TEMS Training Jakarta, 16 Desember 2006.

Slides:



Advertisements
Similar presentations
Using H.E.L.P. on a Network Report Solutions Inc. 435 West Broadway Centralia, IL
Advertisements

Lecture 10 Sharing Resources. Basics of File Sharing The core component of any server is its ability to share files. In fact, the Server service in all.
Little Used, but Powerful Features with GP Cathy Fregelette, CPA, PMP Practice Manager BroadPoint Technologies September 20, 2012.
Office Links - Sharing Data in Microsoft Office A Mixed Bag of Treasures Chester N. Barkan Registrar Long Island University, C.W.Post Campus.
PC Encryption installation progress/password screen Includes comments from: Encryption team Sarah Deane Tony Stieber Selected people who took part in the.
Computer Basics Hit List of Items to Talk About ● What and when to use left, right, middle, double and triple click? What and when to use left, right,
CS0004: Introduction to Programming Visual Studio 2010 and Controls.
1 Vodafone Text Centre Fast, flexible PC to mobile text messaging Date.
Tutorial 8: Developing an Excel Application
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Windows XP Basics OVERVIEW Next.
Homework 1 Hints. Homework Tips (General) Go through and do the ENTIRE homework in the same time period – You will use all of the material from chap 1.
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Accounts Receivable Presented by: Robert Myers Presented by: Robert Myers.
Getting Started with Layout Compiled by Ryan Johnson May 1, 2002  Open Orcad Capture under Engineering Software  Under FILE, choose NEW, PROJECT  The.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 11: Monitoring Server Performance.
Chapter 11 - Monitoring Server Performance1 Ch. 11 – Monitoring Server Performance MIS 431 – created Spring 2006.
Chapter 2 Querying a Database
RF OPTIMISATION IN GSM NETWORKS Regional Telecom Training Centre, Trivandrum :
■ DEMO#1: Manual Teaching Mode, Task Creation, Basic Autonomous Run ■ DEMO#2: Obstacle Avoidance Demo ■ DEMO # 3: Complete reproduction of manual drive.
SDReaderCE An Overview on Use and Functionality. Using SDReaderCE After loading the route to the handheld from SDReader6, select the route folder from.
ExitTOC Run & Route Directions 2003 Editing Run and Route Directions Edulog.nt v9.2 Use the buttons to navigate the training package First PagePreviousNextLast.
Troubleshooting methods. Module contents  Avaya Wireless tools  Avaya Wireless Client Manager  Avaya Wireless AP Manager  Hardware indicators  Non.
RF Drive Test (Testing) Engr. Mehran Mamonai. Introduction Every good RF design, after its implantation should be evaluated. There are few ways to do.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Unpack From Box and Inventory Technical Bulletin User’s Manual Assembly Procedure Direct or Strap Pole Mounting Kit Face to Southern Sky High Temperature.
Introduction to VBA. This is not Introduction to Excel We’re going to assume you have a basic level of familiarity with Excel If you don’t, or you need.
Power Point EDU 271 Microsoft PowerPoint is a powerful tool to create professional looking presentations and slide shows. PowerPoint allows you to construct.
Introduction to our On-Line Self Service Center at
Ircon ® ScanIR ® 3 Linescanner How to work with Snapshots? Confidential Rev. A 07/2013.
Hytera Patrol System Solution
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Using TEMS Investigation.
MICROSOFT WORD GETTING STARTED WITH WORD. CONTENTS 1.STARTING THE PROGRAMSTARTING THE PROGRAM 2.BASIC TEXT EDITINGBASIC TEXT EDITING 3.SAVING A DOCUMENTSAVING.
London April 2005 London April 2005 Creating Eyeblaster Ads The Rich Media Platform The Rich Media Platform Eyeblaster.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
Introduction With TimeCard users can tag SharePoint events with information that converts them into time sheets. This way they can report.
UIC ERTMS World Conference
‘Tirgul’ # 7 Enterprise Development Using Visual Basic 6.0 Autumn 2002 Tirgul #7.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
Janne Myllylä T GPRS optimisation and Network visualization.
Lucent Technologies Proprietary Use Pursuant to Company Instructions - All Rights Reserved GSM RF Planning and Engineering Aspects.
Microsoft ® Office Access ™ 2007 Training Datasheets I: Create a table by entering data ICT Staff Development presents:
1 © 2006 Nokia pullola_ ppt / Extending Base Station Active Radio Link Set for Improved Uplink Scheduling Esa-Pekka Pullola Supervisor:
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 11: Monitoring Server Performance.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
Chapter 10 Chapter 10: Managing the Distributed File System, Disk Quotas, and Software Installation.
Database Applications – Microsoft Access Lesson 4 Working with Queries 36 Slides in Presentation.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Company Confidential 1 © 2005 Nokia Thermal_Requirements_Guideline_v10.ppt / / OS Thermal Requirements and Uses Cases for SPR Guideline to SPR.
Verification & Validation. Batch processing In a batch processing system, documents such as sales orders are collected into batches of typically 50 documents.
INSERT BOOK COVER 1Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Exploring Getting Started with VBA for Microsoft Office 2010 by.
The desktop (overview) Working with desktop icons The desktop is the main screen area that you see after you turn on your computer and log on to Windows.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
2G Vs 3G Drive TEST with tems
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
How to Recover Deleted Photos from Android Cell Phone? Android is keeping on improving their products and make sure to provide the best software service.
Safety and health at work is everyone’s concern. It’s good for you. It’s good for business. Improvement of OiRA Presentation of the new features to the.
GLOBAL SYSTEM FOR MOBILE COMMUNICATION
TEMS Parameter. Module Objectives On completion of the module one should be clear about the parameters required during drive test what does it mean and.
Emdeon Office Batch Management Services This document provides detailed information on Batch Import Services and other Batch features.
Guide of Genex Assistant for LTE
Pilot Walktour Pack Operation Guide V3.4
Lab 2: Packet Capture & Traffic Analysis with Wireshark
Pilot Watcher Product Overview V5.3
Ping™ 6.
Drive Testing Basics 2013 March
Pilot Pioneer Operation Guide v9.6
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
GSM Radio Network Optimization. Absolute Radio Frequency Channel Number (ARFCN)  GSM 900 F U (n) = n MHz F D (n) = Fu(n) + 45 MHz Where: 1.
Presentation transcript:

