Integrated Pain Management HIT To provide a fully integrated, multidisciplinary, life span clinical service for chronic pain that brings together senior.

Slides:



Advertisements
Similar presentations
Optimising the Primary/Secondary Care Interface in Eye care Services Richard Best Belfast Health and Social Care Trust.
Advertisements

Primary Mental Health Workers in CAMHS Team Helen Hipkiss CAMHS Manager Walsall SHA/NIMHE Development Lead Thanks to Dr. G. Urquhart Law.
Sarita Yaganti Project Lead Service Improvement Cancer Commissioning Team West and South London.
Welcome to the new acute and community County Durham and Darlington NHS Foundation Trust Clinical strategy FT member events April 2011.
Transforming Services Media briefing Northumberland, Tyne and Wear NHS Foundation Trust.
City and Hackney Commissioning Strategy Plan 2012/13 – 2015/16 Date: 5 th December2011 City and Hackney CCG.
Supporting people in Dorset to lead healthier lives Commissioning the Dorset Community Persistent Pain Management Service Why is it so Painful to Commission.
Fylde Coast Integrated Diabetes Care
Transforming health and social care in East Sussex East Sussex Better Together.
Psychological therapies – Penrith, Cumbria Alan Cohen FRCGP Senior Primary Care Advisor.
September 5 th – 8 th 2013 Nottingham Conference Centre, United Kingdom
The West Cheshire Way Be part of the conversation.. Alison Lee Chief Officer West Cheshire Clinical Commissioning Group Making sure you get the healthcare.
Jan Hull Acting Director of Development
Patient Empowerment in Chronic Obstructive Pulmonary Disease (COPD) Noreen Baxter Respiratory Nurse Specialist May 2005.
The importance of musculoskeletal health problems Up to 30% of all GP consultations relate to musculoskeletal problems, and this area accounts for a £230m.
Managing depression in people with long term conditions Chris Dickens Professor of Psychological Medicine Peninsula College of Medicine and Dentistry.
Together we’re better Working in partnership with our patients, communities & GP member practices to continually improve quality of care & to support people.
Bromley Clinical Commissioning Group (CCG) ‘The role of Bromley CCG in meeting the health needs of children and young people and their families’. Presented.
Integrated care in Trafford: progress to date November 2011 © Nuffield Trust.
1 Integration to avoid hospital admission: ITHAcA Sarah Purdy on behalf of the HIT.
Perinatal Mental Health HIT IMPROVE (Improving Mental Health Perinatally through Research and Education) Implementing evidence; generating evidence.
Copyright 2011 Right Care The Accountable Integrated Care System Sept 2011 Commissioning for Value.
Telehealth: benefits for primary care Shahid Ali GP & National Clinical Lead Commissioning intelligence Clinical Lead Primary Care NHS Yorkshire and Humber.
Management and Care of Offenders with Learning Disabilities Kate Davies OBE Head of Public Health, Armed Forces and their Families & Health & Justice 7.
Satbinder Sanghera, Director of Partnerships and Governance
Improving Access to Musculoskeletal Services: A New Model of Care Ian Holding Senior Lecturer Musculoskeletal Medicine, Otago BSc, MBBCh, FRNZCGP, Dip.
THE CHOICES AND SOLUTIONS SEMINAR
Better Health and Sustainable Healthcare for Bristol Bristol Clinical Commissioning Group Dr Martin Jones Chair Bristol CCG.
Improving care for people with intellectual disabilities across the life span The ACI Intellectual Disability Network: Maxine Andersson Agency for Clinical.
Dr Caroline Gamlin Director of Public Health NHS Somerset World Class Commissioning.
Developing a Referral Management Plan. Background Hospital referral rates in England have increased significantly over recent years, resulting in the.
A New Musculoskeletal Pathway Vision or Reality ? Sarah L Mitchell, Rehabilitation Programme Manager, Scottish Government June Wylie, AHP Professional.
COPD Patient and carers Therapies inc pulm rehab Intermediate care team Social Worker Respiratory Physician EAW/General Physician Case manager/ Community.
Developing Quality Indicators & Dashboards for Dementia Adam Cook South East Coast Quality Observatory.
Urgent Care Programme Board- Community Pharmacy Pilot. Kent LPC-Working in Partnership with Eastern And Coastal Kent PCT.
Primary Care Strategy An Emerging Transformation Agenda.
National AHP MSK Programme Building Blocks Creating capacity NHS24 MSK Hubs Data for improvement/4 week wait Electronic diaries Sustainable Pathways MSK.
Discharge Pathway Project Girish Kunigiri Fabida Noushad Mohammed Abbas Colin Gell Sarah Cassie Ayesha Ahmed Terri Eynon.
QIPP initiative analysis: summary by PCT by type – shown cumulatively for impact on gap.
Linda Devereux Associate Director Merseyside and Cheshire Cancer Network - why we are here and what’s next!
Islington Additional Needs and Disability Service (IANDS) - Therapies Sally Fraser: Clinical Lead Speech & Language Therapist in Mainstream Schools Shonali.
Establishing a 24/7 acute primary care visiting service Improving primary urgent care.
5 Ways to achieve parity in mental health Karen Turner Director of Mental Health, NHS England 9 th December.
Five Year Forward View: Personal Health Budgets and Integrated Personal Commissioning Jess Harris January 2016.
HTA Efficient Study Designs Peter Davidson Head of HTA at NETSCC.
Challenging Dementia in Brent Dr Etheldreda Kong Panel: Improving early diagnosis 25 th October 2013.
Mackay HealthPathways. Common problems within our local health service Long wait lists Poor communication between Specialist and GPs Inadequate information.
NHS West Kent Clinical Commissioning Group West Kent Urgent Care DRAFT Strategy Delivering a safe and sustainable urgent care system by
Opportunities in 2012 and Beyond The Way Forward Stuart Semple Director of Pharmacy and Medicines Management Barts Health NHS Trust.
Creating an Extended Primary Care Team (EPCT) South Hampshire Vanguard Multi-specialty Community Provider.
Herefordshire CCG Putting the patient at the heart of everything we do1 More information can be found at
Aspiring to Clinical Excellence: Our Journey so far
100 years of living science Chronic disease management in primary care: lessons to be learnt Dr Shamini Gnani November 2007, Mauritius.
Head and Neck Cancer Rehabilitation in the Community Samantha Tordesillas South East London Community Head and Neck Cancer Team.
South Worcestershire Clinical Commissioning Group Redesigning Mental Health Services July 18 th 2012.
South West Hepatitis C Needs Assessment Dr Maya Gobin Health Protection Services (South West)
The Eating Disorders The eating disorders (anorexia nervosa, bulimia nervosa, binge eating disorder and eating disorder not otherwise specified (EDNOS))
The Enhanced Continence Project – In Practice Tina Bryant – Operations Manager Sarah Thompson – Community Nurse Specialist.
Pharmacy White Paper Building on Strengths Delivering the Future Overview.
Powys teaching Health Board: Laying the Foundations for Good Health Our approach to delivering prudent healthcare By engaging with our population, and.
A clinically led programme: 5 hospitals 5 Clinical Commissioning Groups 2 PCT Clusters Aim: Improve health services and ensure they have a long term future.
Integrated Pain Management HIT Aims: To provide a fully integrated, multidisciplinary, life span clinical service for chronic pain that brings together.
Our five year plan to improve local health and care services.
Our five year plan to improve local health and care services
Working with the Voluntary Sector in North East Essex
North East London (NEL): Mental Health Crisis Care
Specialised Commissioning Improving specialised services for severe intestinal failure adult patients What will this mean for you?
Dr Steve Kell Larwood Health Partnership
Integration to avoid hospital admission: ITHAcA
The Comprehensive Model for Personalised Care
Presentation transcript:

