2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.

Slides:



Advertisements
Similar presentations
Use of COTS Drop-in Replacement Designs to Solve Obsolescence of Electronic Components in Military Systems Willow Ridge Loop Orlando, FL
Advertisements

Electrical and thermal testing at Glasgow and Liverpool.
ATLAS Module building at Glasgow
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
The EX100 & EX1000 Oil in Water Monitors. The EX100/1000 Oil In Water Monitor Features 1.Continuous Flow and Accurate Measurement. 2.Measurement range.
ECE Department: University of Massachusetts, Amherst Lab 1: Introduction to NIOS II Hardware Development.
Training.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
GeneXpert Installation and Xpert MTB/RIF Set-up
VC707 Power Bus Reprogramming
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
WHAT IS A COMPUTER? BY JACK SUMMERS. WHAT IS A COMPUTER? A computer basically a set of different components that when put together in the correct way.
Computer Hardware The Basics. Overview Why is this important? To be able to recognize each of the main parts of a computer As a professional in digital.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
A+ Guide to Managing and Maintaining your PC, 6e Chapter 1 Introducing Hardware.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
B.A. (Mahayana Studies) Introduction to Computer Science November March The Motherboard A look at the brains of the computer, the.
WIDAR Prototype Testing User Interface Software Kevin Ryan NRAO-DRAO Face-to-Face Meeting April 3, 2006.
Translate the following message:
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
The Guts. CPU CPU Socket The CPU is generally a 2 inch ceramic square with a silicon chip located inside. The chip usually about the size of a thumbnail.
Stave Module Status Tony Affolder The University of Liverpool On behalf of cast of thousands… ATLAS Upgrade Week November 10,
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
Computer Hardware Maintenance & Repairs Computer Hardware Maintenance & Repairs Suleiman Mohammed (mncs,mcpn) Instructor Institute of Computing & ICT,
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
CIMON TOUCH KDT SYSTEMS Introduction  Excellent Durability  The mobile CPU of the TOUCH gives excellent durability under industrial environment.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
SP & DC-DC Considering the benefits of combining serial powering and DC-DC conversion technologies in powering ATLAS SCT upgrade modules & staves Richard.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
11 Computers, C#, XNA, and You Session 1.1. Session Overview  Find out what computers are all about ...and what makes a great programmer  Discover.
Status of the Beetle front-end chip carrier for SRS Lorne Levinson Weizmann Institute of Science Rehovot, Israel L. Levinson, Weizmann Institute, Nov.
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Peter W Phillips Ashley Greenall Matt Warren Bruce Gallop 08/02/2013.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Introduction A new generation of the ATLAS Binary Chip (ABC) readout ASIC has been designed in the IBM 130nm CMOS 8RF process to support ongoing R&D towards.
Presented by : GROUP 1 Associates: Ajeet Kumar Pooja Raikar Sangamesha J M Utkarsh Kumar Viresh Mathad.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
361 Hardware, Software, and Computer Performance Lec 2.
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
COMPUTER COMPONENTS Ms Jennifer Computer Components.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Chapter 1 Looking Inside the Computer System.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
SRTSC A LabVIEW based Test and Hardware Configuration System for SRS Volkan Gezer Eskisehir Osmangazi University & CERN.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
SCT Upgrade DAQ SCTDAQ/HSIO Status Bruce Gallop, Ashley Greenall, Bart Hommels, Peter Phillips, Matt Warren ATLAS Upgrade Week, DESY, April 2010.
Modular C ontroller S eries Product Introduction.
Berkeley status Aug 10th, 2012.
→ need to guide UV light into gap; also beware temp effects
Computer and Information Technology for HKCEE
+ Steve Worm (since Monday)
ABC130: DAQ Hardware Status Matt Warren et al. Valencia 3 Feb 2014
ITK Strip Module Meeting; 12st October 2015
Next steps – with notes from during the meeting 17 March 2016
Next steps - with notes from during the meeting 24 March 2016
Drill Translate the following message:
Hardware platforms - with notes from during the meeting 17 March 2016
Group meeting, 2nd Sept, 2013; JAW
Presentation transcript:

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham John Wilson, Simon Pyatt, Juergen Thomas (Birmingham)

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 2 The HSIO test system HSIO (High-Speed Input Output) is a Xilinx-4-FPGA-based board designed and produced by SLAC, which is the standard for testing Tracker ASICs, Hybrids and Modules. HSIO ‘mimics’ real control systems and can capture and store output data from the ASICs, called ‘ABCn’ (‘Atlas Binary Chip – next’). Connection between HSIO and ABCb chip is via a very smaller number of LVDS channels. Interface to outer world is a normal Ethernet plug, protocol however is not standard TCP/IP. HSIO is powered by ‘laptop-brick’ power supply (48V, >50W). HSIO setup for ATLAS Tracker groups developed and maintained by RAL, both s/w and Xilinx FPGA firmware (!). RAL experts: Peter Phillips, Bruce Gallop (B’ham postgrad), Matt Warren. Our HSIO was provided by Peter Phillips without pay (presumably on long- term loan)