TEMS Training Jakarta, 16 Desember 2006

Data Mentor Nama : Andu Hanindyo Posisi Terakhir : Drive Test dan IBS Engineer Spesialis : In Building Solution, Drive Test Pengalaman Kerja : - 2002-2006 : Drive test engineer untuk Indosat, Telkomsel - 2005-2006 : IBS Engineer untuk Telkomsel, site audit

INTRODUCTION what’s TEMS TEMS as DRIVE TEST TOOLS drive testing highlight mode of drive test scan TEMS to see how the network runs the use what to see what to measure cases guidelines

Introduction WHAT’S TEMS TEMS = Test Mobile System Product by ERICSSON Solution Tools for Wireless Network to Plan, optimized, and expand their systems. A Test tool use to read and control information sent over the air Interface between the base station and the mobile station in GSM /cellular system. It can also used for radio coverage measurement

Network Performance Management Introduction WHAT’S TEMS Product of TEMS Network Monitoring TEMS Transmitter TEMS Light TEMS Indoor TEMS Investigation TEMS Deskcat TEMS Drive Tester TEMS Pocket TEMS Automatic TEMS CellPlanner TEMS LinkPlanner Network Planning TEMS Automatic TEMS CellSight TEMS Visualization Real Time Diagnosis Network Performance Management

Introduction WHAT’S TEMS

Introduction WHAT’S TEMS TEMS TEMS INVESTIGATION Software Handset

Introduction WHAT’S TEMS TEMS Investigation version: TEMS Classic/98 : SH888; post process with 3rd-party-s/w TEMS 2 : R230; post process with 3rd-party-s/w TEMS 3 : R520; post process with 3rd-party-s/w TEMS 4 : T68; export from TEMS TEMS 5 : T610; export from TEMS TEMS 6 : various handset; data collection & route analysis TEMS 7 : various handset; data collection & route analysis

