Project “Sea and Air Container Track and Trace Technologies: Analysis and Case Studies” TPT 01/2002T DRAFT FINAL REPORT.

Slides:



Advertisements
Similar presentations
Public Workshop Welcome -to the -. What is the ?
Advertisements

Towards An ‘Electronic Trading Platform’ March 18, 2006 Pakistan Electronic Trading (PAKET) Network Mohammed Imani Executive Director Sidat Hyder Morshed.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
Non-Tariff Barriers in the Trade of Transport Services – Final Report TPT 02/2002T Steering Committee on More Competitive Transportation (including infrastructure)
Africa's Accelerated Industrial Development Action Plan “AIDA” AFRICAN UNION COMMISSION Department of Trade and Industry By Hussein Hassan Hussein Head.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
Dubai Government Policies for Enhancing the Competitiveness of Multimodal Transportation and Logistics Cluster June 2014.
GTM for Product Leaders Project Overview A project that guides product leaders and their teams in developing a successful go-to-market strategy.
APEC Second Air Cargo Security Workshop Summary Report
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
Internal Auditing and Outsourcing
Odette – Technology Committee Odette International Ltd.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Carbon Footprint Proposal: Developing a Common Methodology for Ocean-Going Vessels Angelina Ermakov Canada 44 th APEC Energy Working Group Washington,
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
APEC-TPT Intermodal & ITS Group Action Plan (Proposed Format) May 2006 (updated – Ha Noi) CONGESTION AHEAD.
Experiences and lessons learned from the TNA of China WANG Can Tsinghua University, China UNFCCC workshop on Technology Needs Assessments Bonn, Germany.
HND Social Services Sector Briefing Session 23rd March 2007.
Campaign Readiness Project Overview Enabling a structured, scalable approach to customer-centric campaigns.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Certification & Training Assessment Group History & Current Activity North Central Region Pesticide Education & Certification Workshop June 2002.
Industrial Control Security & Access Control Facilities Management UNECE International Forum on Trade Facilitation Geneva, Switzerland May
Action Plan Intermodal & ITS Experts Group June 2011 Update.
TPT-WG35 20–24 February 2012 Bangkok, Thailand Project Proposal : Cargo preference and Restrictions Applying to Specific Trades Speaker: MLTM Economy:
Eccles Housing Market Report Community Committee Meeting 25 th January 2005 Shahla Zandi Strategy and Planning (Partnerships and Planning)
Roadmap to Bogor Goals Industry Report Roadmap Taskforce – Australia, Brunei Darussalam and Singapore.
Michael Yakushev, cctld.ru Board Member.  WHOIS existed before ICANN (1982-)  Review of WHOIS Policy is prescribed by AoC (2009)  Review Team was formed.
___________________________________________________________________________ 2008/TPTWG30/IEG/01 Agenda Item: 7.0 Action Plan for the Intermodal & ITS Experts.
Compendium of Best Practices and Benefits of National Logistics Associations in Selected APEC Economies AusAID-Funded Project Update Australia Economy:
The Road Transport harmonisation Project Group (RTHP) 21 st APEC TRANSPORTATION WORKING GROUP MEETING RTHP Phase 5 Stage 3 Workshop 24, September,2002.
Using Guidelines: The Need for Adaptation Ian D Graham, PhD, FCAHS December 10, 2012 E-GAPPS.
UN CEFACT Single Window Recommendation Simplifying International Trade Gordon Cragge Chair – International Trade Procedures Working Group (TBG 15 of UN.
EGNRET Projects Cary Bloyd EGNRET 27 Zhuhai, China 9-11 October 2006.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Security Monitoring Model and Network for Regional Supply Chain with a particular focus on food security Kevin Lu P.R. China 33rd APEC Transportation Working.
Supporting Industry Change Planning: Risk & Milestone Assessment Process & Tools 07/07/2014.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
BMH CLINICAL GUIDELINES IN EUROPE. OUTLINE Background to the project Objectives The AGREE Instrument: validation process and results Outcomes.
APEC TPT Busan September 2, 2003 Michael Wolfe New Cargo Security Project: Enhancing Secure Trade and Efficiency in the APEC Region with.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Greening the Trade Corridors in North America: Why Corridors and Why Green? Benjamin Teitelbaum CEC, April 22 nd.
Module V: Writing Your Sustainability Plan Cheri Hayes Consultant to Nebraska Lifespan Respite Statewide Sustainability Workshop June 23-24, 2015 © 2011.
SEA in the Czech Republic Prague, 24 September 2008.
1 Liberalisation of Air Services in the APEC Region Australia Richard Wood Department of Transport and Regional services.
United States-Canada Regulatory Cooperation Council TBWG Fall Plenary November,
PCS : PORT COMMUNITY SYSTEM Container Shipping Lines Association
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Progress Report to the 28 th APEC Transportation Working Group Vancouver, Canada 5-8 September 2006 New Methodology on Air Services Liberalisation Analysis.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO STRATEGIC PLAN CAeM Hong Kong, China.
Overview of The APEC Secure Trade Project Sept 2003 Walter Kulyk Chair, ITS Experts Group.
Peter Yuile Australia ELETRONIC COMMERCE IN TRANSPORT.
APEC Action Plan to Liberalisation and Facilitation of Air Services Australia Richard Wood, Department of Transport and Regional Services.
Commissioning Support Programme Market Facilitation 10 July 2012.
1 Two AusAID-funded Projects – NLA Benefits & e-Port Linkages Economy: Australia 35th APEC Transportation Working Group Bangkok, Thailand February 20-24,
Legal Status Task Force Report CWS/4/8, CWS/4 BIS/5 Geneva, Switzerland March 2016 Young-Woo YUN Head, Standards Section.
Update from the United States Standards and Conformity Assessment Work in the Sub Committee on Standards and Conformance.
Logistics Institute StratMos IMG3 Telemark 20 May 2009 Progress and Planning Report DP3c - Applying Logistics Technologies Nick Riley University of Hull.
Presented by Cary Bloyd, U.S. Department of Energy Report to the EWG/EGEEC February
Stages of Research and Development
Roadmap to Enhanced Technical Regulations of WMO
Supply Chain Management and CRM The Business Network
ATTORNEYS AND SOLICITORS
Deployment of Intelligent Transport Systems Directive 2010/40/EU
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
UNECE International Conference
Capacity Access Review
Presentation transcript:

Project “Sea and Air Container Track and Trace Technologies: Analysis and Case Studies” TPT 01/2002T DRAFT FINAL REPORT

Objective of this Meeting: 1. To discuss a draft final report of the project; 2. To seek comments on the draft from this meeting and after; and 3. To seek endorsement on an approach for the project consultant to meet the 30 June 2004 deadline.

Project Objectives: To analyse the current and planned integration of track and trace technologies, including temperature monitoring systems, across APEC supply chains. To analyse the needs of firms requiring track and trace services and to establish whether different levels of functionality required by different firms are being met by available technologies (or are likely to be met in the future).

Project Objectives: (continued) To showcase the implementation of track and trace technologies in the APEC region through a minimum of three case studies. To evaluate the research and case studies to recommend best practices which will facilitate the uptake of track and trace technologies and improve the visibility, quality and reliability of delivery of product to export markets.

Project Scope Analysis of sea and air container tracking and tracing technology developments in APEC economies; Development of three case studies to examine the application of track and trace technologies and their integration across a supply chain in the APEC region.

Post TPT-WG 22 Progress: A new deadline for a final report: 30 June The draft final report summarises outcomes of research and consultation, a web-based survey, and analysis of three case studies to examine the application of track and trace technologies and their integration across supply chains in the APEC region.

Progress: (continued) Recommendations on best practices - both large-scale and small-scale solutions for track and trace of containers identified. TPT-WG collaborate with current United States work, to ensure technology solutions do not become trade barriers. Project outcomes in collaboration with the Project “Enhancing Secure Trade and Efficiency in the APEC Region with Intelligent Transportation Systems and e- Commerce Technologies”.

Summary of Recommendations Stakeholders should have access to information on the product and container in near real time. Information should be captured and made available electronically: status of the container, documentation, performance in real time and security of the load.

Automated Reading 3 technologies for reading container numbers: Barcode; Radio Frequency ID; and Optical Character Recognition. Recommendations (Cont)

Airline best practice: Automated reading of container numbers (barcode) with handheld readers linked to manifest or other database; Elimination of manual keying of freight data. Recommendations (Cont)

Shipping Best Practice: Machine reading of container numbers with readers linked to manifest or other database. Recommendations (Cont)

Way forward To drive the improvement of Track and Trace: through programmes where commercial trials are exposed to a wide section of the industry.

Summary of Comments on Draft Report - how to improve it - Overview  Current draft below the expectations of the project Request for Proposal.

Summary of Comments on Draft Report - how to improve it - Structure No clear structure and little understanding of end-to- end through chain – the concept of supply chain management - a gist of track and trace technology use (1 st project objective); Track and Trace technology analysis on page 31.

Summary of Comments on Draft Report - how to improve it - Structure. Case studies to be broadened to focus more widely ie beyond single/mode (air/sea) proprietary systems, two of which are exclusively cool chain logger related. Emphasis on the high tech proprietary system not consistent with the body of the report saying there is poor uptake and resistance to electronic track and trace technology.

Summary of Comments on Draft Report - how to improve it - Structure. Good report: a clear structure; project objectives; rationale as per the project Request for Proposal; project in the APEC context and methodology; analysis in alignment with the project objectives; resultant findings; and recommendations; Executive Summary to reflect an abridged gist of the main report.

Summary of Comments on Draft Report - how to improve it - Project Content Suggested more focus on the requirements relating to track and trace functionality for major stakeholder groups: who needs what information; when and in what form to achieve the objectives of trade facilitation, security, quality; how can track and trace technology provide this information; what else could the technology fulfil overall efficiency and cost reduction?

Summary of Comments on Draft Report - how to improve it - Project Content. How will a detailed review of existing and emerging technologies address the above requirements. This is to enable companies and APEC Governments to make some conclusions as to which to endorse and adopt.

Summary of Comments on Draft Report - how to improve it - Project Content. Much mention of Electronic Data Exchange (EDI) but no reference of the potential replacements of EDI such as webservices and ebXML (electronic business extendable mark-up language)

Summary of Comments on Draft Report - how to improve it - Project Content. Canada: more balanced representation of the state-of- play across all APEC members. Canadian applications (Port of Montreal) are not included in the draft. The draft should contain reference to regulation (Canadian and others) for the transport of dangerous goods. The focus should be on how terrorism affects track and trace technologies in APEC economies, not their economies per se.

Summary of Comments on Draft Report - how to improve it - Editorial Requirements The draft: incohesiveness; verbosity; poor grammar; conversational English; ambiguity; unsubstantiated statements; inappropriate sub-headings; acronyms without appropriate references; certain illustrations are too small, thus illegible.

Revised Timeline: April 04 : Draft final report for TPT-WG23, Beijing, China. May 04 : Revisions of the draft to reflect comments from TPT-WG23 and after - written comments to by 7 May June 04 : Revised draft final report for inter- sessional consideration by economies. 30 June 04 : Delivery of final report.