Tiffany Victorian assembly instructions By Laser Dollhouse Designs.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Step-by-step assembly instructions
::Manual of Construction::. MENU OF THE MANUAL 03 Cutting the panels 07 Straight duct 08 Elbow 10 End cap 01 Bases of the system 04 Type of strips 05.
Installing a double Dreamscreen. Check measurement Left.
All elements of this presentation are Fair Use and meet copyright laws for educational purposes. This presentation may not be copied, sold, or used for.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
ICRA Panel System Installation Instructions
Typical Walk-in Closet with elfa® décor
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Stair Design Weekend Cabin Retreat Project
STAIRS AND STAIR FRAMING
Architectural CAD I – IM230
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
The Jasmine Gothic Victorian Cottage Assembly Instruction
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Quick and Easy Model Building. 3D Models Purpose: To represent the final design in a physical form that is as realistic as possible, computer- generated.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Pneumatic Arm Assembly Instructions
The Stephanie Country Mansion Dollhouse Assembly Instruction
Gable, Gambrel, and Shed Roofs
The Raven Level 2 Rubber Band-Powered Flight. Dimensions 2”
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Hand-cranked Windmill Assembly Instructions copyright Mechanical Kits Ltd
The Ariel Assembly Instruction By Laser Dollhouse Designs.
The Jasmine Gothic Victorian Dollhouse Assembly Instruction
Basic Stairway Arrangements • Stairway Components
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
STAIRS AND STAIR FRAMING
SHED CONSTRUCTION A Visual Guide. C.A.D. Example.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe SESSION 2.
Spring 2010 Revell SSP ’57 Cadillac Eldorado Brougham Build By David K. Lee.
Mars Reconnaissance Orbiter1:48 scale READ ALL THE INSTRUCTIONS AND INSPECT THE PARTS SHEETS FIRST. Score fold lines and cut out the parts. High Gain Antenna.
DEEP SPACE PROBE by KEVIN COCOZZOLI. Datum Line Technical Specifications: Length:……………………..…16 3/8” Weight:………………..3.5 oz/99.2 g Lift off weight:……..4.5.
Roof and Ceiling Framing
What goes up and down but never moves?
Step-by-step assembly instructions
Scratch Build a Water Tower
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
EDT Cabin Design Project - Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300 Kenneth Fitzpatrick, P.E.
The Victorian Gazebo Assembly Instruction By Laser Dollhouse Designs.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Gingerbread House Construction Instructions graham crackers 2.Knife 3.Cutting board 4.Hot glue gun 5.Base for house (paper plate)
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
The Glenrose assembly Instructions By Laser Dollhouse Designs.
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Lighten Up! Single Window Kits Add Light and Appeal To Home Bathrooms.
Quick and Easy Model Building
The Reading Tug – Schuylkill By: Barry Hensel
Hand-cranked Windmill Assembly Instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Building a Nightstand Woods 1 Final Project Step #1
Step-by-step assembly instructions
The Abriana Assembly Instruction By Laser Dollhouse Designs
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
The Garage Assembly Instruction By Laser Dollhouse Designs
Straight run stairs A stairway that has no turns..
The Victorian Gazebo II Assembly Instruction
Creating Elevations from a floor plan
Step-by-step assembly instructions
Step-by-step assembly instructions
The Country Outhouse assembly Instruction By Laser Dollhouse Designs
Presentation transcript:

Tiffany Victorian assembly instructions By Laser Dollhouse Designs

Tiffany Victorian Parts First Floor baseSecond Floor baseThird Floor baseFrench Door (1) Oval door frames (2) Half oval(2) Interior doors (5) Exterior doors (2) Straight stairs (2) Unassembled Subfloor support rails Interior/ exterior walls First floor 1A thru 1M Second Floor 2A thru 2N Third Floor 3A thru 3E Porch frames and rails Porch Posts 15- long 3-short Alcove roof panels Main roof panels Window Frames Front porch stair assembly Interior stair safety rails (comes unassembled) Set of two long and one short 13 spindles, 6 rails Shingles Alcove roof trim Main roof trim

NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also give you a chance to visualize how you want to approach the build. Materials for build; 1.Wood glue, you may use Titebond, elmers or any good wood glue 2.Masking tape to hold house in place during assembly and gluing. 3.Utility knife for cutting out shingles and forming exterior frames after shingling roof grit sandpaper 5.Alcohol for cleaning laser burn areas and post (optional) 6.Your choice of paint, recommend spray paint and a spray sealer for small items.

NOTE: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also give you a chance to visualize how you want to approach the build. Instructions cover basic assembly not when to paint, stain, or glue as this depends on you build and what you are adding. THIS IS WHY IT IS IMPORTANT TO DO A DRY ASSEMBLY!!! Once dry assembly completed prep, paint, wallpaper and stain all items for assembly and glue in place. Step 1. Locate base floor and support rails, turn base upside down and insert support rail skirts. See figure 1 Figure 1 Figure 2 Step 2. (SKIP STEP IF DRY ASSEMBLING) Install interior window frames, when installing place frame on interior side and align to where you see equal amount of frame on each side when viewing from the front. Once in place add a small amount of super glue from the front opening along the frame and window edge. See figure 2

Step 3. Install Interior and exterior doors to walls and frames. See figure 3 ONLY GLUE IN FINAL ASSEMBLY. Figure 3 Figure 4 Step 4. Install walls 1A thru 1M to assembled first floor base. See figure 4.