DRIVE TESTING HIGHLIGHTS As Drive Test Tools DRIVE TESTING HIGHLIGHTS Drive Test = Testing the network in particular area to give the real picture of the network’s performance on the field, with a certain tools. Drive Test Planning Michael pipikakis Evaluating and Improving The Quality of Service of Second Generation Cellular System September,2004 Implementation Optimization

As Drive Test Tools DRIVE TESTING HIGHLIGHTS Drive test TEMS

DRIVE TESTING HIGHLIGHTS As Drive Test Tools Laptop TEMS Handset DRIVE TESTING HIGHLIGHTS Drive Test Equipments Notes : -power supply needed, usually using inverter in the car from laptop, GPS and MS -GPS should use external antenna -MS can use external antenna or not use external antenna. (Use external antenna means measure RxLevel “Pedestrian / Street Level”) (Not use external antenna means measure RxLevel “ In car level) -> more realistic result If using scenario not external antenna, MS position should be carefully chosen and stable during drive test

Dedicated / Continuous / Long Call Mode As Drive Test Tools MODE OF DRIVE TEST Dedicated / Continuous / Long Call Mode Making continuous call along drive test activity. Before starting the route, call the drive test number, ex. 199 for Telkomsel, And only stop the call when the route (drive test) finish. To see the quality and coverage of the network

As Drive Test Tools MODE OF DRIVE TEST Idle Mode Along the drive test activity, the MS is “ON” but no call occur To see the coverage of the network

Sequential / Qos / Short Call Mode As Drive Test Tools MODE OF DRIVE TEST Sequential / Qos / Short Call Mode Creating the sequence of call along the drive test activity Before starting the route create call sequence, for example: Create call for 70 s and idle for 10 s. Along the drive test, play this sequence until the route is finished To see the real network performance run, when people call

As Drive Test Tools SCAN one of TEMS feature scan all or selected frequencies on the selected spot or route to find the clearest frequency Application of frequency plan to find the best frequency to be use in the site to identify interference adjacent channel and co channel Clean Frequency

To See How the Network Runs THE USE In PLANNING works: Drive Test Before Installation Perform drive test before “our” network implemented. This data later will be compared with drive test after implementation, to justify. Drive Test Before SWAP Before swap (change operator network), drive testing needed to compare the current network with the network after swap. To justify the new network is better than before. Drive Test Benchmarking Drive test the whole area for the whole active networks, before ‘our’ network implemented. So when ‘our’ network implemented, can be competed well. etc

To See How the Network Runs THE USE In Implementation Works: Drive Test New Site/ Initial Drive Test Initiate the drive test after a site on-air. Make sure that site perform well after on-air. Test Call New Site Conducting tests call at a new “On-Air” site, to justify the performance of a site just after “On-Air”. Drive Test Upgrade/Expand TRX After implement new TRX or expand TRX, a drive test performed to justify that site working well with the new TRX. Drive Test SFH/Hopping implementation After implement SFH/hopping in the network, a drive test performed to justify that this hopping solution working well with the whole network. etc

To See How the Network Runs THE USE In Optimization works: Drive Test Handover/ Add & Delete neighbors Drive test conducted after there’s changing in neighbours database. Make sure the “add” really added and the “delete” really deleted. Drive Test before & after Downtilt Downtilt conducting, to get better coverage from each antenna. Drive test performed to make sure the better coverage from each angle changed. Drive Test Network Audit Performing drive test activity to maintain the whole network. Could be an annual work. Drive Test Benchmark performing drive test to get justification about ‘our’ network. Can compete or not. With comparing the whole network including 'us’ in drive test. Drive Test troubleshooting Drive test for special troubleshooting case. Such as, a site that cannot handover from sites surround it, a site that cannot transmit good signal and cannot achieve its coverage. etc,

How TEMS works? Several measurement is only available and recorded in idle mode (C1,C2 etc) Several measurement is only available and recorded in dedicated mode (RxQual, SQI, FER etc) This is happen because of GSM system network works, not because setting in TEMS There are several option/feature can be activated by user (force handover, lock handover etc) which change TEMS measurement behavior IMPORTANT NOTICE : In GSM network there are a lot of parameters which change the network behavior, it is make the network very flexible. Due to this reason, TEMS has ability to monitor network with parameters on (FULL mode) and with parameters off (SUB mode) for such as RxLev and RxQual.

