Quality Representative Training Version 1.0 2014.

Slides:



Advertisements
Similar presentations
QUALITY SYSTEM AUDIT PRINCIPLES C. DAS, ADDITIONAL DIRECTOR
Advertisements

[Organisation’s Title] Environmental Management System
USG INFORMATION SECURITY PROGRAM AUDIT: ACHIEVING SUCCESSFUL AUDIT OUTCOMES Cara King Senior IT Auditor, OIAC.
ISO 9001:2000 Documentation Requirements
Auditing, Assurance and Governance in Local Government
Transition from Q1- 8th to Q1- 9th edition
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
EMS Auditing Definitions
The ISO 9002 Quality Assurance Management System
TEMPUS ME-TEMPUS-JPHES
Purpose of the Standards
ISO 9000:2000 Quality system standards adopted in 1987 by International Organization for Standardization; revised in 1994 and 2000 Technical specifications.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
ISO 9000 Certification ISO 9001 and ISO
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
4. Quality Management System (QMS)
TC176/IAF ISO 9001:2000 Auditing Practices Group.
Photocopies Occasionally need uncontrolled copies
4. Quality Management System (QMS)
Fundamentals of ISO.
Internal Auditing and Outsourcing
Effectively applying ISO9001:2000 clauses 5 and 8
University of Sunderland CIFM03Lecture 3 1 QMS / Standards CIFM03 Lecture 3.
1 AUDIT PROCESS Quality  Degree to which a set of inherent characteristics fulfils a need or expectation that is stated, generally.
Auditing an EMS for Conformance with EO 13423
Basics of OHSAS Occupational Health & Safety Management System
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
ISO 9001: 2000 Certified Audit Process What to do.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
INTRODUCTION TO AUDITING
Chapter 3 資訊安全管理系統. 4.1 General Requirements Develop, implement, maintain and continually improve a documented ISMS Process based on PDCA.
Version Advanced User Training. Instructions This training module contains additional key concepts that are an extension to the concepts in the.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
ASPEC Quality Representative Internal Auditor Training Version
AET0012PPT by Dr. Anwar El-Tawil Dr. Anwar El-Tawil Director ISO Programme for Developing Countries QUALITY MANAGEMENT SYSTEM ACCORDING TO.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Webinar FSSC audit report 7th september 2015
Revised AQTF Standards for Registered Training Organisations Strengthening our commitment to quality - COAG February August 2006.
The common structure and ISO 9001:2015 additions
Internal Auditing ISO 9001:2015
TOTAL QUALITY MANAGEMENT
TC176/IAF ISO 9001:2000 Auditing Practices Group.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
MODULE 7: CONDUCT OF GOVERNANCE AUDIT GOVERNANCE AUDITOR ACCREDITATION COURSE.
Visit us at E mail: Tele:
INTERNAL AUDITS A Management Tool
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
28 June 2016 | Proprietary and confidential information. © Mphasis 2013 Audit and its classifications Mar-2016 Internal Auditor Training.
What is ISO Certification? Information is a valuable asset that can make or break your business. When properly managed it allows you to operate.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Auditor Training Module 1 – Audit Concepts and Definitions
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Fundamentals of ISO.
UNIT V QUALITY SYSTEMS.
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Introduction to Internal Audits
How to conduct Effective Stage-1 Audit
TS Training Presented by: Internal Auditor Training.
Presentation transcript:

Quality Representative Training Version

Training Outline Training Purpose The purpose of this training is to provide the Quality Representatives in AE PROJECTS with the competencies required to perform the Quality Management functions required to maintain AE PROJECTS’s ISO9001:2008 Certification. Training Logistics The course is envisaged to take approximately 15 minutes There will be quiz questions used throughout to ensure that you understand the material You can contact Hannah Morgan for any The window can be closed at any time and progress saved A certificate will be ed to you upon completion. Training Contents 1.Introduction to the AE PROJECTS Quality Representative Role 2.Internal Auditing

