HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE

Slides:



Advertisements
Similar presentations
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Advertisements

Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
Tool Classification.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Safely Using Drill Collar Clamps
Toggle Bolt When the screw is tightened a firm anchorage is made.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Build the Tumbler.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Installation. Indoor Unit Installation Typical Installation.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
MyLock 644D Service Seminar.
Tools English for Careers Class. tool belt A tool belt is used to hold tools on your body.
Typical Walk-in Closet with elfa® décor
Fabrication of Fishtank Platform EAS 199B living with the lab.
Maintaining Gage Datum: Levels at Gaging Stations.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Session 8 Type IX Crash Cushion CAT-350 Trinity Highway Products
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Electrician’s Tools Of The Trade Copyright © Texas Education Agency, All rights reserved.
By:Gord Darling Construction Technology
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
Created by Travis Pettaway
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
Differential Leveling
Electrician’s Tools Of The Trade
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Mr. D’s Quick Guide to.  Hand tools is any tool where the force comes from the human user. These have been used for thousands of years.  Power Tools.
Tool Identification Ag Structures.
ALLEN & TORX WRENCHES NUT DRIVERS NUT DRIVERS SCREWDRIVER HANDLE WITH A SOCKET BUILT ON NOT MUCH TURNING POWER WORKS WELL FOR SMALL NUTS OR SCREWS THAT.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
General Instructions for “KidWind Light” wind tunnel.
New Mexico FFA Agricultural Mechanics Career Development Event Supplies and Materials.
Hand Tools, Fasteners, and Hardware
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
POWER TOOLS Electric drills
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
6.03 Tools in Agricultural Engineering Obj. 6.03: Remember tools and their safety practices related to the agricultural mechanics industry Images courtesy.
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Objective 6.03 Remember tools and their safety practices related to the agricultural mechanics industry.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
Agricultural Engineering 7.0 Careers related to the agricultural engineering industry.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
… OF THE TRADE. TOOLS…. HAND TOOLS Tape Measure Usually metal, housed in a metal or plastic case Feature self-return spring to retract Range from 6-25.
VETERAN TECHNICAL INSPECTORS ADVANCED SEMINAR 2015.
Tool Identification. TURNING TOOLS Turn nuts, bolts, and screws.
Description of Hand Tools Tools help us do work and make things. Tools.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Rotating Compost Barrel Construction
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
Common Woodworking Hand Tools
Jr. Hi. Shop 2017 General tools.
Remember tools and their safety practices related to the agricultural mechanics industry. Objective 6.03.
Woodworking Hardware Ag Mech I Standard 6:4-5.
Tools.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. a. Identify various types of nails and cite uses.
Hand Tools.
Module 6 Antenna Assembly and Look up Angles
T400 Motor Replacement.
Unit: Surveying Lesson: Differential Leveling
Mounting a BalanceBox®650 to a brick wall
Ag Mechanics Tools.
Clamping and Boring Tools
Differential Leveling
Presentation transcript:

HYDROLOGIC FIELDWORK MANUAL STAGE GAGE INSTALLATION AND MAINTENANCE TIPPING-BUCKET RAIN GAGE INSTALLATION SURVEYING (LEVELING) E-19 REVISION

MANUAL GAGE INSTALLATION AND MAINTENANCE STAFF GAGE WIRE-WEIGHT GAGE

STAFF GAGE INSTALLATION

STAFF GAGE INSTALLATION

STAFF GAGE INSTALLATION

STAFF GAGE INSTALLATION GET PERMISSION FROM BRIDGE OR POWER POLE OWNER BEFORE INSTALLING A STAFF GAGE ON THE STRUCTURE. A WRITTEN APPLICATION WITH DRAWING SHOWING HOW GAGE WILL BE ATTACHED TO THE BRIDGE IS SOMETIMES REQUIRED.

STAFF GAGE INSTALLATION SURVEY THE GAGE SITE AND DETERMINE THE STAGE AT THE BASE OF THE STRUCTURE (POWER POLE OR BRIDGE PIER). THIS IS THE STARTING STAGE FOR CONSTRUCTING THE STAFF GAGE. MARK THE STRUCTURE AT A SPECIFIC STAGE. LINE-UP THE STAFF GAGE WITH THE SPECIFIC STAGE MARKED ON THE POLE OR PIER AND ATTACH IT. EXTEND THE GAGE ABOVE THE FLOOD OF RECORD.

STAFF GAGE INSTALLATION FOR ATTACHMENT TO A WOOD SURFACE, USE RUST RESISTANT WOOD/LAG SCREWS. FOR ATTACHMENT TO CONCRETE, DRILL HOLES IN THE CONCRETE AND MOUNT THE STAFF GAGE USING CONCRETE SCREWS (E.G.,TAPCONS). OPTIONALLY, MOUNT THE STAFF GAGE ON A PIECE OF TREATED LUMBER (E.G., 2”X12”) AND MOUNT THE LUMBER TO THE CONCRETE SURFACE USING STEEL ANCHORS AND BOLTS, OR SELF-ANCHORING BOLTS.