When using FULL measurement result? Whenever we want to see BTS parameters settings works at live network DTX off When using SUB measurement result ? Whenever we want to see BTS works without parameters DTX on How TEMS measure FULL or SUB measurement? TEMS record both SUB and FULL measurement at the same time and at the same log files, it is just need to set what we wan to see in replay mode. FULL SUB LOG FILE

To See How the Network Runs WHAT TO SEE WHAT TO MEASURE Parameters to See 1. RxLevel Level of Received signal strength. In dBm or Steps. If the value in form of step substract 110 to the value to get dBm value. RxLevel is received power level at MS (maximum RxLevel measured by MS is (±)– 40 dBm

2. RxQual Received signal quality level, measured base on BER (bit error rate). The value is between 0-7, the lower the better. Better

3. SQI The parameter used by TEMS to measure Speech Quality. SQI has been designed to cover all factors that RxQual lack to measure. SQI computation considers the factors: the bit error rate (BER) the frame erasure rate (FER) data on handover events statistics on the distribution of these parameters Better

To See How the Network Runs WHAT TO SEE WHAT TO MEASURE 4. Others FER Frame erasure rate BCCH-BSIC Hopping SFH C/I Interference TA Time Advance C1 Path loss criterion parameter C2 Cell reselection criterion parameter in hierarchical cell structure

4. Others FER  Frame erasure rate; See on “Radio Parameter” windows ARFCN BCCH-BSIC  Absolute Radio Frequency Channel Number of Broadcast Control Channel.  Base Station Identity Code  Important data of a site Hopping  Indicating if SFH implemented. See on “Current Channel” windows, on ‘hopping channel, hopping frequencies, MAIO, HSN’ C/I  The carrier-over-interference ratio is the ratio between the signal strength of the current serving cell and the signal strength of undesired (interfering) signal components. The C/I measurement function built into TEMS Investigation enables the identification of frequencies that are exposed to particularly high levels of interference, something which comes in useful in the verification and optimization of frequency plans. TA  Timing Advance. Valid only in dedicated mode. ; To measure the distance of MS from serving cell. Valid only in dedicated mode. See on “Radio Parameter” windows. C1  criteria used for cell selection and cell reselection C2  criteria used for cell reselection

To See How the Network Runs CASES The examples of How Drive Test can see a Network runs.

To See How the Network Runs CASES BTS Down Get in to the site (whether it’s new or existing), then see on TEMS display, At parameters BCCH, BSIC. If the intended site’s BCCH doesn’t appear, the site is Down If we don’t have the site data. We can go the exact position of the site, near/under the antenna. Then see if on the serving cell, the Rxlev is good ( above -60 dBm)

To See How the Network Runs CASES 2. Handover We need to check the handover between sector1 of Site A to sector3 of Site B. We start at the Site A. Check the parameters on TEMS. Make sure the serving cell now Is from the sector1 of site A. See the neighbour, if the sector3 of site B appear. Start the drive test, with dedicated mode, to site B sector3 (specified the route first). The handover should be occur along this drive test. If it’s not, note this as a problem. See any possibility of the problem, such as: the neighbour not appear, possibility haven’t been created there’s other site between there’s obstacle Then do the opposite, start from sector3 Site B to sector1 Site A.

To See How the Network Runs CASES 3. Swap Feeder There’s a possibility that we have bad installation, for example swap feeder. Swap feeder occur when the installation switch by mistake, for example the feeder to sector1 Became to sector 2, from BTS. We can see this from drive test. For example, we have a site with 2 sectors, with a road in front it, to be covered. We should have the data of this site, such as the BCCH of each sectors. We start the drive test from sector 1 to sector 2. While we’re on sector1 coverage, see if the BCCH of serving cell is the correct one, according to the data we have. And do the opposite from sector 2 coverage to sector1 sect2 sect1

To See How the Network Runs CASES 4. Overshoot When we get the signal from the site that not close to the current area drive test. Usually we get bad RxQual and long/bigger TA. We can suspect this as a overshoot case. This case happen when a site/cell is serving far away from its area.

Guidelines Drive Test Types Drive Test Continuous Route Drive Test is walk/ drive along the route non stop Hot Spots Measurement Drive Test only at certain spot (usually critical point), TEMS standing still, no movement for 1-5 minutes but still recording. Usually for scanning frequency or to investigate more detailed network behaviour

Guidelines Drive Test Guideline Preparation Don’t go to the field without a good preparation. Prepare the tools completeness, maps, cars, scenarios, sites data, knowing area we are heading to. Check Tools Beside checking the tools completeness. Also check each tools if it’s working well, such as the GPS, inverter, handset, including SIM card. Some Rules - Avoid to have the same route twice, or go on the same road twice. - Beware of certain area, such as restricted area, one way street, traffic jam streets. - Create simple/effective way of scenarios, where to start until finishing the route. - Good cooperation with driver. - Make sure the roads on the route, can represent the whole network as samples. Pay Attention Even if we’re only collecting data, we must focus on our activity. Avoid the things that can make us re-drive test , such as, data cable unplugged from its MS, forget to turn-off the GPRS mode when we don’t need GPRS to measure, run out GPS batteries, forget to record, forget the purpose of the drive test, assure the data collected is right, pay attention of car speed, create notes for special events, etc. Reporting and Analysis TEMS can divided as two, data collection and analysis. After drive test on the field, we must provide data to be analyze and reported. Make sure we can create a good report and analyze well, by performing all of the points above.

Guidelines Reporting Guidelines Drive test report basically can be divided as two: Plot and Statistic. BCCH: 59 logfile floor RxLevel Average % RxQual Data   = 0 BRI1 1 -65.12706271 93% BRI2 2 -58.26292629 98% BRI3 3 -57.53480663 87% Statistics Plot

Before we can create the report, make sure we have the right standard for each value reported. Such as how many ranges the treshold of RxLevel, and RxQual. The color ranges of SQI and FER, etc. Export the right data for Plotting. To create Plot report, for example we need the logfile to be mapinfo files. Make sure we have TEMS 4 above, that can directly export the logfile into mapinfo file. Or, if we have TEMS 3 below, make sure we have third-party software that can create it, such as GIMS.

format can open , and manage with Microsoft Excel. For statistic report, usually we only need the excel file and some of mapinfo data. Each version of TEMS investigation can export the logfile into text file, *.fmt. This format can open , and manage with Microsoft Excel. 5. Following the standard report of the customers. Ms id TIME FRAME POSITION MESSAGE TYPE HEXADECIMAL STRING LAT LON MS1 15:41.7 2609056 S 0000.0240 E 00000.0314 PAGING REQUEST TYPE 1 0F 0F 25 06 21 00 05 F4 30 A2 DB CC 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 15:43.1 2609362 E 00000.0318 0F 0F 15 06 21 00 01 F0 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 15:44.5 2609668 E 00000.0319 PAGING REQUEST TYPE 3 0F 0F 4D 06 24 00 30 C3 AC 76 30 C2 33 8E 30 C3 0F AF 30 C3 16 3E 83 2B 2B 15:45.9 2609975 E 00000.0322 0F 0F 41 06 21 00 05 F4 30 C3 9B 1A 17 05 F4 30 C3 AD 45 2B 2B 2B 2B 2B 2B 15:46.1 2610013 S 0000.0239 IDLE MODE REPORT 0E CF E2 00 0C D0 56 10 4D DA 0F CB D7 10 09 DA 0E 88 00 0F 46 80 15:47.3 2610281 E 00000.0327 0F 0F 25 06 21 00 05 F4 30 C2 D0 1B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B 2B

Layer 3 Messages To Monitor the event and signaling sent and received by Phone List Messages of event and signaling Often use in analysis, after Drive Test completed -Replay the logfile, click a point on the route marker on map window, then see on layer 3 messages windows, detailed information on the associated messages appears in this window -Can double-click each list message from that window to open a new window displaying the full contents of the message.

