Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.

Slides:



Advertisements
Similar presentations
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Advertisements

Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
2006/09/25-28 ILCDR06, Cornell University 1 Experimental Study on Suppression of Electron Cloud Effect at the KEKB Positron Ring Contents Introduction.
Progress and Plan for Superconducting RF Cavity RF Group.
Recent observations of collective effects at KEKB H. Fukuma, J. W. Flanagan, S. Hiramatsu, T. Ieiri, H. Ikeda, T. Kawamoto, T. Mitsuhashi, M. Tobiyama,
Vacuum System Elements for BESSY II Vacuum Equipment All vacuum elements are produced at BINP in accordance to the European standards and satisfy the.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
DR Vacuum Component Overview April 25, 2012 Joe Conway.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Beam Induced Pressure Rise in Ring, Dec. 9-12, Beam Induced Pressure Rise in Ring ~ Experiences in KEK B-Factory ~ 1. Introduction :KEK.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
Status of the activities on vacuum system C. Garion TBMWG, 20/06/2012.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
2007/09/17-21 SLAC IRENG07 1 A Basic Design of IR Vacuum system Y. Suetsugu, KEK Possibility of a pumping system without in-situ baking at z < L*
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
Electron cloud measurement in Cu/Al chambers with/without TiN coating at KEKB positron ring ILC DR Working Group Meeting Kyo Shibata (KEK)
Updates of EC Studies at KEKB 1.EC studies at KEKB 2.Recent results 1.Clearing Electrode 2.Groove surface 3.TiN coating 4.Measurement of EC in solenoid.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
2007/03/1-2 ECL2, CERN 1 SEY and Clearing Studies at KEKB Contents Contents Introduction Studies Beam duct with Ante-chambers Coatings with Low SEY Clearing.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
2007/09/17 SLAC IRENG07 1 Comment on IR Vacuum system Y. Suetsugu Pumping System without in-situ baking at z < L*
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
RTML Vacuum System RDR Summary FermiLab October 24, 2007
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Electron cloud & vacuum pressure observations: 2011 proton run
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
CEPC Vacuum System Dong Haiyi 2017/11/5.
The PEP-II Interaction e+e- Factories Workshop
Weekend Summary Squirted N2 at 3027 under various conditions
XFEL Collimation and Beam Switchyard Vacuum Issues
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Vacuum status at KEKB Junji Haba.
CEPC Vacuum Systems Design Consideration
IR Beam Transport Status
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Presentation transcript:

Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components

Vacuum System at IR Here IR (Interaction region) means the straight section in ±~100 m from IP (Interaction Point), especially upstream side of each ring. Material of beam duct: OFC (Oxygen Free Copper) for most part (both rings). Aluminum alloy for complicated chamber just near to IP. [OFC] [Aluminum Alloy]

Vacuum System at IR Vacuum pump: Main pump = NEG (st707) : almost every 1 m (0.2 m 3 /s), Auxiliary pump = Ion pumps : almost every 10 m (0.2 m 3 /s). In average, about 0.7 m 3 /s/m just after an activation of NEG. NEG module (just near to IP) NEG cartridge (arc section)

Vacuum System at IR Vacuum gauge = CCG (Cold Cathode Gauge) just above ion pumps (every ~10 m). A small dipole magnet (permanent magnet) is attached at the neck of gauge port to eliminate photoelectron effect. CCG ~100 G Without Manget

Vacuum System at IR Location of Gauges and Pumps near to IP IP LER HER (D02_H24) D02_H23A D01_H01A D01_H02A D02_H23 D01_H02 [Inside of BELLE Solenoid] Integrated NEG 0 5 m 10 m

Vacuum System at IR HER Upstream Side (straight section, ~100 m) Straight : No bending magnet Gauges: every ~10 m IP D01_H01A D01_H02A D01_H03 D01_H8 D01_H04 D01_H09 D01_H05 D01_H10 D01_H06 D01_H7 D01_H11 HER GV BS

