UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions reduction George Mavrotas.
Clean Energy Project Analysis Course Greenhouse Gas Emission Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – Photo.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
Will CO2 Change What We Do?
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Bandula S. Tilakasena Project Director Trincomalee Coal Power Project Ceylon Electricity Board 21 October, 2007 Pricing policy for renewable energy: Avoided.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Eng Rafik G. M. of Economic and Environment Studies NREA Baseline For Japanese Wind Power Plant Project in Zafarana (Arab Republic of Egypt)
22 April 2010 EWEC 2010 Warsaw2 Jesper Munksgaard Ph.D., Senior Consultant Merit Order Effect of Wind Power – Impact on EU 2020 Electricity Prices.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
The contribution of electro-technologies to energy efficiency Paul Baudry, Marie-Ann Evans UIE (International Union for Electricity applications) Conference.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Capacity Development for Clean Development Mechanism Project Idea Note (PIN) Preparation by Kofi Asante.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Thailand, May 2009 Mekong Energy and Ecology Network The First Mekong Energy and Ecology Training.
Standardized approaches in CDM methodologies Daniel Perczyk 7th Joint Workshop 13/03/2011.
Opportunities and Constraints on Possible Options for Transport Sector CDM Projects – Brazilian Case Studies Suzana Kahn Ribeiro Importance of Transport.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
1 Electricity Baselines for Grid- Connected Renewables: ACM 0002 Issues and Options Michael Lazarus, SEI Workshop on CDM Methodologies and Technical Issues.
“Baselines for Small-scale CDM " Jørgen Fenhann, UNEP Risø Centre National CD4CDM workshop Casablanca January Content of the presentation: Present.
Simplified Financial Analysis for Landfill Gas Capture Projects Presented By: Dr. M. K. Elewa TIMS - Egypt Approved Baseline and Monitoring Methodology.
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
CD4CDMCD4CDM Estimating CO 2 Emissions Reduction by example.
Second SSA Regional Workshop on « Capacity Development for the Clean Development Mechanism » Organizedby:Energy Research Centre (ERC), South Africa and.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
DAC PROJECT Capacity Building in Balcan Countries for the Abatement of Greenhouse Gases Setting priorities for GHG emissions’ reduction George Mavrotas.
Bishkek, 7th of December 2009 Training Workshop: Baseline Study of the Kyrgyz Power Sector for Clean Development Mechanism Presentation III: Case Study.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Taking the Lead: State Innovations to Reduce Greenhouse Gases Bill Becker STAPPA/ALAPCO February 28, 2002.
1 Second Regional Workshop Capacity Development for the Clean Development Mechanism (CD4CDM) 23 March 2004 Siem Reap, Cambodia A.T. Biopower Rice Husk.
Examples Economics and EROEI for Conservation and Solar Power Systems.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Capacity promotion in research and education on clean development mechanism (CDM) Preliminary results and plan to implement the task 5 in year
1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Research Center for Energy &Environment Case study on Quang Tri wind power project and the needs for capability development Dr. Nguyen Duc Minh Dr. Nguyen.
The infuriating inconsistency of network electricity carbon intensity Andrew Peacock Heriot Watt University.
California Energy Commission IEPR Lead Commissioner Workshop University of California, Irvine August 17,
UNEP Collaborating Centre on Energy and Environment Rules for Small-Scale CDM Projects Prepared for the CD4CDM Regional Workshop in Tunis January.
Capacity building and awareness creation in Vietnam UNEP The first regional workshop and training on capacity development for clean development mechanism.
Update on methodological work within UNFCCC and future outlook Workshop on CDM Methodologies and Technical Issues 3 rd December, 2005 Montreal, Canada.
Key Findings Utility & Environmental Implications Table 5b: Generation capacity mix at selected energy tax rates in year 2025 Issue 1 Energy Tax Power.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
SHP – Columbia University
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Greening the Grid with America’s Nuclear Power Plants.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Betül Özer, Erdem Görgün, Selahattin İncecik
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Asian Region Workshop on CD4CDM October 2005, AIT, Bangkok, Thailand Development of Pipeline of CDM projects in Vietnam Nguyen Mong Cuong Vietnam.
Presentation transcript:

UNEP rise centre - Demark Fourth regional workshop and training on “Capacity development for the clean development mechanism” 4-6 April - AIT Thailand Report, Case study 2 Study baseline methodology in Vietnam comments and proposal By Dr. Bui Huy Phung Dr. Nguyen Tien Nguyen VN CD for CDM

Key contents Part I. Study to build the typical baseline for Vietnam electrical grid 1.1. Methodology 1.2. Data needed 1.3. Result of typical baseline calculation for Vietnam electricity grid Part II. Comments and proposal Comments 2.2. Proposals used.

Part I. Study to build the typical baseline for Vietnam electrical grid 1.1. Methodology There are 2 specific guides issued by EB to calculate baseline emission factor for the grid. Appendix B of the simplified modalities and procedures for small-scale CDM project activities Consolidated baseline methodology for grid connected electricity generation from renewable sources Following quanlities must be calculated: -The operating margin emission factor (EF-OM) -The build margin emission factor (EFBM) -The baseline emission factor EF.

