Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1.

Slides:



Advertisements
Similar presentations
Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.
Advertisements

Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.
Analette Ochoa, P.E., QSD/P, ToR, WRECO May 22, 2013.
15 March 2012 WATERSHED Science & Engineering WEST Consultants.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 1 Riverside County - Orange County.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Kirkland 2035 Plan Update Summary of EIS Alternatives Transportation Commission – September 25, 2014.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Examples for Mitigation Category 1 and 2 Streams.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
Wareham Fire District Water Department Glen Charlie Road Water Storage Tank Special District Meeting June 23, 2009.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Comprehensive Basinwide Protection Recommendations 13 Primary Principals: 1.Serve as framework moving forward 2.Establish acceptable levels of protection.
Marin County Watershed Stewardship Plan
Ross Valley Flood Control and Watershed Program Marin County Flood Control and Water Conservation District ~ Flood Control Zone 9 ~ Marin County Department.
Integration Of Stormwater Master Plans with Watershed Plans The Link between Flooding and Development September 23, 2008 Bob Murdock, P.E., CFM.
Feasibility of Aquifer Storage and Recovery in the Upper Colorado River Basin Presented by: Western Water & Land, Inc. Grand Junction, Colorado.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Watershed Stewardship Program Marin County Watershed Stewardship Plan Marin County Department of Public Works.
Comprehensive Flood Hazard Management Plan PUBLIC MEETINGS April 5-7, 2010 Rochester, Montesano, and Chehalis.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
SFEP/EPA Proposal Background- prior NBWA grant EPA Funds and Process SFEP Process EPA Approval and Schedule NBWA Proposal-$1.5 Million Other Funds.
MS4 APPLICATION PROCESS Mark Fife Water Bureau Water Bureau Permits Section Permits Section.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Lake Ballinger and McAleer Creek Watershed Strategic Action Plan Forum Briefing #2 January 27, 2009.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Campus Storm Water Proposal A Storm Water Solutions Project.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
Planning Commission Study Session: Preferred Plan July 23, 2015.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
English Bayou Basin Storm Water Master Plan Presentation to Calcasieu Parish Police Jury Lake Charles April 29, 2010.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
ND Downstream Watersheds Comprehensive Detention Planning
Bow Basin Watershed Management Plan Revised Terms of Reference
City of Appleton Stormwater Management Update Presented to the
Memorial Park Detention Basin Project
Planning Commission Hearing
by John Anderson, Martin Bermudez, and Megan Jordan
Measure A Financial Oversight Committee August 7, 2013
MPO School Transportation Working Group
Water Quality Protection Zones
Long Range Facilities Plan
FEMA and Stream Restoration
Alternative Compliance for New Developments
URBAN TRAIL PROJECT UPDATES
Technical Advisory Committee
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
Presentation transcript:

Ross Valley Flood Protection and Watershed Program Flood Zone 9 Advisory Board April 16, 2015 Flow Reduction Study Preliminary Results 1

This presentation… » Flow Reduction Study Process »Findings of Site Evaluation »Proposed Program Alternatives 2

Overview of Process to Date »Review of previous selection of detention basins »Developed revised criteria »Identified 29 potential alternative flow reduction elements »Applied criteria to elements 3

Reminder: Original Criteria Used To Evaluate Detention Basins »Is in close proximity to Corte Madera Creek or a major tributary of Corte Madera Creek. »Has the ability to reduce flooding at key flow breakout points along the creeks in Fairfax, San Anselmo, and Ross. » Is open lands with few existing structures » Has a current use that is compatible with storm water detention. » Is publicly owned. 4

5 Original Detention Basins Selected »Phoenix Lake »Loma Alta »Lefty Gomez »Memorial Park »Red Hill Park 5

Ross Valley Flow Reduction Criteria -15 Criteria – 5 Categories (Details in Table 1) »A. Reduce Flooding Potential »B. Protect Environment »C. Optimize Costs and Benefits »D. Gain Public Acceptance »E. Optimize Schedule 6

Proposed Category Weighting »A. Reduce Flooding Potential – Critical Success of Project (5) »B. Protect Environment – Very Important to Success of Project (4) »C. Optimize Costs and Benefits – Very Important to Consider (3) »D. Gain Public Acceptance – Very Important to Consider (3) »E. Optimize Schedule - Important to Consider (2) 7

Refreshed List of Flood Control Alternatives (Table 2) »Detention Basins  5 Original Recommended Basins (Phoenix, Lefty Gomez, Loma Alta, Memorial Park, Red Hill Park)  14 Additional Detention Basin sites – See Map »Other Elements  Creek Widening  Bypass Channels  Setback Levees  Utilize Surface Streets as Shallow Channels  Removal of Flood Prone Properties  Flood Proofing  Implement LID Measures 8

9

10

Fatal Flaw Analysis – 3 Sites Eliminated Fatal Flaw Criteria »A3. Avoid Flooding Downstream  Potential to Increase Flow Downstream »B3. Increase Ability to Obtain Permits  (In)Ability to Gain Permit Approvals »D1. Maximize Public Acceptance  Public Safety – potential to trap people. Eliminated Sites U. Detention Facilities on Cascade Creek K. Underground Parking Detention. W2. Marin Town Country Club (Cistern) W3. Marin Town Country Club (Underground parking) 11

Site Evaluation Summary – Top 10 Sites (Details in Table 2) 1.Phoenix Lake (710) 2.Memorial Park (620) 3.Deer Park (611) 4.Nursery near Baywood Canyon Dr. (611) 5.Bothin Park Youth Center (581) 6.San Domenico School/Upstream (580) 7.Lefty Gomez (573) 8.Marin Town and Country Club Detention Pond (572) 9.Red Hill Park (569) 10.Hidden Valley (568) 12

Developing Program Alternatives Group highest ranked elements in various combinations that: 1.Are anticipated to meet flow targets throughout the basin (Shown on Figure 2) 2.Distribute flow detention upstream of key flooding locations throughout the watershed 3.Include a range of the top ranked detention basin sites. 13

Three Program Alternatives »1 - The Highest Ranking Elements (based on individual element scores) »2 – The San Anselmo Option (compare flood protection for Sleepy Hollow Creek vs. Sorich Creek, Alternative 1 vs. Alternative 2) »3 – Most Environmentally Friendly (no detention basins in protected spaces or reserves) 15

Next Steps »Continue to invite public comments »Hydraulic modeling of the three alternatives »Reconfiguring of the alternatives to optimize performance »Prepare conceptual plans and cost estimates for new elements »Comparison of alternatives to existing Program 17

Schedule DeliverableTWG Presentation Date AB Presentation Date Selection criteria, weighting factors, and list of Flow Reduction Elements being considered. February 26, 2015 March 17, 2015 Results of applying fatal flaw criteria to Flow Reduction Elements; group surviving elements into Alternatives March 26, 2015 TODAY- April 16, 2015 Analyze and apply criteria to Alternatives, and rank them MayNo Presentation Report with recommendations, conceptual plans, and cost estimates. No Presentation June 18

Questions? 19