receivers and Transceivers.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Radio Communication Problems in 2005 Related to Narrow Banding, and Resulting NMAC Strategy Martin Maricle AK-Division of Forestry Originally presented.
Mutual Aid Box Alarm System. MABAS Communications Committee  Charged with the task of improving fire service communications interoperability to assist.
HYBRID ROUTING PROTOCOL FOR VANET
STFC Safety, Health and Environment (SHE) Codes SHE communication is an area the STFC needs to improve and a simple demonstration of effective safety management.
Mike Schagrin US Department of Transportation ITS Joint Program Office IntelliDrive Safety Program Overview.
Regional Resource / Global Gateway Colin Parker, Chief Executive | 27 August 2008.
VERMONT COMMUNICATIONS (VCOMM) March 2, 2006.
Aviation Safety on the Fire Line Ken Wong. Aviation Safety on the Fire Line The success of our aviation operations on the fire line have several key factors.
Telecom Consultants International UHF2 Band Reversal Study Presented by Dr. Richard Dewey.
1 © 2006 Nokia pullola_ ppt / Extending Base Station Active Radio Link Set for Improved Uplink Scheduling Esa-Pekka Pullola Supervisor:
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
IntelliDriveSM Update
ABSTRACT Currently, drivers must utilize a third-party, such as a radio or broadband device, to learn about local traffic conditions. However, this information.
RESOURCE ROAD CALL PROCEDURES. There is a need to develop a radio call standard for single and multiple users to operate and communicate safely on Resource.
Göteborg Incident Management National guidelines from Denmark Iben Louring Mortensen (Danish Road Directorate)
Traffic Rules Clarity February 2013 Mine Operations.
FSR/Resource Road Radio Frequency Project. 2 BACKGROUND IMPROPER/INCORRECT USE OF 2- WAY RADIOS A KEY FACTOR IN FOREST ROAD DEATHS AND SERIOUS INJURIES.
Jeju, 13 – 16 May 2013Standards for Shared ICT Activities of Wireless LAN Systems R&D Group in ARIB Kohei SATOH Managing Director, ARIB Document No: GSC17-GRSC10-02.
Western Program Highlights Presentation to FERIC Wildland Fire Detection Workshop June 6, 2006 Presentation to FERIC Wildland Fire Detection Workshop June.
Log dumps, Ponds and Yards Section L of the Forest Activities Code.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Networked Systems Practicum Lecture 5 – Cellular Intro 1.
Issue 1 - Quarter 1 (2001) Welcome to the first newsletter regarding “MASTS”. You may have heard the name before but basically it is a project to procure.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
NSMA Working Group Conference Report Larrie Sutliff, Chair NSMA Spectrum Management /16/2012.
The information systems lifecycle Far more boring than you ever dreamed possible!
Paul Blomberg, Stuart-Nechako Timber Sales Office Dona Stapley, Resource Tenures and Engineering Branch Safe Roads with Information Management.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
EasyWay - conclusion.
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Ad hoc Data Dissemination in Vehicular Networks
Connected Vehicle Deployment – DfT perspective
Flooding Walkdown Guidance
Technician Licensing Class
Resource Roads and Radio Use Changes 2007
Mutual Aid Box Alarm System
AMA Intelligent Transportation Systems
A. Echolocation B. Doppler radar C. Radio direction finding
A. Talk louder into the microphone B. Let the transceiver cool off
Training Presentation Truck Controller- Surfacing
Presentation transcript:

Creating forest sector solutions One vision Enhanced safety on B.C.’s resource roads A New Radio Communications Protocol for Resource Roads in B.C. B.C. Radio Communications Working Group

VHF Radio Pilot Projects  Increased traffic on Forest Service Roads  too many channels and confusion about correct frequencies and call procedures  interference with other licensed radio users and other operations  Excessive chatter and “forgetting” to call Resource road safety issues: B.C. Resource Road Radio Pilot Projects

