4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.

Slides:



Advertisements
Similar presentations
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Advertisements

PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
PSB h- injection Layout issues –Are 3 or 4 KSW needed –Geometry of the injection –Element lengths and locations Element performance specifications H 0.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
Vacuum sectorisation H- Injection Some history Wim Weterings
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Transformer positions for BISMV and BSW M. Hourican 2 March 2015.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
East Area BTV upgrade 2015_09_03 S.Burger BE-BI-PM V.Clerc EN-MEF-SI I.Francescut BE-BI-ML V.deJesus EN-MEF-SI M.Lazzaroni EN-MEF-EBE … F61 line.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Review on shorter PSB main bending magnets Injection layout with short magnets Advantages & Disadvantages Wim Weterings
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Discussion and preliminary conclusions LIU-SPS dump review.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
MSE Pulsed Septum for g-2 and Mu2e Design Review A. Makarov 2/11/2016.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
News and Introduction from CERN June 15th, 2005
Linac4-PSB 160 MeV connection readiness review
SMH16 eddy current septum
LINAC4 ADVISORY COMMITTEE
Equipment simplified model SMR UR safety
ELENA installation and commissioning status
Installation of an Instrument on a CERN machine
(Beam) Impact of MTE on the PS septa
SPS - EYETS 2016/17 Vacuum systems planning
EC Activities Status for the LIU
M. Alcaide Leon, Paolo Fessia
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Possible causes for SPS ZS2 misalignment
Diffuser status October 2017
BT1 SMV10 Stripline Failure
Update on the PSB Transfer Lines
PSB-PS instrumentation for LIU
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Impedance working group update
FCC-hh injection group 7
HRS at small angles for e+/ e- pair for APEX
Presentation transcript:

4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan

4 November 2014 Mike Hourican TE/ABT2 Introduction Magnet Characteristics Layout description Progress Planning Budget + Resources Conclusions

4 November 2014 Mike Hourican TE/ABT3 Introduction The objective is to get from this setup in LSS1 To this configuration… This implies, Installation of the new MSI-V Including all supports, vacuum equipment, sector valves, quick release couplings on chambers and on electrical connections

4 November 2014 Mike Hourican TE/ABT4 Magnetic length mm Physical length mm Gap height60.4mm Horizontal aperture102mm Magnetic field0.541T ∫B.dl T.m Deflection angle mrad I peak 28.2kA Pulse width~3ms Septum thickness (copper + s.steel)mm Vacuum tank length~ 2500mm Expected lifetime # pulses The magnets from the PSB transfer line shall be recovered and re-used New vacuum tanks are required min. 2 ? New supports plus all auxiliary equipment Magnets will be stationary, no remote displacement system Magnet Characteristics

4 November 2014 Mike Hourican TE/ABT5 Layout Location SPS LSS1

4 November 2014 Mike Hourican TE/ABT6 remote clamping system Layout description.. and the complications Since this zone is very radioactive (most recent measurements, 22 mSv/h), all manipulations have to be rapid, efficient and safe. Avoid where possible the necessity to bake out the TIDVG (HP water) Plans for external dump may provide relief, but not before LS3.

4 November 2014 Mike Hourican TE/ABT7 Additional vacuum devices + supports Remote handling system for opening and closing flanges on tanks. Note: a rigid support structure is necessary for these devices. We also require a remote operated electrical connection device similar to the MSE/MST Bellows upstream and downstream Sector Vacuum valves-big!

4 November 2014 Mike Hourican TE/ABT8 Layout & Electrical Due to the current measurement precision, a DCCT shall be installed. The DCCT is very susceptible to damage from radiation so it should be installed as far as possible from the TIDVG. This implies positioning the transformers also quite far away. Longer striplines, more inductance and resistance but EPC have confirmed to place them up to 15m away. The remote operated electrical connection (2 off) shall be based on a similar system fitted to the MS. 555 ppm of the reference current. Emittance blow up due to the ripple shall be investigated (JU/TK) Use of the transverse damper shall also be investigated for damping the transverse oscillations.

4 November 2014 Mike Hourican TE/ABT9 Progress Some basic layouts have been studied and a Catia model of the vacuum tank is 50% complete, Costing is underway: Vacuum estimate received from VSC Power supply (EPC) is determined Cost impact from remote handling requirement still to be assessed. Functional Specifications are under review. The first release has been circulated and the second release shall be sent for comments / approval as soon as possible. EDMS. SPU-M-ES-0001 v.0.1 Engineering specification planned by mid ECR to be done.

Resources 4 November 2014 Mike Hourican TE/ABT10 Fast pulsed injection septum TE-ABTEPCVSCCVBIEN-STI Magnet and tank375 Power supply and stripline550 Cabling100 Vacuum mechanical (incl. sector valves)442 Vacuum controls and cable94 Water cooling tunnel25 Controls and interlocking50 Total1636 wu132100PLProvide septa for SPS upgrade wu132098PLProvide septa for SPS tpsg + MSI V ion injection septum wu132138PLProvide septa for SPS installation MSI-V, TPSG upgrade Design period allocated 2.5 months, installation foreseen 2019! Some more time required… Increased from initial estimates of approx. 300 and 150 Present apt data based on fact that PSB magnets become available only in LS2. Total resources allocated for time being 1.8 MY. Slightly low, but with some additional help from FSU may be ok. Currently no work units in EVM for ion injection

4 November 2014 Mike Hourican TE/ABT11 Problem areas The additional vacuum devices such as, remote release clamps, have been designed already for SPS (SPS , 6469 and 6470). These devices shall have to be checked and their compatibility with the new system shall be confirmed. If not compatible..? Beam Impedance screen to be designed and integrated Missing resources preparation of magnets can only begin when the SMV10 and SMV20 are no longer necessary in the PSB (PSB 2 GeV upgrade ) or begin dismantling the ‘hot’ reserve magnets at an earlier date (!?) resources assigned to design phase from 2018 only – too late!

4 November 2014 Mike Hourican TE/ABT12 Planning Design and manufacture of MSI-V Dismantling and installation in SPS Realistically one should start the project earlier. Installation in the tunnel seems ok No showstoppers and according to latest planning we have until end Feb to finish

4 November 2014 Mike Hourican TE/ABT13 Conclusions From an original fairly simple task things have changed, Increased complexity has arisen due to remote handling, radiation levels, etc Budget estimate has increased significantly since first proposal Impact of remote handling requirements still not fully clear (budget) Current stability requirement presents more challenges for the EPC team Space requirements for 2 transformers and 15m electrical connections imply more study Should make sure that sufficient resources are available early enough, before the presently planned date (ideally Q2 2016). Engineering / design resources should be available before 2018Currently no budget