Module 1: Introduction to the Quality Representative Role

ISO2001: 2008 Background ISO9001:2008 involves an international set of standards which ensures that organizations ensure that they meet the needs of customers and other stakeholders. It defines what an organisation does to ensure that its products or services satisfy the customer’s quality requirements and comply with any regulations applicable to those products or services. Third party certification bodies provide independent confirmation that organizations meet the requirements of ISO 9001: 2008 A number of major purchasers require their suppliers to hold ISO9001 certification. ISO9001: 2008 standard specifies that the organisation shall issue and maintain the following six documented procedures:  Control of Documents (4.2.3)  Control of Records (4.2.4)  Internal Audits (8.2.2)  Control of Nonconforming Product / Service (8.3)  Corrective Action (8.5.2)  Preventive Action (8.5.3)

Quality Management System AE PROJECTS has developed, documented, implemented and maintained a continually improving a QMS around the requirements of ISO9001: It uses a ‘process approach’ to describe and control AE PROJECTS workflow to ensure the AE PROJECTS product meets the client requirements. The QMS is comprised of the below documents. These are the documents used to explain and demonstrate how AE PROJECTS meets the requirements of ISO9001. Thus the AE PROJECTS Quality Manual mirrors these headings. These documents are located on the restricted Q drive and are controlled by the Quality Manager. The current versions of these documents are placed on the AE PROJECTS website under the Quality Management system page; accessed by the password protected member’s areas.

AE PROJECTS Quality Responsibilities To support the functioning of the QMS, AE PROJECTS has added a position of Quality Representative. The responsibilities are as follows: Quality RepQuality ManagerDirectors To conduct internal audits each month To participate in the PCA process at various office locations To disseminate quality information as required to the Workforce and or to the Project Manager Ensuring the processes needed for the quality management system are established, implemented and maintained Reporting to top management on the performance of quality management system and need for improvement Ensuring the promotion of awareness of customer requirements throughout the organisation Liaising with the Quality certification body to ensure that the quality certification is maintained Develop and circulate Quality management review meeting reports Maintain the website with current version controlled documents Update processes and manuals as required Develop and Maintain training modules Manage Internal Auditing process Endorse Quality Manual Oversee Quality Management Review meetings Communicating to the organisation the importance of meeting customer/ statutory/ regulatory requirements Establishing the quality policy and displaying it in each AE PROJECTS office Engaging in quality management system planning Ensuring that quality objectives are established for each site Ensuring availability of resources

Quality Representative Responsibilities To conduct internal audits on AE PROJECTS key activities: To aid in completing the monthly audit on AE PROJECTS key activities, the Quality Representative role has been created with the task of completing the Online Audit form according to the timescale indicated in the Strategic Planning Schedule The Quality Manager will ensure the Quality Representative is informed of WHEN they need to do this, based on the Strategic Planning Schedule To perform the function of internal auditing, it is required that persons complete an internal auditing competency based assessment, Thus the following module will address this Please Note that substantial detail is provided on internal auditing as background, than you will be required to perform as your duty as Quality manager To participate in the PCA process The PCA process is critical to the functioning of AE PROJECTS Quality Management System If the Quality Representative could enter a PCA: – Upon awareness of any quality improvement activity required – To meet our obligation of 1 per month – If an internal audit reveals a non-conformance To disseminate quality information as required to the Workforce and or to the Project Manager

Module 2: Internal Auditing

Auditing The international business management system auditing standard ISO defines an audit as: The above criteria is explained as follows: – Systematic – audits are usually a planned and scheduled activity. – Independent – Auditors must be independent of the area being audited. This means not related to, performing, supervising or having direct responsibility for the process and activities being audited thus avoiding any conflicts of interest and remaining free of influences which could effect objectivity – Documented – the audit process is a published written procedure – Evidence – evaluating it objectively means comparing the evidence with the audit criteria using facts without ‘subjective judgements or opinion – Audit criteria – the requirements of the audit according to the audit type. For example mandatory compliance if the criteria is government legislation – Fulfilled – conformation that the system conforms to the audit criteria “Systematic, independent and documented process for obtaining evidence and evaluating it objectively to determine the extent to which audit criteria are fulfilled”.

