TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.

Slides:



Advertisements
Similar presentations
CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
Advertisements

Ed Seidel Assistant Director Directorate for Mathematical and Physical Sciences National Science Foundation October 1, 2010.
Geminis Future AO Program A Decade of AO Evolution at Gemini Recent AO Program Highlights Doug Simons Gemini Observatory.
Subaru AO in future. Outline Overview of AO systems at Mauna Kea and in the world. Ongoing plan of AOS at Subaru and Mauna Kea. What’s in future.
The Adaptive Optics Lucky Imager High-resolution imaging in the visible on large ground-based telescopes Jonathan Crass Institute of Astronomy, University.
RASC, Victoria, 1/08/06 The Future of Adaptive Optics Instrumentation David Andersen HIA.
Introduction to the Center for Adaptive Optics Winter 2003.
Mauna Kea. The Gemini Project Who: An international partnership of the United States, United Kingdom, Canada, Chile, Argentina, Brazil and Australia.
Philip Diamond RadioNet Co-ordinator University of Manchester Jodrell Bank Observatory.
Canadian Virtual Observatory Project David Schade Canadian Astronomy Data Centre Herzberg Institute for Astrophysics National Research Council Canada.
MACQUARIE UNIVERSITY, DEPARTMENT OF PHYSICS RESEARCH – ASTRONOMY & ASTROPHYSICS CORE Astronomy and astrophysics research has grown rapidly at Macquarie.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
Planning for the Virtual Observatory Tara Murphy … with input from other Aus-VO members …
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
David Schade Canadian Astronomy Data Centre Data Services Curation Practice and User Metrics.
Telescopes. Close your eyes. Create a picture in your mind of a telescope. Think about: What does a telescope look like?
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with ALMA.
[79.03] The Thirty Meter Telescope (TMT) Project Gary H Sanders for the TMT Project Partnership AAS 205th Meeting, San Diego Providing Access to U.S. Astronomers.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
Computing in Atmospheric Sciences Workshop: 2003 Challenges of Cyberinfrastructure Alan Blatecky Executive Director San Diego Supercomputer Center.
An Astronomer’s View of Optical Turbulence The characterization, understanding and use of an astronomical site of an astronomical site is a challenging.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Open Science Grid For CI-Days Internet2: Fall Member Meeting, 2007 John McGee – OSG Engagement Manager Renaissance Computing Institute.
NANSLO Environmental Scan Definition and Preliminary Findings 1.
U NIVERSITY of C ALIFORNIA O BSERVATORIES LICK · KECK · TMT University of California Observatories Director: Michael Bolte (UCSC) Associate Director: Ian.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
Spitzer Space Telescope Lisa Storrie-Lombardi Spitzer Science Center, Manager & Asst. Director for Community Affairs Implementing Portals of the Universe:
Markus Dolensky, ESO Technical Lead The AVO Project Overview & Context ASTRO-WISE ((G)A)VO Meeting, Groningen, 06-May-2004 A number of slides are based.
Open Science Grid For CI-Days Elizabeth City State University Jan-2008 John McGee – OSG Engagement Manager Manager, Cyberinfrastructure.
1 The LOFT group Who we are Where we came from Where we are going Large Optics Fabrication and Testing ?
Viewing the Universe through distorted lenses: Adaptive optics in astronomy Steven Beckwith Space Telescope Science Institute & JHU.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
An I3 funded by the EU through FP6 Alastair G Gunn University of Manchester Jodrell Bank Observatory OPTICON BOARD MEETING – 11 th /12 th October 2004,
Canadian Virtual Observatory David Schade Canadian Astronomy Data Centre Pat Dowler, Daniel Durand, Luc Simard, Norm Hill, Severin Gaudet.
Astroparticle physics
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
IRIS OIWFS Concept Study D. Loop1, M. Fletcher1, V. Reshetov1, R
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
Future Plan of Subaru Adaptive Optics
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
Suggested Subaru-NAOJ/Princeton Consortium: Overview Michael Strauss, Ed Turner, Jim Gunn January 25, 2007.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
A Brief Overview Andrew K. Bjerring President and CEO.
1 Computing Challenges for the Square Kilometre Array Mathai Joseph & Harrick Vin Tata Research Development & Design Centre Pune, India CHEP Mumbai 16.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
EURO-VO Structure Data Centre Alliance (DCA) A collaborative and operational network of European data centres who, by the uptake of new VO technologies.
Introduction of RAVEN Internal meeting on future instrument projects at Subaru Shin Oya ( Subaru Telescope/NAOJ) ‏ Hilo.
3 December 2015 Examples of partnerships and collaborations from the Internet2 experience Interworking2004 Ottawa, Canada Heather Boyles, Internet2
Keck Observatory in the TMT Era Keck Strategic Planning meeting September 18, 2009.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
AO4ELT, Paris A Split LGS/NGS Atmospheric Tomography for MCAO and MOAO on ELTs Luc Gilles and Brent Ellerbroek Thirty Meter Telescope Observatory.
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
FP6 and research infrastructures Main instruments Integrated infrastructure initiative (I3), several M€/year, 4-5 years communication network development,
Data Centres in the Virtual Observatory Age
Upcoming Facilities of IIA
Answers to questions about Canadian astronomy from Iwata-san
Telescopes.
Theme 2 AO for Extremely Large Telescopes
Welcome to the 4th NAIC-NRAO School on Single Dish Radio Astronomy
EVLA Operations Jim Ulvestad
Scientific Potential Current Design Efforts Complementarity with JWST
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010

