Test stand for CO 2 accumulator electric heaters Maciej Ostręga10.12.2014.

Slides:



Advertisements
Similar presentations
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI.
Advertisements

Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
FPGA PID Heater/Cooler Controller Galt Design, Inc.
STARLight PDR 3 Oct ‘01 G.1.1 Rashid STARLight STARLight Thermal Tahir Rashid STARLight Mechanical Engineer (734)
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
A fuse contains a thin wire that heats up and melts if too much current passes through it. The rating of a fuse is the maximum current that can pass through.
Energy Performance Certificates. Energy Efficiency Rating This chart tells us how energy efficient a building is. This efficiency depends on the construction.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
INSULATION TESTER CALIBRATION Using the 3200 Electrical Test Calibrator.
Test stand for CO 2 accumulator electric heaters Maciej Ostręga, Piotr Dziurdzia
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
SEEM Tool Overview Regional Technical Forum Member Orientation January 22, 2013.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Marine Motors Type approved low voltage motors
Construction Unit 5, Lesson 3 Explanation © 2011 International Technology and Engineering Educators Association, STEM  Center for Teaching and Learning™
REVIEW OF ELECTRICITY IT’S LIKE A LESSON THAT ASSUMES YOU ALREADY LEARNED THIS STUFF!
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
Earth’s Changing Environment Lecture 23 Fred’s Utility Bill.
Pixel Heaters Refurbishment A.Bitadze.
Quiz on Domestic Electrical Appliances. 1. A resistance coil is also called a heating coil. a fuse. an earth wire. a live wire.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
Remember... Resistance in Mechanical systems (friction) opposes motion of solid objects.
Electricity Basics of electricity. Electricity Atoms – The smallest unit of each element Electrons – negatively charged particles in atoms Ions – charged.
S3 Revsion. Forces – Worked Example Forces acting on a beam worked example 100N 3m 2m R1 P Moment = Force x Distance 100N x 5m = 500Nm Force R1 = Moment.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
IBL cooling operation at bake-out IBL CO2 meeting 10 April 2014 Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Olivier Crespo Lopez 1.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
TRACI Status Meeting Overview of the TRACI 100-W CO 2 cooling machine Bart Verlaat 22 September
PAT TESTER CALIBRATION Using the 3200 Electrical Test Calibrator.
Pressure drops over cooling pipes Richard French, Richard Bates, Alex Bitadze.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Specific Heat Capacity. The specific heat capacity is the amount of energy required to increase the temperature of 1kg of a substance by 1˚C We will calculate.
D4. Explain the relationship among voltage, current, and resistance in a simple series circuit. Voltagecurrentresistance Low Voltage: High Voltage:
Analogous Behavior Concepts: Circuit theory, Translational Mechanics Equations: voltage (V) = current (i) x resistance (R) Force (f) = Velocity (v) x Damper.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
 V s /V p = N s /N p  I p V p = I s V s  I p /I s = V s /V p = N s /N p  V s = (N s /N p )V p  I s = (N p /N s )I p  P = VI; I = P/V (I.
Thermal Technology. 1.Use computers and calculators to access, retrieve, organize, process, maintain, interpret, and evaluate data and information in.
ELECTRIC CURRENT E Q: WHAT ARE THE 2 TYPES OF CURRENT AND WHAT IS THE DIFFERENCE BETWEEN THEM?
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
HQ02 TEST STATUS April 4, 2013 FERMILAB. Test status  Magnet delivery to FermilabApr. 02  SG checkoutApr. 04  LE & RE interface plate mounting Apr.
ΜΕΤΑΣΥΛΛΕΚΤΙΚΗ ΦΥΣΙΟΛΟΓΙΑ ΕΡΓΑΣΤΗΡΙΟ 3. Μετασυλλεκτική Εργ3-Λιοσάτου Γ.2 ΒΙΟΛΟΓΙΚΟΙ ΠΑΡΑΓΟΝΤΕΣ ΠΟΥ ΕΠΗΡΕΑΖΟΥΝ ΤΗ ΦΘΟΡΑ ΤΩΝ ΟΠΩΡΟΚΗΠΕΥΤΙΚΩΝ Αναπνοή Η λειτουργία.
Mauritius Standards Bureau
IBBelle: Status & Plans
Internship final presentation
Detector Cooling Project WP2 CO2 activities status report
Teleconference ACS – FREIA 17th October 2017
IBL CO2 cooling control system development status
Types of transformers.
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Electrical Junction Boxes in UAE | SPPE
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Resistance.
R101 amendment Proposal from German
Discussion: Discuss the IT needs of each process..
اثرات گرمايش جهاني تغييرات آب و هوا، تأثيرات عميق و شديدي بر بسياري از عوامل اساسي موثر بر سلامت از جمله : آب، غذا، هوا و محيط زيست دارد كه اين مورد خود.
Carbon Footprint.
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Carbon Footprint.
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
Unit 3 Review (Calculator)
What to include in your inventory interim report and the rubric for 1
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Construction Unit 5, Lesson 3 Explanation Presentation 5.3.1
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
CO2 progress and issues on the control systems
Electrical integrity of magnets and coils
Introduction of the IEC Modification Proposal 61/5925/INF
Presentation transcript:

Test stand for CO 2 accumulator electric heaters Maciej Ostręga

Status Test stand description document releasedTest stand description document released Test stand for CO2 accumulator electric heater.docx (DFS)Test stand for CO2 accumulator electric heater.docx (DFS) Excel database for measurements releasedExcel database for measurements released Accumulator electric heater - DATA.xlsx (DFS)Accumulator electric heater - DATA.xlsx (DFS) Test stand under constructionTest stand under construction New heaters ordered (delivery -January)New heaters ordered (delivery -January)

Test stand

Designed by Tomasz Kucharski

Test stand - under construction

Test procedure electrical measurements heating with cooling (setpoint high) no heating with cooling (setpoint -40 °C) more details: (DFS) …/PROJECTS/ Accumulator_Heaters_Teststand/DOCUMENTS/ Test stand for CO2 accumulator electric heater.docx Accumulator electric heater - DATA.xlsx

Electrical measurements resistance of the heater insulation resistance earth leakage current more details: (DFS) …/PROJECTS/ Accumulator_Heaters_Teststand/DOCUMENTS/ Test stand for CO2 accumulator electric heater.docx Accumulator electric heater - DATA.xlsx Calculated EH resistance [Ω] Measured EH resistance [Ω] Insulation resistance [MΩ] Comments Calculated earth leakage current at 230VMeasured earth leakage current Voltage during the measurements [V] Calculated insulation resistance [MΩ] Test voltage >>50V100V250V500V1000V[mA][uA][mA][uA] L/PE over the measurement range ( >11 GΩ) E N/PE over the measurement range ( >11 GΩ) E

TODO electrical and mechanical assembly chiller filling (C 6 F 14 )