Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.

Slides:



Advertisements
Similar presentations
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Advertisements

Polarized 3 He Target for 12 GeV Experiments J. P. Chen, February 12, 2013, Hall A Meeting Introduction Target performance for 6 GeV experiments 12 GeV.
Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007.
Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
G2p/GEp Preparation Overview Jian-ping Chen g 2 p /G ep Readiness Review 5/6/2011.
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
G2P Target installation and Beyond. Schedule Pivot before.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Progress and Plan for Superconducting RF Cavity RF Group.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
SPIN 2004 Oct. 14, 2004 W. Kim, S.S. Stepanyan, S. Woo, M. Rasulbaev, S. Jin (Kyungpook National University) S. Korea Polarization Measurements of the.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Update on Cryotarget System Jian-ping Chen GMn Collaboration Meeting, Feb. 24, 2014  Overview  Maintenance/Modifications During Down  Installation Status.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
The polarized target for G E n Gordon D. Cates, Jr. University of Virginia Professor of Physics and Radiology G E n, - October 24, 2003.
NIKHEF B-field monitors Paul Balm November 11 th, 1999.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
PASI OsC meeting 12th July 2012
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
HMS Status Steven Lassiter Jan 20, 2017.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
PREX II Vacuum Box, Shielding and Septum Design Status
GlueX Electronics Review Jefferson Lab July 23-24, 2003
TEST PLANS for HL LHC IT STRING
Overview of Polarized 3He Target
LTU/Undulator Installation Status
Target Analysis for Transversity
East Hall under construction
Polarized 3He target installation
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents Installation/Switch-over Milestone, Manpower and Responsibilities

3He Target Overview

Design Progress Progress: (Estimated >90 person-weeks 3 months ago) Completed items: Layout for all four experiments New vertical Helmholtz coils and support New RF coils for vertical polarization New oven system Oven support in the target lab Target collimators Replacement support for horizontal Helmholtz coils New cells (with side pull-offs) Extended magnetic shielding on BigBite fringing field Conceptual design on laser optics lines Conceptual design on vertical Compass

Oven System

Oven being assembled in the target lab

Target Cell

Laser Optics

Remaining Items for Design Remaining design items: (total < 20 person-weeks) Main support Structure Supports for Target drive, Target Collimator, new RF coils, Ref. cell Target enclosure and windows Target ladder and pick-up coils Laser optics lines (including EPR, spectra-analyzer) and support Personnel access Safety interlock Compass mounts

Progress in the target lab Spin-flip test (mostly complete) RF sweep NMR on 3 He works EPR works New support for horizontal Helmholtz coils installed New oven and support arrived, being assembled Two new cells manufactured and to be tested Cell characterization (density and window) setup ready Optical fibers and combiners ordered 5-to-1 combiners delivered, tested and problems found

Spin-Flip Test

RF sweep NMR on 3 He

EPR

Planned tests in the target lab Install new oven, test Test new cells Characterizing new cells Test new components Test new optics RF sweep water calibration Combine polarization measurements with spin-flip Spin-flip signal to DAQ LabView communication with EPICS

Other Components Compass (Kentucky): Conceptual design complete complete design, manufacturing and test Vertical coils (order placed, delivery next month): setup in new target lab, align and field mapping then move to EEL target lab, integrate with horizontal coils Lasers: 9 in hand, 2 spare diodes; new vender: narrow lasers Cells: new contracts with Princeton/Mike Souza medium size (3”) pumping chamber, production started, two in hand, plan to produce 1 cell every two weeks W&M and UVa groups

Vertical Compass Conceptual Design

Safety and documents There are a number of safety aspects for the target: Laser safety: eye, skin, fire hazard, LSOP enclosure, alignment, eyewear, training High pressure glass cells: explosion, radiation, OSP/RWP enclosure, windows, loop around pivot area cell handling: face mask, eye and hearing protection Reference cell system: high pressure, hydrogen Hot Surface/fire hazard from heating Electrical from power supplies Magnetic field All documents will be updated

Manpower Designer: A. Gavalya, S. Esp (and help from others) Students: C. Dutta (KY), J. Katich (W&M), X. Zhan (MIT), Physicists: T. Averett (W&M, part-time), W. Korsch (KY, short-term visit), and J. P. Chen (JLab). Postdocs: from W&M, Duke Help from past students/postdocs. Off-site Cell production/testing at W&M, UVa. Compass design/testing at Kentucky.

Responsibilities Overall: J. P. Chen Design: A. Gavalya/ J. P. Chen Vertical coils, holding field, oven system, ladder, support, cell characterization, reference cell, NMR: J. Katich/T. Averett Spin-flip, EPR: C. Dutta/W. Korsch Optics: C. Dutta/J. P. Chen Software/Labview, communication with EPICS: X. Zhan/B. Moffit Compass: A. Kolarkar/W. Korsch Fringe field: P. Brindza Safety, documents: J. P. Chen

Installation, commissioning, switchover Coordinate with Ed Folts for installation: 4-6 week for the target Move to the hall, survey Move to pivot, survey, install components, Install optical line support, instrumentation, power cables Checkout magnets, measure field direction/survey Install ladder, cells, survey Install reference cell system, cooling jets Water calibration Laser safety inspection, switch to 3 He, laser alignment Pumping up, check out spectra-analyzer, EPR Commissioning: elastic 3 He asymmetry (T and L) Switchover: change cell, water calibration change optical line and check alignment, pump-up EPR, temperature test

Milestones for Polarized 3 He Spin-Flip test: done NMR/EPR system working: done, keep improvement New oven ready for cell testing/characterization: April 1 Vertical coils test: June 1 Cell production: 10 by July 1, 20 by Dec. 1 New target structure: Sept. 1 Compass: Sept. 1 Laser optics line: Oct. 1 NMR FM water (optional): Oct. 1 Complete system test: Nov. 1 Ready for installation: Jan. 1, 2008