Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Time Meeting 1/13/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
7/3/2014 PHENIX WEEKLY PLANNING July 3, 2014 Don Lynch 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Ladder QA manual. Check items 1 Interlock - Temperature of NOVEC. ✓ Check the difference from the value where the QA in RIKEN was performed is less than.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
FVTX High Multiplicity Trigger for Run15
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Radiation Laboratory Meeting
Maki KUROSAWA VTX Group 2014 Feb 20
VTX readiness for RUN15 Y. Akiba.
Schedule after Shutdown
Presentation transcript:

Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting 1/20/2015 Status of Preparations PHENIX is still pushing hard to be ready for Run 15 start on January 27, Pink sheeting is complete. Blue sheeting is complete, signoff for flammable gas after shield wall roll-in. White sheeting should be complete today. Shield wall rolled in tomorrow. Full shifts began today. MPC-EX North and South being commissioned (more later). FVTX/VTX installed and being commissioned. 12/10/2014Douglas Fields 2

Time Meeting 1/20/2015 FVTX Status 12/10/2014Douglas Fields 3 Detector fully installed, cabled, insulated and closed up. Cooling system functioning at 10 o C. Dry Nitrogen flowing. Have addressed condensation issues. Groups are now bringing detector back to operational.

Time Meeting 1/20/2015 All fibers have sync, but NW5 because of a broken transceiver (top figure). Only 1 / 768 columns does not latch (top figure). No bias problems at this moment. Overall 85% hit efficiency according to the last calibration (bottom figure). Probably related to higher temperature (10 o C vs. normal 0 o C). Will reduce chiller temps tomorrow morning. FVTX Status

Time Meeting 1/20/2015 VTX Status 12/10/2014Douglas Fields 5 Detector fully installed, cabled, insulated and closed up. Cooling system functioning at 10 o C. Dry Nitrogen flowing. Have addressed condensation issues. Groups are now bringing detector back to operational.

Time Meeting 1/20/2015 Chip Map of WEST (Commissioning in Run /1/16) Pulse Test (sent pulse to col10 and 20) 6 Col#0 is always hot for two chips. Cannot mask. No change from a test at Physics Lab except for 1 chip (B1-L0 chip#2). Good chip -> 50% Dead VTX Pixel Status

Time Meeting 1/20/2015 Chip Map of EAST (Commissioning in Run /1/16) Pulse Test (sent pulse to col10 and 20) 7 Good chip -> 50% Dead No change from a test at Physics Lab except for 2 chips (B0-L9 chip#7 and B1-L17 chip#14). VTX Pixel Status

Time Meeting 1/20/ VTX Stripixel Status 1) - Inspected cables connections, LV, HV, optical cables. Issued were found and fixed 2) Low Voltage (LV) turned ON: all (40) ladders responded properly to low voltage (all working). 3) Bias voltage turned ON (10 volts, to check the connections): all (40) ladders responded properly with nominal currents.

Time Meeting 1/20/2015 MPC-EX Status 12/10/2014Douglas Fields 9 LV Distribution Boards Both North and South MPC-EX detectors installed and cabled. Read real signals from silicon sensors at bias through stand-alone readout. Working to incorporate into PHENIX DAQ. Have successfully passed data from a FEM we had set up in the counting house. Have successfully cycled data from an FEM in the hall making a number of raw data files with several thousand events in each. The data files were checked with ddump by hand and by a macro that double-checked the parity words. All looked fine. Working on multi-event buffering. Important to control beam loss

Time Meeting 1/20/2015 MPC-EX All hardware tested – all good Standalone readout with ethernet – Working on PHENIX DAQ integration

Time Meeting 1/20/2015 Spin Tasks PHENIX Spin coordinator – Itaru Nakagawa 12/10/2014Douglas Fields 11 TaskRun 11Run12Run13Run15 Local polCiprian, Sanghwa Josh/Sanghwa/ Cip Minjung Kim (SNU) Junsang (SNU) Minjung* Spin monitor/Oncal/CDEV Sookhyun, Andrew, Paul, Kieran Hide (Tokyo), John Koster Mike Beaumier (UCR) SeYoung, Mike*,Xiaodong Fast production (muons + electrons) Martin (UIUC), Yoshimitsu (RIKEN) Mike Beaumier (Muon) Darshana Perera(NMSU), Nils Feege(SBU) Nils Feege, Stacy Karthas(SBU), Darshana? EMCal Calibration (contact:Jeff Mitchell) Andrew (SUNY) Ciprian (SUNY)Jeff Relative Luminosity Andrew (SUNY), Kieran (RBRC) Hari (GSU), Inseok(SNU) Haiwan, Kieran* Vernier ScansDave Kawall, Paul Kline, Oleg, Kensuke Mike Beaumier (UCR) Sadeera (Umass) Katherine DeBlasio, Gregory Otino (UNM) ERTKensukeKensuke, Chin- Hao Chen Chin-Hao Chen, Inseok, Kieran Inseok, Sadeera, Minjung, Yorito, Zhongling (SBU)

Time Meeting 1/20/2015 Shift Status Currently we are pretty well covered beginning with watch shifts on Jan. 13 through end of March. Have a few vacancies left in the shift schedule through end of March. Have commitments for period coordinators through mid-May. Are filling Subsystem Experts shifts. 12/10/2014Douglas Fields 12

Time Meeting 1/20/2015 Period Coordinators 12/10/2014Douglas Fields 13 DatesNameComments 01/13/2015 – 01/20/2015John HaggertySheeting 01/20/2015 – 02/03/2015Sarah CampbellBeginning of run, MPC-EX 02/03/2015 – 02/17/2015Darren McGlinchey 02/17/2015 – 03/03/2015Klaus DehmeltRC on travel 2/26 – 3/3 03/03/2015 – 03/17/2015Norbert Novitzky 03/17/2015 – 03/31/2015Jin Huang 03/31/2015 – 04/14/2015Eric Mannel 04/14/2015 – 04/28/2015Nicole Apadula (tent)Change to p + Au 04/28/2015 – 05/12/2015Hubert van HeckeRC on travel end of April 05/12/2015 – 05/26/ /26/2015 – 06/09/2015Change to p + Al 06/09/2015 – 06/23/2015

Time Meeting 1/20/2015 Summary We are quickly coming to a ready state. Still plan to be ready to take physics data Feb /10/2014Douglas Fields 14