Vacuum System at IR LER Upstream Side (straight section, ~100 m) Local correction region: 13 bending magnets Gauges: every ~10 m LER D02_H23A D02_L24 D02_L23 D02_L22 D02_L21 D02_L20 D02_L19 D02_L18 D02_L17 D02_L16 IP GV BS GV

Behavior of Pressure HER_1 IP D01_H8 D01_H06 D01_H7 2x10 -7 Pa A Heat Source = Gate Valve Three days including several beam Injections. P IbIb Big BG Source D01_H01AD01_H02AD01_H03D01_H04

Behavior of Pressure HER_2 Three days including several beam injections. D01_H8 D01_H09 D01_H10 D01_H06 D01_H7 D01_H11 Heat Source = HOM Absorber, Taper Heat Source = Stopper (~ Gate Valve) Gate Valve

Behavior of Pressure LER_1 Three days including several beam aborts. D02_H23A D02_L24 D02_L23 D02_L22 D02_L21 D02_L20 D02_L19 D02_L18 IP Heat Source = Gate Valve ? (NEG?) Heating +NEG? Multipactoring? 3x10 -7 Pa A P IbIb

Behavior of Pressure LER_2 Three days including several beam aborts. D02_L20 D02_L19 D02_L18 D02_L17 D02_L16 D02_L15 Heat Source = Stopper Heat Source = Taper ? (NEG?) Gate Valve

Present Status The pressures near to IP is <1x10 -7 Pa for HER and ~2x10 -7 Pa for LER at the maximum operation current. The pressures at upstream side of IP (IR) is almost less than 1x10 -7 Pa, but affected by the heating of components, such as gate valves, stoppers, HOM absorbers and NEG(?). The same harmful effect by heating can be seen widely in arc sections too.  A major problem for further improvement of pressure.

Remedies to heating Main reason of the heating is HOM. Tentative measure = Cooling from outside [Bellows] [Gate Valve] Heating of Gate Valves, Stoppers and Bellows –Finger-type RF shield is not enough for high current –TE mode can easily coupled to modes outside symptomatic therapy

Remedies to heating Future (more essential) measure –Proposal of a New RF-shield structure –Comb-type RF-shield –6 circular-type and 1 race-track-type has been installed in LER, and showed good results. –Application to gate valves are now planed and a test model will be installed in the ring this winter.

Remedies to heating Heating of NEG –Gas desorption from heated NEG had been observed near collimators. –HOM (TE-mode) intruded through a grid into pump port. Tentative measure = use a special gasket HOM absorber were installed finally.  = 6 mm t = 2 mm Cu Lead to heating of other components

Remedies to heating Heating by other HOM sources, such as collimators or tapers. Slot Beam Chamber SiC Wing SiC Install HOM absorber chamber –Example installed near collimators –HOM absorber = SiC Require Space ! How about IR?

Summary The pressures at upstream side of IP is almost less than 1x10 -7 Pa, but also affected by the heating of components, such as gate valves, stoppers, tapers, NEG and HOM absorbers. The problem had been solved accordingly so far. But, essential (drastic) remedies, such as employing new RF- shield or installing HOM absorbers, will be required for future high current operation. Improvement of pumping speeds and cooling capacity are of course important.

References

Present Status Typical Run(11/09/2004) Ave. Pressure  Pa Beam Current 1.2A x 1.6 A Lifetime 230, 180 min Luminosity ~1.1x10 34 cm -2 /s Beam currents are usually limited by any problems in vacuum components

Present Status Vacuum Aging (arc section, -2004/10/31) –  P/  I :  1x10 -7 Pa/A – Photo-desorption coefficient,  :  3x10 -7 mole./photon – Effect of photoelectrons were eliminated by magnets. – HER seems to be effected by heating of components. (If S = 0.3 m 3 /s/m) [PM]:Set permanent magnets to every gauge port  P/  I Max. I  P/  I PM [Pa/mA] [mA] [LER] [HER] (Corrected)

Present Status Vacuum pressures in HER (~300 gauges) Just near to GV! (ARES) (SCC)