What are our goal(s) for green infrastructure?.

Slides:



Advertisements
Similar presentations
Charlotte-Mecklenburg Storm Water Services Welcomes ASU and the Town of Boone To Our Side of the Storm (How to manage the “perfect Storm”)
Advertisements

The Water Balance Model: A Tool for Designing with Nature Douglas College Rain Conference.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
Modeling to Support Green Infrastructure Planning Best Management Practice-Decision Support System (BMP-DSS) Application Andrew Parker Director, Water.
 Threats to Water Resources: Polluted Stormwater Water Resource Congress October 2014.
Water Too Much or Too Little? Or a Little of Both? URS Group Inc ASFPM National Conference May 2010.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
Floodplains by Design: natural infrastructure for people and for nature Kris Johnson, PhD 5/29/2013.
Why is Groundwater Important? Drinking water for nearly 50% of US 98% of rural domestic supplies 35% of public supplies 42% of irrigation for agriculture.
Detention Basin Saw Tooth Outlet Structure. Detention Basin Water Flow In Saw Tooth Outlet Structure On Site Water Off Site Water.
Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Spokane River Forum 23 May 2011
Exploring Scenarios. What I have learned from presentations The default option is habitat loss Two kinds of restoration actions –Direct action: making.
THE LIFE-CYCLE COSTS AND BENEFITS OF RAIN GARDENS IN MINNESOTA Chris Hartzell & Joe Nietfeld.
Total Economics of Sustainable Land Management Jonathan Davies Global Drylands Programme.
California’s Surface Water Ambient Monitoring Program SWAMP Today Emilie L. Reyes November 29, 2007.
Identification of King County Streams with Declining Summer Flows Curtis DeGasperi, King.
Do large scale restoration projects reduce within- species trait variability? Harzé Mélanie*, Monty Arnaud and Mahy Grégory University of Liege, Gembloux.
FAIRVIEW AVENUE GATEWAY GENETTA PARK AND STREAM RESTORATION PROJECT Presented by: Barge Waggoner Sumner & Cannon, Inc. Presented to: City of Montgomery.
YOUR SCHOOL AND YOUR WATERSHED LORNA ROSENBERG- US EPA MID-ATLANTIC OCT 1-2, 2014 CHESAPEAKE BAY SCHOOLS WORKSHOP – SHEPHERDSTOWN, WVA.
Restoring Shellfish to Improve Our Coasts, Support Green Jobs, and Boost the Economy ICSR 2010 Conference Summer Morlock – NOAA Restoration Center.
Hydroelectricity. little bit of information about hydroelectricity, well first is does involve water it can either be falling or the flow of the water.
Estimating Future Floods to Manage Flood Risk Michael Anderson California State Climatologist Extreme Precipitation Symposium 2012.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
From Policies to Programs to Practices Establishing the Green Infrastructure Eric Friedman Director of State Sustainability Mass. Executive Office of Env.
Stormwater… Problems & Solutions Jim Nash. A water resources commissioner Then… Unique to Michigan Initially cleared swamps and marshes Each township.
Where does water come from? The water cycle and how it gets to us.
CONTINENTS AND OCEANS.
EPA Homeland Security Strategy  Critical Infrastructure Protection  Preparedness, Response & Recovery  Communication and Information  Protection of.
Effects of Teak Plantations on Water Supply at KVTC HJ van Hensbergen for Dave Scott.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Rivers and Drainage Basins - A Prelude to Flooding Drainage basin/River basin: An area of land drained by a main river and its tributaries. Drainage basin/River.
Development of a water temperature model to predict life- history expression and production of Oncorhynchus mykiss in the John Day River basin, Oregon.
The Drainage Basin System
Southwest Florida Water Management District Association of State Floodplain Managers Orlando, Florida June 9, 2009.
Day 37 Investigation 7 part 1 The Water Planet. Reading a Pie Chart Visualization Exercise 7.1.
Northwest Power and Conservation Council slide 1 Follow Up Actions to ESPX Collaboration – “center of knowledge” type repository for information and research.
Wetlands Restoration Opportunities in Region 4. Los Angeles River – DeForest Wetlands Currently a flood control detention basin Adjoins the Dominguez.
Some Basic Hydrologic Concepts Weir are used to measure volume of water flowing past a point.
Water Resources Research: River Restoration Katie Halvorson.
Stormwater and Low-Impact Development in San Diego, CA Mitchel J. Bartolo November 24, 2015 Source: City of San Diego.
Data analysis GLUE analysis Model analysis Rating Curve analysis based on hydraulic model Formulation of different Rating Curve models Pappenberger et.
LOW IMPACT DEVELOPMENT John Blount, P.E. Director Planning & Operations.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
19-Aug-2003MWMC presentation to NWQMC1 Long Term Ground Water Level Monitoring Integrated Hydrologic Monitoring 2003 Annual Conference.
Welcome to The Mojave River Wildlands… Water Walk.
KY FEMA DEBRIS DOCUMENTATION Ice Storm extent.
WISER Water bodies in Europe: Integrative Systems to assess Ecological status and Recovery.
Fermilab Environmental Management System (EMS) Senior Management Training Module FN000378/CR/01.
Global Best Practice Examples for Integrated Water
Living Things and the Environment: Habitat and Abiotic vs. Biotic
Project-Based Learning: Design and Build a Rain Garden
Weather. Water cycle Changes in weather.
Controlled assessment
Hydrology of a Dynamic Earth March 2007
Project-Based Learning: Design and Build a Rain Garden
Hydrologic Cycle Review
LID Guidance and Training for Southern California
EDLC(Embedded system Development Life Cycle ).
Hydrologic Control Structure
Rainscaping for watershed restoration
Extremes at elevation – high flow events on Mount Mansfield
THE WATER FRAMEWORK DIRECTIVE (WFD)
A brief class assessment
So what is Water Resources Engineering?
MONITORING DOCUMENTION FOR THE INDIANA DEPARTMENT OF EDUCATION
NGOs expectations for next WFD cycle
Presentation transcript:

What are our goal(s) for green infrastructure?

Do we know whether we are meeting these goals?

What are our goal(s) for green infrastructure? What aspect of pre-development hydrology? Small storm flows? High flows? Low flows? Entire hydrologic cycle? Do we know whether we are meeting these goals?

What are our goal(s) for green infrastructure? Define scale (individual site or large river) and monitor for the water quality/ biotic improve- ment at that scale What aspect of pre-development hydrology? Small storm flows? High flows? Low flows? Entire hydrologic cycle? Do we know whether we are meeting these goals?

What are our goal(s) for green infrastructure? Over what time scale? Track costs closely and may need to consider up front vs. ongoing vs. future restoration costs Define scale (individual site or large river) and monitor for the water quality/ biotic improve- ment at that scale What aspect of pre-development hydrology? Small storm flows? High flows? Low flows? Entire hydrologic cycle? Do we know whether we are meeting these goals?

What are our goal(s) for green infrastructure? Over what time scale? Track costs closely and may need to consider up front vs. ongoing vs. future restoration costs Define scale (individual site or large river) and monitor for the water quality/ biotic improve- ment at that scale What aspect of pre-development hydrology? Small storm flows? High flows? Low flows? Entire hydrologic cycle? Monitor the other benefits we are targeting Do we know whether we are meeting these goals?