Canadian Astronomy Community 21 universities across Canada (ACURA) –Most of the Canadian astronomers –Instrumentation research / labs at several locations National laboratory in Victoria/Penticton, BC (NRC-HIA) –Administration of the national observatories –Scientific staff –Instrumentation group (ATRG) –Data archiving centre (CADC) Industrial partners across Canada Decadal Long Range Plan for Astronomy (LRP2010) to be released this fall (CASCA) – LRP2000 just ending

ACURA Instrumentation Association of Canadian Universities for Research in Astronomy (ACURA) Examples of Canadian university instrumentation labs –CRAQ/LAE (Montreal, Laval, McGill) Gemini GPi, JWST FGS, CFHT Sitelle & Spirou studies –ISIS (Calgary, Lethbridge, Alberta) prepSKA, Herschel, Scuba-2 –UBC Instrumentation NFIRAOS sodium layer LIDAR, MOST, Arctic site testing –U Toronto Dunlap Institute NFIRAOS NSCU, Gemini F2T2 etalon –U Waterloo Instrumentation Scuba-2, CCAT, FIRI –University of Victoria Adaptive Optics Laboratory AO test bench, Raven MOAO demonstrator for Subaru

HIA Instrumentation Herzberg Institute of Astrophysics (HIA) is the national lab –Government mandate, base funding, strong community support Astronomy Technology Research Group – Victoria (ATRG-V), 48 staff –TMT instrumentation management, system engineering, telescope structure and enclosure management –TMT NFIRAOS facility AO, IRMOS, WFOS, & IRIS OIWFS –ALMA Band 3 cryogenic receivers –Gemini GPI, GMOS-N upgrade, CFHT `Imaka GLAO Astronomy Technology Research Group – Penticton (ATRG-P), 20 staff –TMT NFIRAOS real time controller (RTC) –EVLA correlator, SKA PrepSKA, composite antennas, feeds, correlator/beam forming Canadian Astronomy Data Centre (CADC), 20 staff –HST, Gemini, CFHT, JCMT data management –Canadian Virtual Observatory (CVO)

HIA Strengths Key strengths, –Multidisciplinary technical and science expertise –Co-located with strong science researchers –Efficient matrix structure –Systems engineering, project management –Continuity, institutional ‘memory’ –Collaboration expertise, international reputation –Strong university and industry engagement International Peer Review Committee (2009) comments, ‘HIA ranks among the best in the world in astronomy technology and development for existing and future telescopes’

TMT Instrumentation Interests Systems engineering & integration AO algorithms, tomography, PSF reconstruction Precision opto-mechanics, software, integration Real time control (RTC) hardware, firmware & software Advanced wavefront sensors & deformable mirrors High contrast imaging / Wide field imaging Spectrographs, IFUs, echelle, high res, multi-object Observation data management

Future Instrumentation Astronomy instruments have evolved –from $2 - 5 million complexity with year time frames –to $ million complexity and year time frames ! Future instruments will be characterized by collaborative efforts of large teams from multiple partners Instrument development funding model varies for different observatories and partners The community needs to build capacity of the key ingredients –Instrument scientists >> developing science ideas –Technology researchers >> developing technology ideas –Development capacity >> from ideas to on-sky science

Conclusion There is no lack of ambitions in the Canadian astronomy community for the next decade “How we plan to get there” is as important as the list of exciting science, observatories, and instrumentation. Canada, with its instrumentation capacity, is positioned to maintain its focus on international astronomy infrastructure and transformational science instruments for the next decades.