ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT.

Slides:



Advertisements
Similar presentations
Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Advertisements

West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Overview What is the National ITS Architecture? User Services
Wade E. Kline, AICP Community Development Planner.
San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.
Presented to presented by East Central Florida Corridor Task Force Space Coast TPO 02/16/15 Huiwei Shen Systems Planning Florida Department of Transportation.
Transportation Operations Master Plan John Ward ITS-Pennsylvania Panel Discussion Vision for Achieving Regional Mobility through ITS November 23, 2010.
SAN DIEGO I-15 INTEGRATED CORRIDOR MANAGEMENT PROJECT Alex Estrella, SANDAG.
Update on VDOT’s Northern Virginia ITS Architecture Plan and Integrated Corridor Management (ICM) Activities MANAGEMENT, OPERATIONS, AND INTELLIGENT TRANSPORTATION.
Integrated Corridor Management Initiative Overview Brian Cronin Congestion Program Manager ITS Joint Program Office.
Integrated Corridor Management Overview and Status Mike Freitas ICM Initiative Coordinator U.S. DOT ITS Joint Program Office.
Florida’s Future Transportation Corridors Florida’s Future Transportation Corridors Presented to: Florida Redevelopment Association Presented by: Bob Romig.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
Welcome to the Integrated Corridor Management (ICM) Pioneer Sites Webinar July Audio: , passcode
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
1. 2 VIA Long Range Plan  Vision for High-Capacity Transit across VIA service area by 2035  From extensive public and stakeholder input  Prioritization.
ICM Minnesota – Interstate 394 Brian Kary, Minnesota Department of Transportation.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
DATS Bicycle Planning 2009 Bicycle Advisory Committee Kickoff Danville Area Transportation Study July 13, 2009.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Department of Architecture and Regional Planning, IIT, Kharagpur Perspective Plan for Barddhaman Planning Area – Vision 2025 VISION.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
By Syd Bowcott, URS Corp Bayne Smith, URS Corp.  Purpose of this Presentation  Overview of Project Area  Background  Project Goals  Stakeholders.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Montgomery County Maryland I-270 Integrated Corridor Management Project Tom Jacobs, University of Maryland Center for Advanced Transportation Technology.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
Dixie Regional ITS Architecture Project Summary July 31, 2006.
Minnesota I-394 ICM Corridor. What is Integrated Corridor Management? Independent Network of Transportation Systems –Freeways, including managed lanes.
A Model for Improving Operations through Archived Data 2005 ITS America Annual Meeting Mark Carter – SAIC Robert Haas - SAIC May 2 nd, 2005 i Florida’s.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
Talking Technology & Transportation (T3) Webinar July 25, 2007.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Dallas ICM Pioneer Site Stage 1 Lessons Learned Webinar July 24, 2008.
The Fully Networked Car Geneva, 4-5 March Ubiquitous connectivity to improve urban mobility Hermann Meyer ERTICO.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Walter Kulyk, P.E. Director, Office of Mobility Innovation Federal Transit Administration Session 11: ITS Research in the U.S. and Abroad 2007 ITSA Annual.
SUSTAINABLE TOURISM AND MOBILITY Mara Manente CISET - University Ca’ Foscari of Venice CONFERENZA INTERNAZIONALE SUL TURISMO SOSTENIBILE Rimini-Palacongressi.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
Planning For an Upper Valley Transportation Facility October 1 st, 2009 Howe Library, Hanover, NH Upper Valley Lake Sunapee Regional Planning Commission.
200/768_K 0 Sustainable Growth & Development Subcommittee Report Committee for a Sustainable Emerald Coast May 17, 2007.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
IntegratedCorridorManagement 1 Integrated Corridor Management Overview and Activities Jeff Lindley Director, Office of Transportation Management FHWA February.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Educating Students for ITS Careers: Are Universities Meeting the Challenge? Transportation Agencies Perspectives Model Operations Nicolaas P. Swart, P.E.
Integrated Corridor Management (ICM) Brian P. Cronin, P.E.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the National Capital Region Transportation.
December 17, 2010 Developing Transit Performance Measures for Integrated Multi-Modal Corridor Management.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
Pioneer ICM site in Seattle – SoDo Corridor Vinh Q. Dang, WSDOT.
STEERING COMMITTEE JANUARY 24, INTRODUCTIONS 2 WHO IS ON THE PROJECT TEAM?  Dakota County Regional Railroad Authority  Ramsey County Regional.
Unit 2 DEVELOPMENT OF THE LONG RANGE TRANSPORTATION PLAN (LRTP) LCTCC Educational Program.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
Project Overview – Phase 1
Draft Transportation Element September 6, 2017
Welcome to the New Smart City by TrafficCast…
Presentation transcript:

ICM San Antonio – IH-10 Corridor Brian Fariello, TxDOT

2 Operational – Why San Antonio needs ICM IH-10 primary corridor in San Antonio –Connects central business district with residential areas –Two main UTSA campuses –South Texas Medical Center –Major employment centers include USAA and Valero –Recreational attractions: Six Flags, shopping, River Walk, and the Alamo (Most visited tourist destination in Texas)

3 Operational – Why San Antonio needs ICM Need for ICM –Increased congestion and decreased reliability on expressway –Arterials are congested and lack single centralized signal control system to maximize throughput –Decreased bus transit reliability and spare capacity available –Future construction (BRT and expressway) will require improved transportation management

4 Operational - San Antonio ICM Corridor Overview Approximately 15 miles of IH-10 from suburbs to downtown –Split level expressway located near down-town –Parallel frontage roads Adjacent arterials run throughout corridor –Fredericksburg Road –Bandera –Military / Blanco Bus transit services –Significant ridership in corridor –Express service –Park and ride locations

5 Operational – How ICM will help San Antonio ICM Operational Approaches and Strategies –Information sharing / distribution –Improve the operational efficiency of network junctions and interfaces –Accommodate / promote cross-network and modal shifts –Manage capacity and demand in the corridor Specific examples: –Promoting alternative routes on DMS messages –Improving throughput on frontage roads and arterials with signal timing patterns to support diverted traffic from expressway –Improved traveler information services

6 Operational – San Antonio ICMS Operational Tactics

7 Institutional – Who are our ICM Stakeholders Texas Department of Transportation City of San Antonio VIA Metropolitan Transit San Antonio Police Department Emergency Operations Center San Antonio Fire Department Southwest Research Institute Texas Transportation Institute

8 Institutional – How San Antonio defined Roles and achieved Buy-in among ICM Stakeholders ICM mission and vision statements based on common transportation themes from public stakeholder agency’s mission statements, vision statements, and goals –Allows for executive level support from public stakeholder agencies Utilized existing facilities, forums and working relationships to facilitate institutional cooperation –Existing San Antonio ITS Technical Committee Establishes ICM policy and operational procedures Provides ICM oversight Manages fiscal and infrastructure planning for region –San Antonio TransGuide Facility Currently hosts public sector agencies in co-located operations facility

9 Technical – San Antonio ICMS System Architecture

10 Technical – How San Antonio facilitates ICM Existing Subsystems Key to ICMS –Center-to-Center (C2C) Collects data transportation related data from disparate regional systems Data “fused” into central server for distribution between agencies and systems Standards based –Data Archive Archives C2C data Historical data available –Incident detection based on historical trends –Data Analysis

11 Technical – Newly Proposed ICMS Subsystems Center-to-Center Interfaces ICMS Operations User Interface Decision Support Subsystem –Historical Data Analysis –ICMS Event Management –ICMS Arterial Travel Times Corridor Web Site –Personal Emergency Trip Planner –Corridor Data and Map –Mobile Device Accessible Web Site

12 Lessons Learned – Operational Operation co-location essential Working group meetings –Ensures stakeholder involvement –Forum to obtain input and reach a consensus –Recommend three to five meetings Involve stakeholders with –Operational knowledge –Decision making power –Could require more than one stakeholder per agency Leverage existing operational strategies –Example: San Antonio Ice Plan

13 Lessons Learned – Institutional Leverage existing agency coordination and relationships Utilize existing forums –San Antonio ITS Technical Committee Understand public agency objectives and current issues –Communicate ICM in terms of other’s needs

14 Lessons Learned – Technical Requirements Specification –Focus requirements on “what” the system will do functionally –Avoid designing system details during requirements development Utilize staff and consultants familiar with existing systems –Maximizes building upon existing systems and capabilities Arterial travel times / conditions data “challenge” –Lack of ITS infrastructure for gathering this data exists nationwide –Potential to use bus AVL data scaled to account for service related stops and reduced travel speeds Challenges exist in applying standard IDAS software results at a corridor level