Audit Process Flow 1. Schedule Audits 3. Document audit reports 2. Conduct audits 4. Address inefficiencies 5. Use audit outcomes for continuous improvement The strategic planning schedule maps out the audit schedule based on a risk- management process Using the frequencies outlined in the strategic planning schedule, the audit process is conducted Audit reports are disseminated to the QUALITY Manager upon completion. Audit findings are tabled at the Management Review Meetings Audit non-conformances are entered into the PCA system for action Through the PCA process, any actions will be allocated to action openers. The action list will be reviewed at the monthly meeting ACTIVITY Person Responsible Quality Manager Quality Rep Quality Manager

1. Schedule of Audits The internal audit schedule is based on the Strategic Planning document. This document is created after a meeting with the General Manager where they determine and evaluate the quality priorities based on the current risk of the business. Risk Management is performed with aid of documents such as the PCA register, past management meeting reports, Non- conformances recorded Director Meeting discussions and observations of quality performance in each office location, etc. The internal audit schedule live document can be obtained on the Quality Management System page of the website with controlled access through the password protected Members Area. The current audit schedule contains two types of audits: 1. External Audits ◦This is done by CACS on a six monthly basis at AE PROJECTS office ◦This is required to maintain our ISO9001:2008 Certification ◦The auditors review our actions from previous audits to make sure we close them off by the required date ◦The auditors also audit our QMS against the ISO9001:2008 audit criteria to ensure our system meets the requirements ◦This will be facilitated by the Quality Manager 2. Internal Audits ◦Quality Manager: Annual ISO9001:2008 audit, 6 monthly full system audit ◦Quality Representative: Monthly online audit

1. Schedule of Audits Continued Every audit must have an objective(s), criteria and scope. These will be determined by the Quality Manager who will ensure this information is contained on the Audit Report Documents. Audit Objectives The audit objective is the specific purpose for conducting audits and is usually based on management priorities (as indicated in the strategic management schedule). For example to: – Maintain accreditation of certification to a Standard (external audit by CACS) – Satisfy a customer or contract requirement – Determine whether the business management system meets the overall objectives of the organisation – Verify whether a process is being performed in accordance with a written procedure and determine its effectiveness – Identify best practice regarding implementation and effectiveness of the quality management system so this can be benchmarked across the organisation Audit Criteria A set of policies, procedures, standards or elements. For example: – Management Systems Standards including ISO9001:2008 Quality Management – AE PROJECTS Quality Management System Documents Audit Scope The scope of the quality audit related to the locations, area or process or elements in the management system being audited. For example, auditing the entire organisation or limited to one department or one part of a complex process. The depth of the audit refers to the amount of detail that is to be reviewed.

2. Conducting an audit Planning The Quality Manager will ensure that the relevant audit team is aware of the upcoming audit details as indicated on the strategic planning schedule: – The audit criteria and scope – Location – Duration of the audit and resources required – Identification of audit team/ and auditee(s) – Identification of documentation required for the audit criteria Preparation The lead auditor shall then: – Book a meeting time and venue for the audit (invite attendees) – Bring any supporting material – Ensure access to the relevant audit template (see internal pages of website below)

3. Document Audit Report The formstack form is in the format of an audit report, thus one is not required to be completed It is important to fill out the summary section for management Upload the completed audit to this page upon completion 4. Address inefficiencies If any non-conformances have been identified – enter a PCA record for action The result from the audit will be tabled at the Management Review Meeting Minutes 5. Use audit outcomes for continuous improvement The PCA’s will be then followed up to ensure continuous Improvement Activities