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 3 Windows7-PC: Running ROOT. Red network cable connects the HSIO. HSIO: At Birmingham ! PB8

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 4 Software installation for Test Setup (1) HSIO is configured and controlled by the SCTDAQ software, developed by RAL, which resides on SVN at CERN under (restricted access): Very detailed setup instructions provided by RAL and Freiburg colleagues: Installation in Poynting lab on new PC with 1TB disk. Running on Windows7, to follow majority of (all?) other institutes running HSIO. HSIO connected via extra ethernet port (extra dual-ethernet card in PC) Root v5.34 installation on Windows7 exactly as described on Root website, using ‘Microsoft Visual Studio Express 2010’ (which is free, though requires registration after 30 days). We also have a full ‘Visual Studio Professional’ if required, via uni licence. Other tools to interface TCP/IP called WinPCAP and Whireshark also needed to be installed. Xilinx software provided by RichardS.

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 5 Software installation for Test Setup (2) After some twitching (ie don’t use vc10 config file, but let Visual Studio convert the vc9 file), compilation works. Adjusted network port to match SCTDAQ config HSIO can be accessed from SCTDAQ, using Root command:.x Stavelet.cpp

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 6 Software installation for Test Setup (2)

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 7 The ABC-N Testboard... This carries a real ABC-n prototype chip ! Power supply via a DSub-9 connector, using our TTI lab power supply Connection to HSIO via flat-ribbon cable with some swapped channels We have a ABC-N testboard, but I very naively connected it with a flat- ribbon cable without swapped input, and also turned it around (!). This likely broke the board (draws 360 mA instead of 480 mA), possibly a blown-up voltage regulator. Our testboard is under investigation at RAL, hopefully can provide a replacement, or we can try to replace power regulator ourselves. Now have properly-made cables thanks to SimonP !

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 8 The New Wire-Bonder: Hesse BJ820 (1) A wire-bonder ultrasonically welds the tiny wires between the ASICs and the surrounding board. Our old wire-bonder (Delvotek) didn’t have the necessary specs (ie working area) to carry-out bonding work of new Tracker hybrids With the efforts of many people in the group (PaulN, John, SimonP etc), a new wire-bonder model ‘Hesse & Knipps BJ820’ has been purchased, delivered in Nov ‘12. This is not a small-value item. Old bonder has been moved to a lab outside physics. Simon is in very active contact with the manufacturer and ATLAS colleagues esp at Cambridge and Liverpool to iron-out some initial issues, ie control s/w version differences. The new wire-bonder is now up and running in our clean-room in the Poynting basement. See following video by Simon !

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 9 The New Wire-Bonder: Hesse BJ820 (2) Simon’s video: MP MP4

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 10 Hybrid Production in a Nutshell In a nutshell, the following main steps are necessary to produce the hybrid: Position and glue ASICs onto the hybrid structure: R&D at Liverpool found that manual gluing using mechanical jigs works ok (machines carrying-out the automated process are _not_ cheap). 20 ASICs go onto one hybrid structure. Followed by ‘Curing’ process, ie wait to let it dry, >24hours with vacuum. Mount panel (containing 8 hybrids) into the wire-bonder and let bonder do its work If the board is ok under visual inspection, power it up and check electrical connection, and general functionality, esp measure the noise levels. This is where HSIO comes into the game. Use environmental chamber for test at nominal operation temperature (ie cold). Current idea (after gaining more knowledge with single-chip ABC-N testboard) is to move HSIO into the clean-room, with long ethernet cable to the PC outside. Also set-up eg VNC on laptop to have remote access to the HSIO also from inside the clean-room (ie to find initial connection problems)

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 11 Images from our Clean-Room (1) Placing ‘Glass-ASICs’ Placing-frame and vacuum jig. How glue is applied.

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 12 Images from our Clean-Room (2) Placing ASICs: 20 in one go. Note placing jigs connected to vacuum. The New Wire-Bonder (with Expert)

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 13 Next Steps Many items brought-over from Liverpool, RAL and Glasgow: Glass mock-ups for placing and gluing tests, along with various jigs, weights Half-populated hybrids for wire-bonding tests ASICs: A number of ABC-N250 dies (‘last generation’, but the real thing) Set-up HSIO test for ABC-N testboard (replacement or repair), learn more about SCTDAQ software (esp configurations) Kick-off meeting of Work Packages 3 and 5 (WP3/WP5) happened on Monday at B’ham

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 14 Back-up Slides

2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 15 The New Wire-Bonder: Hesse BJ820 (3)