STAFF GAGE INSTALLATION TOOLS NEEDED: 3/8” DRILL FOR WOOD DRILLING 3/8” OR ½” HAMMER DRILL FOR CONCRETE DRILLING WOOD AND/OR CONCRETE DRILL BITS PORTABLE GENERATOR UNLESS DRILL IS BATTERY POWERED. SCREWS/BOLTS/WASHERS SCREWDRIVER AND WRENCH HAMMER CARPENTER’S LEVEL

WIRE-WEIGHT GAGE INSTALLATION OLDER STEEL RAILING WITH VERTICAL POSTS

WIRE-WEIGHT GAGE INSTALLATION NARROW STEEL RAILING

WIRE-WEIGHT GAGE INSTALLATION NEWER STEEL RAILING WITH VERTICAL POSTS

WIRE-WEIGHT GAGE INSTALLATION CONCRETE RAILING WITH OPENINGIS

WIRE-WEIGHT GAGE INSTALLATION CONCRETE RAILING WITH OPENINGS

WIRE-WEIGHT GAGE INSTALLATION SOLID CONCRETE RAILING

WIRE-WEIGHT GAGE INSTALLATION GET PERMISSION FROM BRIDGE OWNER BEFORE INSTALLING A MANUAL STAGE GAGE ON THE BRIDGE. A WRITTEN APPLICATION WITH DRAWING SHOWING HOW GAGE WILL BE ATTACHED TO THE BRIDGE IS SOMETIMES REQUIRED.

WIRE-WEIGHT GAGE INSTALLATION SET UP SAFETY SIGNS AND CONES

WIRE-WEIGHT GAGE INSTALLATION MEASURE THE RAILING

WIRE-WEIGHT GAGE INSTALLATION CREATE THE BRACKETS – 3/8” OR ½” THREADED ROD

WIRE-WEIGHT GAGE INSTALLATION DRILL HOLES IN GAGE FOR THE BRACKETS

WIRE-WEIGHT GAGE INSTALLATION ATTACH GAGE TO BRIDGE RAIL

WIRE-WEIGHT GAGE INSTALLATION ATTACH GAGE TO BRIDGE RAIL

WIRE-WEIGHT GAGE INSTALLATION ATTACH WEIGHT AND LOCK

WIRE-WEIGHT GAGE INSTALLATION INSTALL A SAFETY RAILING IF THE BRIDGE RAILING IS LESS THAN 39 INCHES HIGH.

SURVEY WIRE-WEIGHT GAGE HOLD SURVEY ROD ON BENCHMARK OR REFERENCE MARK OF KNOWN ELEVATION.

WIRE-WEIGHT GAGE INSTALLATION TAKE A BACK SIGHT (BS) READING ON THE SURVEY ROD USING A LEVEL. THIS GIVES YOU THE HEIGHT OF THE INSTRUMENT (HI).

WIRE-WEIGHT GAGE INSTALLATION HOLD THE SURVEY ROD ON THE CHECKBAR OF THE WIRE-WEIGHT GAGE. READ THE ROD USING THE LEVEL. SUBTRACT THE ROD READING (FORESIGHT, FS) FROM THE HEIGHT OF THE INSTRUMENT TO GET THE CHECKBAR ELEVATION.

WIRE-WEIGHT GAGE CALIBRATION SUBTRACT THE ZERO DATUM OF THE GAGE FROM THE CHECKBAR ELEVATION TO GET THE NORMAL CHECKBAR READING FOR THE GAGE. IF CHECKBAR EL = 742.98 FT AND ZERO DATUM EL = 695.24 FT, THE NORMAL CHECKBAR READING IS 742.98 MINUS 695.24, OR 47.74.

WIRE-WEIGHT GAGE CALIBRATION SET THE NORMAL CHECKBAR READING BY LOOSENING 2 SCREWS ON LEFT SIDE OF THE GAGE. HOLD DRUM TO PREVENT DRUM FROM TURNING. REST WIRE-WEIGHT ON CHECKBAR, HOLD DRUM, AND TURN HANDLE UNTIL THE CORRECT CHECKBAR READING OCCURS. TIGHTEN SCREWS.

WIRE-WEIGHT GAGE CALIBRATION IF NECESSARY, ADJUST THE HANDLE SO THAT IT EXTENDS TOWARD THE BACK OF THE GAGE. THIS ENABLES THE WIRE-WEIGHT GAGE COVER TO CLOSE.

WIRE-WEIGHT GAGE MAINTENCE DEMONSTRATION

RAIN GAGE INSTALLATION AT U.S.GEOLOGICAL SURVEY (USGS) GAGE SITES GET PERMISSION FROM USGS BEFORE ATTACHING EQUIPMENT TO THEIR GAGE SHELTERS. MAKE SURE THAT THE USGS WILL HOOK UP THE RAIN GAGE TO THEIR DATA COLLECTION PLATFORM (DCP) IF YOU INSTALL THE GAGE.

RAIN GAGE INSTALLATION

RAIN GAGE INSTALLATION

RAIN GAGE INSTALLATION 1. One 10 foot long 1 1/2 inch EMT conduit pipe .................. $ 20.49 2. One 1.5 inch EMT set screw coupling ............................ $ 1.55 (Note the set screws are just slotted screw driver type) 3. Two each SS#2 (3/4 – 1 3/4 inch) adjustable hose clamps $ 1.96 4. Four each 5/16 x 1  inch hex bolts ................................ $ .56 5. Four each 5/16 hex nuts ................................................ $ .24 6. Four each 5/16 fender washers ...................................... $ .64 7. Two each U bolts with 2" wide opening, 4" deep ....... $ 2.38 8. Two each L shaped corner brace 10" x 1-1/4" ....... $ 15.18 Total cost ........................................................................... $ 43.00