Step 5. Install second floor on to the first floor walls. Figure 5 Figure 5 Figure 6 Step 6. Stairs assembly, locate stair case. The bottom riser (step) is the side with the ¼ “ square dowel. Figure 6 Bottom Top

Step 7. Install tread to each step. For this house we will have our handrail on the right side. Make sure to glue in place with the square cutouts to the right for your spindles. Figure 7 Figure 7 Figure 8 Step 8. Install the spindles with the slop facing back. As in Figure 8. seat the spindles firmly within the square cutouts. They should seat to the first bottom grove in the spindle.

Step 9. with spindles installed, now glue to the front riser a newel post. Make sure post is aligned to the outside of the first riser and the spindles are centered. Figure 9 Figure 9 Figure 10 Step 10. Install the handrail. First glue to lower newel post, view rail angle to spindles and starting from the bottom glue each spindle to rail. Adjust to rail angle. (Do not push rail to spindle as this will result in your rail not being straight.) Adjust spindle angle by prushing fwd or back to change angle. Figure 10

Step 11. Glue top Newel post to front of handrail and top tread. Figure 11 repeat steps for second floor stairs. Paint and let dry. Figure 11 Figure 12 Step 12. assemble side long safety stair rails (x2), using 5 spindles evenly spaced along the rail and mark. Next glue to handrail. Figures 12 and 13. Figure 13

Step 13. install top handrail making sure it aligns to bottom rail. Figure 14. repeat steps for second set for third floor. Figure 14 Figure 15 Step 14. Using 3 spindles repeat steps to assemble as you did earlier. Figure 15 you should now have one short and two long sets of safety rails Figure 16 Step 15. Install 3 newel post forming an L shape with the small run to the left (third Floors) and 2 newel post forming one rail for the second floor. See figure 16, paint and let dry.

Step 16. Locate porch stair assembly, figure 17 Figure 17 Figure 18 Step 17. Apply treads with cutouts evenly across each step. Figure 18. Figure 19 Step 18. Install stair spindles with angle towards front. Figure 19, make sure each one seat in the cutout.

Step 19. Install a newel post to each end gluing to the front riser (step) and aligned to edge of stair assembly, centered with spindles. Figure 20. Figure 20 Figure 21 Step 20. Install handrails by gluing to newel post and centering onto spindles. Figure 21, paint and let dry. Figure 22 Step 21. Install stairs glue even to floor so that it is flush. Figure 22

Step 22. Install single run safety rail and the second floors walls. Figure 23. Make sure all doors, door frames and windows are installed prior to gluing. Figure 23 Figure 24 Step 23. Install third floor onto second floor walls, glue and let dry. Figure 24

Step 24. Install stairs and glue flush to third floor. Figure 25 Figure 25 Figure 26 Step 25. Using wall 3A as reference install “L” shaped safety rail aligning to wall and front of stair post. Figure 26.

Step 26. Install 3 rd floor walls 3A, 3B, and 3C. Figure 27. Make sure doors, door frames, and windows and installed prior to gluing. Figure 27 Figure 28 Step 27. Install main roof panels front and rear and glue third floor down. Figure 28.

Step 28. Install 3 rd floor walls 3D and 3E, figure 30 Figure 30 Figure 31 Step 29. Install front Alcove roof panels and glue down in place. Figure 31 From the inside align alcove panels to main roof opening and glue in place. Figure 32 Figure 32

Step 30. Install Main roof running trim. Figure 33 Figure 33 Figure 34 Step 31. Install front Alcove roof gables. Figure 34 Figure 35 Step 32. Install main roof side gables. Figure 35

Step 33. Divide all porch trim into pairs by pairing top and bottom rails by length. You should end up with 3 single bottom rails. All other should be paired up, the longest set will divide up into the first floor top rail over the steps and the bottom rail for the second floor between alcoves. Now using the engraved marks on the first floor divide up into there prospective sections and move forward with post placement. Starting at one end glue a bottom rail to two post and install to the first floor. Use the engraved marks as post position reference. Figure 36. DO NOT GLUE TOP OF POST TO SECOND FLOOR. Figure 36 Figure 37 Figure 38 Step 34. Using front installed post continue installing post on side of house. Remember do not glue to ceiling. Figure 38

Step 35. Take longest top rail and glue in front of house adding a post to the right. This is the porch opening for the porch stairs. Figure 39. Figure 39 Figure 40 Step 36. Continue installing porch assembly until all post and rails are installed. Figure 40. Now lay house on side and apply small amount of superglue to top of post (figure 41) and press together. Figure 41

Step 37. Using the same process apply to the second floor two post with a bottom rail, figure 42 and continue around the side applying the side post and rails. Figure 43 Figure 42 Figure 43 Step 38. Install single long bottom rail and post starting assembly to the right. Figure 44. Figure 44

Step 39. Continue with porch post assembly installing last large post and upper lower rails. Figure 45 Figure 45 Figure 46 Step 40. Install small post and single lower rail completing porch assembly. Glue top of post to 3 rd floor.

Step 41. Glue in porch steps. Figure 47. Figure 47 Step 42. Install main roof shingles. Figure 48 Figure 48 Figure 49Step 43. Alcove roof shingles, start at bottom and work way up gluing shingles to align to the mark on the center front of each shingle and the roof shingles. Figure 49

Step 44. Continue as seen in figure 50 again following main roof shingles and mid line on prior installed shingle. Continue to top. Last shingle aligns to lower shingle. Figure 50 Step 45. Do the same process for the remaining three front panels. Figure 51. Figure 51

Step 46. Stain roof shingles and Install alcove roof running trim, figure 52. The house is now completed. Figure 52

Laser Dollhouse Designs.