Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor:

Slides:



Advertisements
Similar presentations
Slide title In CAPITALS 50 pt Slide subtitle 32 pt European R&D.
Advertisements

1 Analysis of NGMN Requirements REQ 4: LTE Automatic Neighbor Relation (ANR) and Self Organizing Networks (SON) Operation.
1 Analysis of NGMN Requirements REQ 9: LTE Parameter Optimization.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt G3X Series Fixed Wireless Terminals for GSM/EDGE Networks.
The Business Value of CA Solutions Ovidiu VALEANU Senior Consultant DNA Software – CA Regional Representative.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Converged SAE / NGN Architecture The ScaleNet Architecture R. Keller, A. Schieder, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson satsning på Public Safety - National Security HIØ Personalseminar – 9. mai 06 - Ed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt OTP Development update.
Usability 2004 J T Burns1 Usability & Usability Engineering.
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network Chapter 14: Troubleshooting Windows Server 2003 Networks.
1 Analysis of NGMN Requirements REQ 6: Substitution of Monitoring Probes by Infrastructure Inherent Trace Functionality.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Frame Header Based Speech Quality Analysis Method in a Circuit-Switched Media Gateway Master’s Thesis.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt BSNL 3G Network Parameters affecting Data Speed
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Consumers’ Awareness of, Attitudes Towards and Adoption of Mobile Phone Security Stewart Kowalski, Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt KPI Reporting and Analysis Templates Naren Mohan
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Open Source Business Models for Mobile Media Gateway Node Manager.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improved project management practices as a key to the successful IS implementation Željka Požgaj*, Hrvoje.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Site DB creation and updates 05/08/2006 by Performance Team.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Bitstream and Hybrid Model VQEG Meeting, Kyoto, March 2008 Jörgen Gustafsson and Martin Pettersson.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Service requirements from 3GPP TS SDO Emergency Services Coordination Workshop (ESW06) Columbia.
1 Analysis of NGMN Requirements REQ 3: Energy Saving.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Developing a Testing Process for Remote Usage of Multimedia Messaging Centre Master´s Thesis Presentation.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ESPA in WCDMA.
1 Analysis of NGMN Requirements REQ 10: Automatic Inventory.
1 Analysis of NGMN Requirements REQ 5: Performance Management in Real-time.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt “42” ICT in Ireland Life After the Tiger David Cleary
Slide title In CAPITALS 50 pt Slide subtitle 32 pt PDU PCN TTCN 3 in SGSN testing Peter Eldh.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt The Development of Courseware for Smartphones Judy Nix Ericsson Education Ireland.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt POWER CONTROL UMTS Seminar.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Simple DNA draft-krishnan-dna-simple-03 Suresh Krishnan Greg Daley.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Model based development for the RUNES component middleware platform Gabor Batori
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Cost Control in Service Composition Environments NGMAST 2008 Jörg Niemöller, Raphaël Quinet, Roman Levenshteyn.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Static Call Admission Control and Dimensioning of Media Gateways in IP based Mobile Core Networks Mika.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Configuration Aware Distributed System Design in Erlang Gabor Batori, Zoltan Theisz, Domonkos Asztalos.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Performance of Signalling Compression in the Third Generation Mobile Network Jouni Mäenpää S
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Dynamic and Persistent Scheduling for Voice over IP Traffic in the Long-Term Evolution Uplink Master’s.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
1 Analysis of NGMN Requirements REQ 7: eNodeB Plug & Play Self Commissioning.
Ericsson Tower Tube. Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24.
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Risk-based regression testing in a telecommunication system node Master’s thesis presentation
Slide title In CAPITALS 50 pt Slide subtitle 32 pt ANALYSING EFFECTS OF MALFUNCTIONS ON THE PERFORMANCE OF UMTS RADIO ACCESS NETWORKS Author: Antti Keintola.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson IMS CANTO 2005, St. Kitts Antonio Gómez Business Unit Systems.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Verification of a GPRS Charging System in a Simulated Test Environment Author: Kirsi Koskenheimo Supervisor:
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ambient Networks Media Delivery in the 3GPP Framework Author: Outi Koski Supervisor: Heikki Hämmäinen.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt SEND Certificate Profile draft-krishnan-cgaext-send-cert-eku-01 Suresh Krishnan Ana Kukec Khaja Ahmed.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Some Background about 3GPP SA4’s RTSP extensions Thorsten Lohmar.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt DNA wg IETF71.
Security Level: HUAWEI TECHNOLOGIES CO., LTD. Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Guidelines for Firewall Administrators Mobile IPv6 Suresh Krishnan, Niklas Steinleitner, Ying Qiu, Gabor.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Authentication/Authorization for possible deployments Relevant scenarios for CAFE.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Capacity Management in WCDMA.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Simple DNA draft-ietf-dna-simple-03 Suresh Krishnan Greg Daley.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Improvement of Software Delivery Process in the Telecommunications Industry Xian Sun
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Guidelines for Firewall Vendors Mobile IPv6 Suresh Krishnan, Yaron Sheffer, Niklas Steinleitner, Gabor.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt GMPLS RSVP-TE extensions for OAM Configuration IETF-81 Quebec.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Flow Distribution Rule Language for Multi-Access Nodes draft-larsson-mext-flow-distribution-rules-01.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial Copyright©2012.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Multi-component KPI:s ETSI/STQ_Mobile(08)18TD10.
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial HUAWEI.
Software Engineering D7025E
Presentation transcript:

Slide title In CAPITALS 50 pt Slide subtitle 32 pt Proactive fault management in mobile core network Niko Isotalo Instructor: Ira Antikainen Supervisor: Timo O. Korhonen

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Agenda  Objectives  Designin the Equipment  Further development  Conclutions

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Objectives of the thesis To design system which will...  Efficiently detect faults and configuration errors from the customer network  Help network operator in more difficult problems  Be available as many customers as possible  Create clear procedures what to do when error has been found  Be easy to use and maintain

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Design process challenges/problems 1.What tasks are needed to effectively manage customer network? 2.How to help network vendor in more demanding tasks? 3.How product availability for the all the customers can be assured? 4.How to create user interface which is easy to use? 5.How to measure user interfaces usability?

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Effective management of customer network  Regular health checks  Regular backups  In case of alarm/fault logs are created and health check is done

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Advantages for network vendor  Collection of all necessary logs  Information about already know product problems  In case of alarm/fault logs are created and health check is done

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Product availability for all customers Where to place equipment: -All the customers does not have remote access to their network -Product should be available to all the customers – system will be placed on the customer network Security policy: -Customers has different security policies and some are tighter than others. Because of this systems securtity policy is strict, but flexible.

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Designing user interface Usability goals: -System should be easy to use -System should be logical to use -System should guide you towards wanted action -System should be efficient to use -Visual expression should be neutral

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Designing user interface Usability goals are met by following nine principles of user Centric design 1.Design for the users 2.Involve users in the development process 3.Be consistent 4.Use simple and natural dialogue 5.Reduce unnecessary mental effort by the user 6.Provide feedback to the user 7.Use prototypes to evaluate ideas 8.Usability goals should control the development 9.User centric attitude

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Measuring usability of user interface Test scenario: 1.Add different network elements and specify task to them 2.Change configuration information of the nodes 3.List and delete network elements 4.Totally 61 different tasks

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Measuring usability of user interface Usability of the user interface was measured by monitoring following attributes Percentage of succesfully completed tasks Time needed to complete these tasks Number of errors made Users subjective satisfaction

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Measuring usability of user interface Results: Average number of errors (%) Average time spent completing the tasks Average number of errors Average satisfactory level 1,67min 57sec14

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Furher Delvelopment  Update the list of know problems and procedure how those problems are solved  Rule-based classification algorithm, –This algorithm will predict error behaviour by searching for eventsets before the target event –Can predict critical events with 70% accuracy

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Conclutions  Fault management can be improved with already existing tools by using those more efficiently  Using these same tools, support for customer can be offered faster  Designed system saves time –more time can be spent on root cause analysis of the new problems  Customer networks will be in better shape which leads to a more stable networks

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network Questions?

Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level pt © Ericsson AB 2007Proactive fault management in mobile core network