BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas

Slides:



Advertisements
Similar presentations
SV Microwave Products Connectors Adapters Blind mate Connectors Cable Assemblies Attenuators Terminations Signal Processing Components.
Advertisements

HV Cable Suitable to sustain up to 15 kV Cable characteristics: 1.According CERN safety instruction IS 23 2.Single conductor- = 0.16 mm 3.Conductor resistance.
A/V Connectors & Cables. Chasis Mount Connector A connector that is built into a piece of equipment.
Connectors Connectors are a major cause of equipment failure. Pins are wired incorrectly, bare wires touch and short circuit or connector pins are accidently.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
PACS IIDR 01/02 Mar 2001 FPU Harness and Distribution Board1 D. Kampf KAYSER-THREDE.
Walls crates cables gas chambers electronics CERN adb.
INJECTORS BLM BI-TB on Proton Injector start-up. Summary of actions 2 BLM SystemComments LINAC2 8 movable detectors.
Embedded Programming and Robotics
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Communication channels and transmission media
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
GE1/1 Services and Strips PCB Andrey Marinov On behalf of CMS GEMs collaboration.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
High precision vacuum measurement system based on Bayard-Alpert ionization gauge System overview for LHC, system performance, first operational measurements.
BLM FOR THE INJECTORS PROJECT LINAC4 & PSB Linac4 Beam Coordination Committee - Meeting 33 (31/05/2012) Christos Zamantzas
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
Beam Loss Monitor Yoshinori Sato (KEK, IPNS) Target & Monitor Sub-Group.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Electronics for CEDAR Cristina Lazzeroni, Marian Krivda, Richard Staley, Xen Serghi, Karim Massri University of Birmingham, UK 3/5/
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
BLM FOR THE INJECTORS PROJECT LINAC4 & PSB Beam Instrumentation Review – 18/10/2011 Christos Zamantzas
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
SESAME TL2 and SR Diagnostics
An Introduction to Transmission Media
Markus Friedl (HEPHY Vienna)
Calorimeter Mu2e Development electronics Front-end Review
HF Test station at P5 A.Mestvirishvili.
Injectors BLM system: PS Ring installation at EYETS
Meeting on Services and Power Supplies
PMT cabling Gian Luca Raselli INFN Pavia
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
DT & RPC Grounding STATUS
Some proposals on HV circuits realization for segmented straw detector
Injectors BLM system: PS and PSB Ring installations at EYETS
LHC BLM system: system overview
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Overview of T1 detector T1 is composed by 2 arms
BLM planning 24/02/2014.
HCAL HV splice box.
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
LS1 status 24/03/2014.
Limited Streamer Tube Project Summary
Tunnel hardware installation
BLM planning 03/02/2014.
Presentation transcript:

BLM FOR THE INJECTORS PROJECT CABLING NON-CONFORMITIES LIU-PSB Working Group Meeting (15/08/2013) Christos Zamantzas

11.5 +/ PE CU AL-PETP-AL PETP High Mu FE PETP Brown polyolefinSI-CU 23x9x0.16 SI-CU 23x9x0.16 Diameter in [mm] Cable: Signal -(1000V)- Screen 1 –(500V)- Screen 2 (Triaxial) Connector male: (receptacles) -Signal -Isolation (1000V) -Screen 1 -Isolation (500V) -Screen 2 (Triaxial) Connector female: (cable) -Signal -Isolation (1000V) -Screen 1 -Isolation (500V) -Screen 2 (Triaxial) 1. Adapter: BNC or SMA Signal - Screen 1 (coaxial) 2. Adapter: BNC / SMA / N-type Signal - Screen 1 & Screen 2(coaxial) CKB50: Coaxial cable

Cabling Diagram  Screen of HV BNC is open on the IC side to assure there is no ground loop.  Internal screen to shield low frequency noise (GND only on electronics side, IC is floating).  External screen to shield high frequency noise. BNC SMA TRIAX Connector Types: Ionization Chamber enclosed in cable traytube 50 ÷ 200 m~ 5 m~ 1 m CKB 50 BNCSMA Acquisition Card (BLEDP) External Screen 2 Internal Screen 1 Signal HV Power Supply (~1500 V) HV BNC 15/08/2013

11.5 +/ PE CU AL-PETP-AL PETP High Mu FE PETP Brown polyolefinSI-CU 23x9x0.16 SI-CU 23x9x0.16 Diameter in [mm] Cable: Signal -(1000V)- Screen 1 –(500V)- Screen 2 (Triaxial) At random positions discovered shorts between the two shields. Not possible to be used with Triaxial functionality. CKB50: non-conformity Isolation between the two shields not optimal. Added additional steps for the connector assembly to avoid leaks. 15/08/2013

Cabling Non-Conformities  Internal and External screen are shorted in multiple and random places.  Non-conformity (most probable) due to thin insulator. BNC SMA TRIAX Connector Types: Ionization Chamber enclosed in cable traytube cable non-conformities 50 ÷ 200 m~ 5 m~ 1 m CKB 50 BNCSMA Acquisition Card (BLEDP) External Screen 2 Internal Screen 1 Signal HV Power Supply (~1500 V) HV BNC 15/08/2013

Alternative Cabling Configuration  Connect both shields together on both sides  Leave the ground on the detector side floating  Configuration will be very similar like in LHC system. BNC SMA TRIAX Connector Types: Ionization Chamber enclosed in cable traytube cable non-conformities 50 ÷ 200 m~ 5 m~ 1 m CKB 50 BNCSMA Acquisition Card (BLEDP) External Screen 2 Internal Screen 1 Signal HV Power Supply (~1500 V) HV BNC 15/08/2013

Meeting with manufacturer On the first meeting agreed:  Modification of the specifications  Two more PET-foils over the magnetic screen.  No problems mounting the connector.  The electrical properties will not change.  Manufacturer to run a trial until end of September  We will test the sample and release the cable until mid-October  If all ok, manufacture about 6km until end of November  Re-installation to begin mid-January.

Next steps Next week, meet with manufacturer on financial matters.  Costs of the new production  Handling of the stock already at CERN Decide if we continue with the installation or remove all and wait for the new production.  Currently the issue affects 32 detectors  During LS2, 80 additional will need to be installed.