Why is a standard radio use protocol necessary? To reduce incidences of crashes in the bush because somebody was on the wrong channel To ensure that wherever you are in the province, you have the right channel in your radio Both these incidents were loaded trucks rear-ending other loaded trucks in adverse weather conditions –both weren’t on the right channel as they were short term hauls, and didn’t get channels programmed into their radios. B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Working Group formed to reduce radio-related incidents and improve resource road safety:  BC Ministry of Forests and Range  B.C. Timber Sales  BCMOFR Radio Operations  B.C. Forest Safety Council, Trucksafe  Industry Canada, Spectrum Management  FPInnovations, Feric Division Developed a new communications protocol B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Working Group proposed:  42 dedicated narrow band channels (14 frequencies with 3 tone codes)  33 road and 9 loading channels  low (5W) and high (30W) power channels  standardized signage  standardized call procedures B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Two Pilot Projects: Strait of Georgia Business Area  Tsitika / Eve started on Jan 1, 2008  Other roads in Campbell River, South Island, and Sunshine Coast Districts on Mar 1, Apr 1, and May 1 Tumbler Ridge / Ojay road network  implementation on June 1 B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects B.C. Resource Road Radio Pilot Projects New radio channels assigned over the landscape

Campbell River Channel Assignments

South Island Channel Assignments

Loading Channels  Loading channels are for communications between truck drivers and loader operators, during loading and unloading situations. They are not to be used while travelling on roads.  Upon entering a cut block, landing or sort yard the radio channel to be used will be posted along with the worksite operator’s company name.  The worksite operator may select any of the available loading channels providing it does not conflict with other users in the immediate area.  The worksite operator will be responsible for supplying and installing the LD sign. B.C. Resource Road Radio Pilot Projects

Loading Channels ChannelFrequencyTone LD-1A LD-1B LD-1C LD-2A LD-2B LD-2C LD-3A LD-3B LD-3C B.C. Resource Road Radio Pilot Projects

Loading Channel Sign B.C. Resource Road Radio Pilot Projects VHF Radio Pilot Projects

Default Call Procedure:  Call frequency: every km traveling in UP and DOWN directions  “Must call” at junctions and other key points  Call order: Road – Kilometre – Direction – Vehicle type  Rules for convoy calling B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Positive feedback from recent Trucksafe survey:  Province-wide standard supported  Majority favour “Up / Down” for call direction Opportunity to fine-tune call frequency for local conditions Changes should be developed and endorsed by a road user committee B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Evaluate pilot projects:  Test radio signal strength for 5 watt channels  Canvass road users about signs and call procedures Prepare supporting documents and recommendations for Province-wide implementation Prepare training and information materials B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects 5W channels tested at Tsitika-Eve and Ojay road networks B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects System tests included ¼ wave and ⅝ wave antennas B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Radio testing results to date:  5W channels provide adequate coverage in most cases; often getting good audible reception at 7 – 18 km  Subtle ridges can create dead spots but hard to predict by visual inspection; may reduce reception to 4 km  Adequate coverage depends on topography and road geometry  Tsitika signage has been very well received

B.C. Resource Road Radio Pilot Projects  Transceivers: must be capable of configuring narrow- band channels, and 5 or 30 W output power  Recommend antenna specifications VHF Radio Pilot Projects Developing guidelines for minimum technical requirements of radio equipment

Kilometre Signage B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects New signage “Old signage” B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects

South Island District signs B.C. Resource Road Radio Pilot Projects

 OJAY pilot captures other industrial sectors using FSRs  Different types of traffic & road users VHF Radio Pilot Projects B.C. Resource Road Radio Pilot Projects

VHF Radio Pilot Projects Steps to implementation:  Update local road users and road management groups  Review road systems and streamline road names  Delineate map polygons suitable for resource road channel assignment  Order and install “Km” and “Must Call” signs  Deliver information package to road users

 The road manager will identify the “main” road and establish branch names and numbers.  The road manager will select the point of commencement (PoC) of each road.  The PoC will normally be the log dump, highway connection or junction with another FS road.  The kilometre numbering for each branch road off the main will commence at km 0. B.C. Resource Road Radio Pilot Projects VHF Radio Pilot Projects

B.C. Resource Road Radio Pilot Projects FM Transmitters for public advisories at two sites:  Port Alberni  Tumbler Ridge  Ojay Two messages continuously broadcast:  General road safety awareness  Introduction to Radio Pilot projects VHF Radio Pilot Projects

B.C. Resource Road Radio Pilot Projects DuncanMay 13Steelworkers Union Hall7 pm Campbell RiverMay 14Anchor Inn9 am and 6 pm NanaimoMay 15Best Western Dorchester9 am and 6 pm Port AlberniMay 15Best Western Barclay1 pm Dawson CreekMay 20George Dawson Inn9 am and 6 pm ChetwyndMay 21Recreation Centre9 am and 6 pm Public meetings: VHF Radio Pilot Projects

B.C. Resource Road Radio Pilot Projects