1.1. Methodology (cont.) a.Based on guiders of appendix B, following calculation formular are used EF-OM (t CO2eq/kWh)=  Ej/  Gj Ej is CO2 emission per year in tons for fuel j- tCO2/year Gj: electricity generation from fuel j EF-BM (tCO2eq/kWh)=  EFy.GENi /  GENi EFi- the emission rate for unit i (tCO2/kWh) GENi - the generation (kWh) from unit i. Calculate 1/2(EFOM + EFBM) Calculate GA-weighted average emission of all power plants (grid average) GA=  Ej /  GENj

1.1. Methodology (cont.) b) Based on consolidated baseline methodology Calculate the operating margin emission factor (EFOMy) +Simple OM, EFOM simp. y - the generation weighted average emission per electricity unit of all generating sources serving in the system EFOM,y=  Fi,j y*COEFij /  GENj,y Fi,j,y- the mass of fuel i consumed by sources j in year y +Simple adjusted OM In this case, power sources include imports and are separated in low cost /must-run power plants.

b) Based on consolidated baseline methodology (cont.) +Dispatch data analysis OM EF OM, Disp j = E OM y /EGy In which EGy - generation of project in year y (kWh, MWh) E OM y =  EG h *EF DDh EGh - the generation in each hour h, and EFDDh - the hourly generation weighted average emission per electricity unit of the set of power plants (n) in the top 10% of grid dispatch order during hour h. +Average OM aver EF OM -aver is calculated as the average emission rate of all power plants, using equation described for the simple OM above, but including low-operating cost and must-run power plants.

1.1. Methodology (cont.) c) The build margin emission factor Calculate EF BM,y as the generation weighted average emission factor of power plants (m) d) Calculate the baseline emission factor EFy EFy = W OM EF OM y + W BM EF BM y When using this methodology there are a lot of difficulties It is short of day-night typical load diagram of grid in dry season and rainy season, (or typical day of year) specially for future Dispatch data is not available so it can not to analyze OM It is complicated to identify low cost/must run power sources, specially for future Etc. So it is not able to calculate EFOM as requested conditions.

1.2. Needed key data COEFj - CO2 emission per unite for each fuel j LHVj - low heat value of fuel j GENj - electricity generation from fuel j (kWh. MWh,…) 5 most recent plants and their performances Or the most recent 20% of existing plants and their performances Forecasted data of power plants and grid in study periods etc

1.3. Result of typical baseline calculation for Vietnam electricity grid a) Based on appendix B Table 1: Baseline emission factors of the Vietnam national grid, gCO 2 /kWh End of year GA OM BM ½ OM + ½ BM

Figure 1. emission factors of the Vietnam national grid during period of

b) In case of consolidated baseline methodology According to Simple OM Table 2: Baseline emission factor calculated in OM simple, gCO 2 /kWh End of year Most recent 3- year average Commis- sioning year

Figure 2: Baseline emission factor calculated in Simple OM

Table 3: Baseline emission factor calculated in OM average, gCO 2 /kWh End of year Most recent 3- year average Commis- sioning year

Figure 3: Baseline emission factor calculated in Average OM

Part II. Comments and proposals 2.1. Comments Based on using methodologies and calculation, we can conclude as following: –Two specific guiders issued by EB to calculate baseline emission factor are interesting, conservative, that help developers to calculate baseline in their condition. –Baseline emission factors calculated in different options or methodologies will be different. So depending on specific project, applicable conditions, project developers can select an suitable baseline emission factor. In Vietnam case study : –Emission factors of power plants using different fuels are different + Using coal coming down from 1.5 kgCO 2 /kWh to 1.0 kgCO 2 /kWh by 2010 year ; + Using oil is about 0.9 kgCO 2 /kWh ; + Using gas is about 0.45 kgCO 2 /kWh –Average emission factor of system (1/2OM+1/2BM) having a decreased trend and varying from 0.5 to 0.6 kgCO 2 /kWh.

2.1. Comments (cont.) Based on OM curves, it is seen that the baseline emission factors decrease strongly because of increasing thermal plants efficiency and more gas-fired plants built. But since 2006, mainly coal-fired plants will be built, so the factors will be lightly increased. Since 2002, more thermal power plants are built, this is described on the BM curves, but since 2006, hydropower plants will be relatively large built, so the BM factor will decrease. However, curves of average OM and BM as well as GA curves are relatively stable.

2.2. Used proposals a) Project registered in 2005, started operating in 2008, with crediting of 10 years Small-scale project: select the table 1 above, at column of year of 2005, can choose emission factors of ½ OM+ ½ BM (555.4 gCO­ 2 /kWh). Large scale project: + If total 5 years average hydropower output generated is less than 50% of total electricity output generated of the grid, table 2 will be selected. Then there are 2 emission factors: if based on the most recent statistics available at the time of Project Design Document (PDD) submission then 3 years average emission factor will be used, column of year of 2005 will be chosen (575.9 gCO 2 /kWh); if based on commissioning year then column of year of 2008 will be chosen (574.6 gCO 2 /kWh).

+ Or if total 5 years average hydropower output generated is more than 50% of total electricity output generated of the grid, table 3 will be selected. Then there are 2 emission factors: if based on the most recent statistics available at the time of PDD submission then 3 years average emission factor will be used, column of year of 2005 will be chosen (442.5 gCO 2 /kWh); if based on commissioning year then column of year of 2008 will be chosen (476.3 gCO­ 2 /kWh). This emission factor will used for project emission reduction calculation for whole 10 year crediting period. b) Project with crediting of 7 years registered in 2005, started operating in 2008: is similar to for crediting of 10 years above, the difference is the emission factor only used in 7 years, if it is continued in more 7 years, the emission factor will has to be re-calculated. Then the new factor may be different from the old one because of data changes Used proposals (cont.)

Thank you ! Contact address: