Proposal to upgrade infrastructure and radars and stream data through UNIDATA back to NCAR. R. T Bruintjes, M. Moncrieff, A Laing and others Africa meeting.

Slides:



Advertisements
Similar presentations
T.R. THE MINISTRY OF ENVIRONMENT AND FORESTRY
Advertisements

1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Building Coordinators Network Welcome. Building Coordinators Network Meeting Agenda April 13, 2006 Tornado Anniversary – Rod Lehnertz Welcome – Kelli.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
BS9990 : 2015 Updates and/or Changes
Current programs in Africa update Scientific Challenge: Aerosol – Cloud Interactions: Implications for precipitation and weather modification R. T Bruintjes.
1 Fox Valley Fire & Safety’s Wireless Radio Network Our customers experience reduced monitoring costs; normally 25% or more. Eliminates expensive phone.
Geothermal Energy 2000 Geothermal Education Office.
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
 Wireless, Web-Based Monitoring System  Alarm/Event Notifications by Text Message and or  VPN Connection for Fast Response to Alarms and Events.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
© SAIC. All rights reserved. NATIONAL SECURITY ENERGY & ENVIRONMENT HEALTH CYBERSECURITY The Potential High Cost of Simple Systems Engineering Errors Jim.
Fostering Infrastructure Development in Africa AFRICAN DEVELOPMENT BANK GROUP Bocar Cisse Senior Financial Analyst, African Development Bank NEPAD-INFRASTRUCTURE.
Assessments of Impacts and Adaptations to Climate Change in Multiple Regions and Sectors (AIACC) Robert Watson ICSU Forum on Science and Technology for.
Professional Development Plan Externship Contact Hours Tracking.
Implementing HAZUS-MH in Pre-Disaster Mitigation
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Server Virtualization: Navy Network Operations Centers
Careers, Roles, and Responsibilities. Duties and Responsibilities The role of CE started in early 1970s. The need for medical technology management arose.
By David Chavez Wireless Laptops in Classrooms. Going Wireless! If you've been in an airport, coffee shop, library or hotel recently, chances are you've.
Google PowerMeter. Overview Google PowerMeter is a new application from Google that allows users to observe the power usage in their environment shown.
UNDP CIRDA Country Program Managers Workshop August 2015 Addis Ababa, Ethiopia Reports from Strengthening National Climate Information/ Early Warning.
1 © 2011 ARCADIS 14 September 2015 Fresh Water Supply Alternatives and Technologies Fresh Water Supply Alternatives and Technologies Community Advisory.
Natick Public Schools Technology Presentation February 6, 2006 Dennis Roche, CISA Director of Technology.
St Louis Flying Club I 2008 Annual Meeting 2008 Annual Meeting.
United Nations Specialised Agencies. UNICEF United Nations International Children’s Emergency Fund Emergency aid (e.g. wars, famines, natural disasters.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Small Wind Systems in Village Power Applications Southwest Windpower, Inc. “Renewable energy made simple” Andrew Kruse.
SCSC 311 Information Systems: hardware and software.
PERSONAL INTERACTIVE COMPUTER NETWORK TECHNOLOGY BASED SUPPORT Christopher E. Lang Computer Electronic Networking Dept. of Technology Eastern Kentucky.
A Global Early Warning System for Wildland Fire Bill de Groot, Canadian Forest Service Johann Goldammer, Global Fire Monitoring Centre, University of Freiburg.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Status of the Global Framework for Climate Services Filipe D. F. Lúcio
For the Sixth Work Plan July 2010 Bahir Dar.
Welcome to Hosted VoIP Eric Thomas Founder & CEO, FreedomVOICE Systems. Creators of FreedomIQ Hosted VoIP PBX. Over twelve years experience as a leading.
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Africa Programs. Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
Through the Eyes of the Surveyor.  There are gaps!  Emergency Preparedness is now a focus!
Africa Initiative: An Update UMC Meeting 19 December, 2006.
Implementing EHR in Home Health Care Component 11/Unit 9d An example on the Implementation of a Point of Care System.
Budgeting Technology. Start with a Plan Learners Learning Environments Professional Competency System Capacity Community Connections Technology Capacity.
Digital Doorway to Rural Connectivity Network. Free / subsidised exposure to ICT ICTs as information tools Actively participate in information society.
Mr.Sabu Best, Meteorologist / Software Developer, Barbados Meteorological Services RA-IV WIGOS Implementation Workshop (English),
Chapter 5 How are software packages developed?. What are the main steps in software project development? Writing Specifications - Analysis Phase Developing.
Working with HIT Systems
CYBERCAFÉS AS A TOOL FOR INCLUSION Presentation by Mr Christophe OULÉ, trainer in accessible IT tools U. N. – A. B. P. A. M. National Union of Burkinabé.
RA-IV WIGOS Implementation Workshop Curacao December 1- 3, 2015 Commonwealth of Dominica FITZROY PASCAL SENIOR METEOROLOGICAL OFFICER
STRENGTHENING OF CLIMATE CHANGE EARLY WARNING SYSTEMS STATUS REPORT.
CTIS Committee Meeting March 23 rd 2016 Chairwoman Jan Hallums-Quillman Councilwoman Bettye Gavin Councilman Pat Mudron.
Servelite - Complete IT Solutions. Servelite IT solutions specialize in providing Home solutions and Business solutions. We focus upon delivering quality.
Grey Owl Municipal Water feasibility study
Chapter 8. Electrical Systems
Stamatia Bibi1, Dimitris Katsaros2, Panayiotis Bozanis2
Background B513 built in early 1970’s for mainframe era.
Data Management Solutions for a Modernized HIS
Phase 4: Compelling Case for Change
West Africa Regional Work Plan Example
CREWS West Africa Regional Work Plan
Chapter 8. Electrical Systems
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Introduction to Space ODA programme ( name tba) –
9 April 2018 Phil Brown, Met Office, UK
Africa Initiative Dave Burridge Visit.
Customer Overview Pack – July 2018
Customer Overview Pack – July 2018
Modular Edge-connected data centers
Presentation transcript:

Proposal to upgrade infrastructure and radars and stream data through UNIDATA back to NCAR. R. T Bruintjes, M. Moncrieff, A Laing and others Africa meeting July 2006

Africa Programs

Burkina Faso infrastructure Radar installation on top of control tower and King Air B-200 and hangar facilities at the airport in Ouagadougou

Weather radar and project locations Radar locations Burkina Faso and Mali radar locations. Local weather services and universities

Recent Work Unstable and unreliable internet and local area network at the Programme SAAGA offices in Ouagadougou. The network and internet connections went down several times during the day and once for a period of 24 hours. The problems were associated with wiring problems, router and firewall problems and not necessarily with the internet connection as such. The network and internet connections in Bobo Dialloso were found to be highly reliable and working fine. The problems in Ouagadougou could also be associated with frequent power outages at the Programme SAAGA office during my one-week stay. Unstable power supply and frequent power outages at the Programme SAAGA offices in Ouagadougou. Although a standby generator is available for power supply when normal electrical power outages occur it always took 30 seconds to a minute to change from normal to standby power. The UPS units that supply power to the radar and TITAN/CIDD computers during this transition are small and on days when several of these power outages occurred the UPS batteries were drained and were not able to continue to provide power to the computers and equipment. This resulted in systems losing power and rebooting after power was reinstated. This also resulted in loss of data.

Recent Work (cont.) Incomplete installation of Bobo Dialloso radar. Unfortunately, the EEC radar engineer conducting the installation of the new radar in Bobo Dialloso got sick and had to return to the U.S. before the installation of the radar was complete. We were thus not able to feed data from the new radar to the TITAN/CIDD computer in Bobo Dialloso and to Ouagadougou. We should be able to test this remotely from the U.S. when the installation is complete. Problems with the radar in Ouagadougou. The radar in Ouagadougou is not well calibrated and maintained. The reflectivity levels on the EDGE and therefore on TITAN/CIDD are underestimating reflectivity levels by somewhere between 10 to 20dBz according to our observations. In addition, no Doppler velocity data is received. A full calibration and evaluation of the radar is needed. It is essential that the radars are well maintained and calibrated in the future if they will be used for guiding operations and in the evaluation of the Programme cloud seeding experiments. The same applies for the new radar in Bobo Dialloso. Accurate time synchronization between the radars and all associated computers are also essential.

Proposed changes Re-design and upgrade network and internet infrastructure at Programme SAAGA offices in Ouagadougou. We would suggest obtaining the services of a qualified expert to assess and evaluate the current and future network and internet requirements of the Programme SAAGA offices in Ouagadougou and to re-design the network. I would suggest that the buildings are also re-wired because many of the current network connectors and some of the equipment are unreliable. Upgrade UPS units and electrical power infrastructure at the Programme SAAGA offices in Ouagadougou. In the short-term it is important to upgrade the UPS power units to able to provide sufficient power to the computers during frequent power failures. In the long-term we would suggest that the infrastructure be upgraded to provide a more reliable and stable electrical power environment for the Programme SAAGA offices in Ouagadougou. Maintenance and calibration of radars and computer equipment. It is essential that the radars are well calibrated and maintained to support the operations of Programme SAAGA. The current Ouagadougou radar is not well calibrated and seems to have problems with the Doppler velocities. It is recommended that a plan is developed for the maintenance and calibration of the radars and computers. This is extremely important for the operations of Programme SAAGA.

Africa Initiative Proposal Activities Finalize implementation of radars and software (Current funding) Provide expert in networking to evaluate and help design reliable network (New funding, travel and support, 1 month) Network Mali and Burkina Faso radars and potentially MIT Niger radar (new funding, software engineer, 1month) Stream data to UNIDATA (new funding, 1 month per year software engineer, UNIDATA)

Proposal Activities (cont.) Burkina Faso has recently purchased two EEC C-band radars. As part of a sub-contract with EEC, NCAR is already working with Burkina Faso to provide upgraded software for one of the radars. Propose to upgrade the two C-band weather radars by providing a new receiver with Doppler capability including analysis software (1 month radar engineer, 1 month software engineer, hardware (~50k). Education and training (3 people from Burkina Faso and Mali will visit NCAR for training, current funding; GLOBE, COMET, UCAR E&O, START, ASMET, etc?) Workshop in Fall or early winter in West Africa (Sahel other west African countries using existing networks).

Summary Problem Water resource management Air Quality and health impacts Flash and local flooding and human impacts Seasonal (agriculture) Challenges Infrastructure building Low-tech approach Education Opportunities Africa Initiative UCAR capabilities Water resources, Severe weather, agriculture, air quality, health impacts.