Integrated Pain Management HIT To provide a fully integrated, multidisciplinary, life span clinical service for chronic pain that brings together senior clinicians, researchers and local and national health commissioners with service users across Bristol and Bath

The Problem  Over 5 million people/year in the UK develop chronic pain and only two-thirds recover. 11% of adults and 8% of children report chronic pain: ~8m people in the UK  Common causes include musculoskeletal and neuropathic (diabetes mellitus, cancer and HIV) both of which are increasing in prevalence  Chronic pain is hugely detrimental to an individual’s quality of life and places an enormous emotional and financial burden on patients, carers and society  Over 25% of people with chronic pain lose their jobs within 5 years of diagnosis  Chronic pain costs >£15 billion/year in the UK of which £4 billion is attributable to childhood pain  Current drug treatments are largely inadequate and there is a huge unmet clinical need. Existing treatments need to be optimally used  More effective long-term therapies are urgently required

Aims of the HIT  Focus on improvements in performance, productivity and efficiency  Simplified and integrated pathways for the major causes of chronic pain  Service users will be given evidence based and cost-effective interventions at the correct time, in the right setting and by practitioners with appropriate expertise  Ensure that our multidisciplinary research programmes and international expertise in the management of chronic pain are fully integrated into the clinical services  A reduction in health and social costs  Generation of novel evidence based interventions that will inform future changes in clinical practice  Setup an interdisciplinary rotational training and education programme across all of our centres  Improve the uniformity of clinical services  Train the next generation of clinicians who will deliver our pain services  All work will be informed by existing and new public and patient involvement initiatives

Current Challenges  Generate an integrated regional chronic pain pathway that optimally delivers cost-effective clinical care  Stop patients “bouncing” around the system  Fewer patients will be inappropriately seen in secondary or tertiary care  A system-wide reconfiguration is complex and there are significant difficulties in addressing issues relating to demand, capacity and tariff  Pilot “one-stop shop” for chronic pain assessment  Integrated assessment by a physiotherapist, pain consultant and psychologist  Sited in a primary or secondary care setting  Generate a clear management/treatment plan for patient and GP  Only a minority of patients then need to be seen in a specialist secondary care settings  Evaluate patient satisfaction and cost-effectiveness (decreased utilisation of healthcare resources) compared to treatment as usual (TAU) in a similar population e.g. MATS

 The CCGs were supportive of the pilot but had concerns:  How the required data for evaluation on healthcare usage would be obtained (and by whom) for the control group  Given the very long waiting lists, patients in the control group may not be seen by each relevant service within the timeframe of the pilot  How would a one-stop assessment clinic be rolled out as a commissioned service, given the very long waiting lists at NBT and UHBristol with no capacity in the system  The closure of the spinal pathway has exacerbated issues of demand and capacity  The CCGs are currently considering how to reduce:  New referrals to secondary care  Use a standard proforma which would allow triage of some referrals. Reluctance to give this to GPs for completion due to consultation time pressures  Follow-ups in secondary care  Decreased usage of pain management interventions that are less well evidenced (e.g. acupuncture and facet joint injections) Problems