URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.

Slides:



Advertisements
Similar presentations
Florida Public Service Commission 2007 Hurricane Preparedness Briefing May 23, 2007 Kissimmee Utility Authority Ken Davis Vice President Engineering &
Advertisements

APS Underground Distribution Cable Replacement Project
BACKGROUND: We are finding an increase in instances where the available fault current at underground (UG) 1-phase residential service entrance equipment.
FORT COLLINS ELECTRIC UTILITY IEEE APRIL 28, 2009.
Underground Cable – Replacement & Rejuvenation Presented by John Gilkey May 7, 2009.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
South Portion of Reroute North Portion of Reroute.
Network Management on the Isles of Scilly Ben Godfrey Western Power Distribution Innovation and Low Carbon Networks Engineer /
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Major Underground Design John Perez. Underground Engineering Design Practices Three Phase Circuit –Infrastructure: Ductbanks & Manholes All three phase.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Section 2.6 Question 1. Section 2.6 Answer 1 Section 2.6 Question 2.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
ENERGY SOURCES. ALTERNATIVE ENERGY SOURCES Geothermal Energy comfort… savings... environment.
Mark Kempic President Columbia Gas of Maryland, Inc. Maryland-District of Columbia Utilities Association Fall Conference Fueling the Economic Engine.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
©2006 CenterPoint Energy Proprietary May Version 1 1 Distribution Project Management Project Overview SWEDE Conference San Antonio, Texas May 11,2007.
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
IMPACT AID - SECTION 8002 Payments Relating to Federal Acquisitions of Real Property.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
2014 Budget Department Presentations Infrastructure Funding Options.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Subtransmission Reliability Criteria
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
APPLIED ELECTRICITY SS3
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
Lyndonville Electric Department Feasibility Analysis Review December 2,
Cable Rehabilitation Program By Lee Maurer Maintenance Planning SWEDE Conference April 26, Bastrop, Tx (Second Responder Cable Treatment Program)
New Service Delivery Presented by Milton Russell.
Cable Rehabilitation at Oncor by Richie Harp – Distribution Standards Data provided by Mark Darilek – Maintenance Planning SWEDE 2009 – Tulsa, OK – Thursday,
Santee Cooper Encouraging Energy Efficiency APPA National Conference June 15, 2009.
Distribution Project/Program Management Don Stanton, PMP SWEDE Conference May 10, 2007.
LIOB Meeting June 7, 2006 Southwest Gas Corporation CaliforniaLow-Income Assistance Programs Overview.
Oncor Electric Delivery Study on Residential Electric Vehicle Charging SWEDE Conference 2012 Ron Shipman.
Incremental State Assessment Surcharge (Section 18-a Surcharge) Fall 2009 Customer Meetings.
Delivering a Free Interactive Mapping Application for Field Locator Use Presented by Stephen W. Adams – Manager, Geospatial Services Tim Hoeflich – GIS.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Roadway Median Tree Program Public Works Department July 13, 2015.
1 We Train the World Air Force Financial Update to SC70 Air Force Security Assistance Training Mr. Rick Jellison Director of Financial Management.
2006 Hurricane Preparedness June 5, 2006 Sumter Electric Cooperative, Inc R. Ben Brickhouse: Director of Engineering & IT John J. LaSelva: Director of.
Energy Efficiency Update Before the Senate Energy, Utilities & Communications Committee Part 2 May 17, 2011 – State Capitol Robin Smutny-Jones Assistant.
2014 Hurricane Season Preparedness Briefing Jorge Puentes Technical Projects Manager – Northeast and Northwest Divisions March 26, 2014.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
May 12, 2006 District Engineer Presentation1 Signing Performance Measures Report 2005 Data.
Enterprise Resource Program Update and Decision Point M.L. Norton – General Manager – Centralia City Light August 11, 2015.
Submission on the draft ODV Handbook WEL Networks 14 th April 2004.
Interest Free Energy Efficiency Loan Program Proposal for Improvements August 15, 2016.
Fall River Electric Infrastructure in Island Park Bryan Case, CEO.
Pasadena Water and Power Final Projects for Completion of Underground Utility Program City Council March 14, 2016 Item 16.
2017 Mid Year Meeting Denver, CO
Utility Needs and Smart Grid for Major Storm Events
CLIC Civil Engineering & Infrastructure Working Group Meeting
35kV Assessment SWEDE 2007 May 10, 2007.
Information Technology Department
Circuits Electrical Wiring.
Rehabilitation Program impact on Sewer Management
Presented by: Keith Gray & Julienne Sugarek CenterPoint Energy
City of Lebanon, Missouri Electric Department
Distribution Circuit Automation Scheme Design
Insert date.
Michigan Energy Summit | April 25, 2019
Presentation transcript:

URD Cable Rehabilitation Program SWEDE 2009 Tulsa, OK May 7, 2009 B. Shawn Cobb, P.E.

2 Presentation Objective   Update on URD System Performance   URD System History   URD System & Performance Statistics   Current Status   Action Plan   Answer Questions

3 What is a URD System?   Underground Residential Distribution   Single-phase underground electric distribution system   Provides electric service to residential customers in subdivisions   Typically utilizes a loop feed design (two sources) feeding many sections of cables in between transformers

4 URD System History   1939 – Earliest URD system in Danvers Subdivision   1964 – Installed first direct-buried URD systems   1984 – Initiated a cable replacement program based on failure rate   1986 – Began installing cable in conduit for new URD primary cable installations   1993 – Cable injection was introduced for 13kV cables   1999 – Cable injection was developed for 35 kV cables

5 URD System & Performance Statistics

6 Direct-buried URD   The total amount of direct-buried URD cable installed between 1964 and 1986 is 1,628 miles   The oldest remaining direct-buried cable is 38 years old   Direct-buried URD cable was not performing well (high failure rates), so a cable rehabilitation program was initiated in 1984.

7 URD Direct-buried Cable

8

9

10 URD Direct-buried Cable

11 URD Direct-buried Cable

12 URD Direct-buried Cable

13 URD Direct-buried System Failures

14 URD Direct-buried System Failures

15 URD Direct-buried System Failures

16 URD Direct-buried System Failures

17 URD Direct-buried System Failures

18 URD Direct-buried System Failures

19 URD Direct-buried System Failures

20 URD Direct-buried System Failures

21 URD Direct-buried System Failures

22 URD Direct-buried System Failures

23 URD Direct-buried System Failures

24   Through the Cable Rehabilitation Program, we have replaced 884 miles of direct-buried cable with cable in conduit and have injected 251 miles with the injection process. This leaves us with 493 miles of direct-buried cable that still need to be addressed.   The current contractor cost to replace direct-buried cable with cable in conduit is $160,000 per mile.   The current cost for cable injection is $75,000 per mile. Current Status

25   With an annual budget of $4.5 Million, the recommendation is to continue replacing direct-buried cable with cable in conduit and injecting cable with silicon. The proposed plan is to replace 15 miles with cable in conduit and to inject 30 miles. 1. This recommendation will maximize the use of our annual budget. 2. Cable injection will address and reduce our cable failure rate. 3. Cable replacement will address and reduce transformer failures. 4. Injection contractor has one full time crew which maximizes their efficiency and productivity by injecting 30 miles of direct-buried cable per year. Action Plan

26   At a rate of 45 miles per year, it will take approximately 11 years to rehabilitate all of the remaining direct buried cable. At the completion of the program, there will be about 390 miles of injected cables. The remainder will be cable in conduit.   The recommendation was not based solely on financial calculations. The cable replacement also addresses the transformers, while the cable injection process does not. Proposed Plan (cont)

27 Questions?