Scanning Function inside TEMS TEMS Investigation supports scanning of radio frequency carriers (channels), using either a ordinary TEMS mobile station or a dedicated frequency scanner mobile, the TEMS Scanner. Scanning is handled from the Frequency Scanner window, and here the output of the scan is displayed, too

Scanning Function inside TEMS BCCH BSIC Average Rx Level (dBm) 51 35 -104 52 - -115 53 26 -110 54 -114 55 -105 56 57 -111 58 59 60 61 62 -113 63 64 65 66 15 67 68 69 70

Scanning Function inside TEMS Procedure: In the Frequency Scanner window, choose the unit to use as scanner in the combo box. Click the Measurement Settings button. The channel selection is handled from the Scanned channels tab: Selecting Channels Checking "Decode BSIC" causes the Base Station Identity Code to be decoded. It will be shown in the table to the right in the Frequency Scanner window

Scanning Function inside TEMS Performing Scan Presenting Scan To start scanning, click the Start Scanning button. While the scanning is going on, the status bar shows the padlock symbol , indicating that the scanner is busy. To stop scanning, click the Stop Scanning button. Bar Chart Line Chart Table

Scanning Function inside TEMS BCCH BSIC Average Rx Level (dBm) 51 35 -104 52 - -115 53 26 -110 54 -114 55 -105 56 57 -111 58 59 60 61 62 -113 63 64 65 66 15 67 68 69 70 Scanning Function inside TEMS After Process / Report Plot Spreedsheet Directly capture Export to Mapinfo Export to text (.fmt), open and process with Excel spreedsheet

HINTS for MS: Life time MS measurement equipment maximum 1 year, if more than 1 year need to be re-calibrate Calibration MS’s cost almost the same price buy a new one Ericsson only support 2 version below for re-calibrate (eq : latest version is TEMS 7.0, means only can re-calibrate handset at version 5) If MS not calibrated or buy a new one, it will impact into the measurement (such as RxLevel and RxQual) will reduced and not valid => KPI will not achived TEMS always have bugs (even latest version) both coming from software or from type MS itself, need knowledge to anticipated it (such as wrong RxLevel recorded)

HINTS for PC/Laptop: PC which use for TEMS should turn off any usage of COM, IR, bluetooth, Wi-Fi, any accessories attached at PC should be turn off, set PC into “Maximum Performance” at Control Panel-System Slow PC, low memory, low HD capacity will make MS disconnected suddenly when TEMS use for a long time, same things happened if the battery of PC/laptop is too hot Turn off power saving feature in the laptop/PC Turn off screen saver It would be better drive test laptop is only for do drive test not for daily routine

HINTS for Drive Test: Make sure all connections cable at TEMS system is tight, as well external antenna For indoor drive test, MS position is very crucial because some MS location can increase body loss or other losses (such as MS put behind laptop or put MS near body) Avoid doing drive test at busy hour especially will increase loss (eq : a lot of people in the mall will increase body loss, a lot of car in the basement, traffic jam) For 3G drive test, more user using 3G will reduce quality, do drive test at low traffic is essential Drive test indoor need constant speed walk test (idle mode slower than dedicated mode) Drive test outdoor should be constant and not to fast ( max 40 km/h inner city and max 60 km/h outer city) Drive test recorded more than once at the same route (if possible) because it always given result slightly different. Take the best one as a report Result Drive Test route for outdoor drive test should be ignored when drive test route inside tunnel, on top of fly over road, below fly over road, bridge. Pay attention that GPS can’t work well if no LOS into the sky

Reference Ericsson.com/tems Michael Pipikakis, Evaluating and Improving The Quality of Service of Second Generation Cellular System, September,2004 TEMS Investigation 4.0 Manual TEMS Investigation 2.03 Manual TEMS Investigation 7.0 Product Description

END