Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.

Slides:



Advertisements
Similar presentations
Bardia Baheri Rotary High Voltage Motor Physics project.
Advertisements

FGT installation disks … viewed from the back (From West end looking in towards vertex). SSD cables go in the spaces above and below the rails on the left.
BELLWORK SINGLE POINT PERSPECTIVE
Boudary Layer.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
DR-2000 Customer Benefits Security; Tamper resistant programming protects your customer and you! Low maintenance, long battery life & long squeeze tube.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
For smaller numbers of specimens For larger numbers of specimens Folding insect box Cat. No. 1002F or 1002FX Unit tray shipper with polyfoam insert Cat.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
Restructure of WP4 – provisional ideas and numbers to promote discussion Ian Wilmut.
Scanning Tunneling Microscope How to use the STM Developed by Malory M. Peterson, Summer 2006 Nanotechnology Grant National Science Foundation #
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
(Smart Loop System) Installation Guide. Rev B Shipping Box Contains Everything that is included in the box being shipped to a customer should contain.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
9-1 Project 1. Purpose To determine which type of material (interlocking brick, wood, nothing, or aluminum cans) when arranged as a retaining wall will.
Surface Mount Device Soldering Materials by Linz Craig.
Handwriting Workshop For Reception Parents
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
BRIDGE AND ROV GROUP 4. Alex Paige Collin Palmer Sifat Syed Marc Hermann.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
Earth’s Movements in Space. OK, we already know that at the very beginning there was a huge explosion called the Big Bang. It created everything there.
Using cartoons to draw similar figures
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Notes on Converting 3 Rail Locomotives to 2 Rail Operation By Joe Foehrkolb Baldwin Forge & Machine Baldwin, Maryland.
Module mounting. Status Stave 250 received… damaged – Repair now complete (see extras) Friday at 8:30 it will be collected by RAL driver and transported.
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Cartoon Similarity Using cartoons to draw similar figures
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
Surface Area of a Rectangular Prism Day 1 (of 2).
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Stave Assembly (module mounting and stave 250) Ian Wilmut (RAL)
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
Building from Templates. The Concept First things first: In the beginning was the idea. For example, “I need a coffee table, something unique but functional.”
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
Task 5: Test / Shipping Status Report. Overview  Where are we  Chamber  Stavelet holder frame  Module mounting frame  What next QMUL Sept 10.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Assembly of steering.
VIEW SERIES with Sliding Door
Rear end assembly.
What is Stave Carrier Frame Required to Do?
Cylinder design Ian Wilmut 10/11/11.
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Are there better ways to build a stave?
Mechanics: (Tim).
Graham Beck, QMUL, WP4 RAL 2 May 2013
Equipment for Assembly – UK Experiences
Studies of Quad Pixel Module assembly using paper laminate
2.2 Gallon TourTank Installation
Radiation Laboratory Meeting
Decide which length you plan to use on the Bandaid. Then check to be sure your bandaids are all the same length. These small Band aids have 2.
Presentation transcript:

Module mounting Ian Wilmut (RAL)

Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have so far comes from his input. Martin died on Tuesday 20 th August from Oesophageal cancer Module mounting activities will continue at RAL picking up where Martin left off. – We hope we can continue to do as good a job as he always did We are all very sad about this – and are only now starting to realise just how much he knew

I will talk about Stave 250 – Where we stand today (well Monday when I left) – What we had to do to get here Recap on how the module mounting works – Very quick Plans for stave 250 Plans for the long term future – 130nm modules – Pixel disk module mounting Problems we have encountered – What stave producers might try and improve!

Stave 250 Received Repaired Retested Installed in frame Test connected to infrastructure Ready for mounting 5 flat test plates to “flat” stave 3 psudo bowed modules to “flat” stave 2 real bowed sensors to stave Stave 250 (DC-DC)Module mounting

Stave 250 repair Stave 250 was built in the US between Brookhaven and LBL It was packed and shipped form LBL When it was received at RAL it had been “smashed” on one end We have instigated a repair by flooding the core with epoxy (West G-flex 650) The core was then thermally imaged and cycled top see if any damage was evident.

We had some quite big holes to fill!

We drilled holes along the end…

11 12 Which looked a bit like this

We then injected glue through the holes 11 12

Filling of extra holes Small amount of surface flue where the masking allowed a little build up Smaller crack on rear completely filled

It was set up at QMUL and thermally imaged with warm water Graham Beck, QMUL 1 st August

Thermal Cycling (first 5 cycles – next 5 are similar): - about 45 mins/cycle - Red line is thermocouple taped to End of Stave region (CFRP) Graham Beck, QMUL for WP3/5, 29 April Then thermally cycled

10cm interval IR - 3D images (damaged side, before cycling) Graham Beck, QMUL 1 st August

Before/After IR of damaged end Graham Beck, QMUL 1 st August Water bath and ambient are slightly different temperature before and after (try harder in future!) Maximum T rise of surface above ambient ~ 10 degrees (above pipe) - This is constant within a degree along stave length (0.5C asymmetry due to water cooling along length) and wrt before/after cycling.

Module mounting process I have discussed this lots of times before… – Ref Rather than re-cap the whole process in minute detail here is a “cartoon” explanation of what is happening.

And then Returned to RAL Fitted in the frame Frame fettled to fit stave – We need to understand the stave build better (later in talk) Plasma cleaned again Ready for modules

Module mounting system

We have a stave with a camera that can move in x and y X stage Y stage

LASER As the X axis of the stage isn’t very straight we have laser line to correct things X stage Y stage

LASER Into this we insert a stave in a frame (eachstave stays in the frame for the whole build) X stage Y stage

LASER The frame has a series of fecucials that can be found and a co-ordinate system placed with X stage Y stage

Finish sequence….

Gluing down modules

Challenges Up until 2 months ago only Martin had ever glues modules We are trying to learn how best to do it… Lots of photos etc…

Module shape One specific challenge is that the module change shape when attached to the vac chuck. Free shape Shape on chuck

Status of modules on stave 250 To be written as I go into the meeting at LBL

Lessons learned on stave production The edges are not straight – If this is always going to be the case we need to change the handling tooling Glue filets are a problem – photos on next slide We need to pack more robustly We think we now know how to mount modules as well as Martin did.