User Centered Design The Process Information Business – UCD Robert Press (718) 248-1540.

Slides:



Advertisements
Similar presentations
Responding to Usability Issues Mary Chant, Certified Usability Analyst
Advertisements

The Business Analyst and the SDLC
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Virtual University - Human Computer Interaction 1 © Imran Hussain | UMT Imran Hussain University of Management and Technology (UMT) Lecture 16 HCI PROCESS.
Designing for Interaction Building a Vision for Innovation in Interaction Design Chris Bernard, User Experience Evangelist, Microsoft This presentation.
NBCUniversal DSR Admin UXD Recap January, 2011 DCS TS and Naviscent 1.
GAI Proprietary Information
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
Center for Development Excellence UX Discovery Case Study and Work Product 1.
02/12/00 E-Business Architecture
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Centers for IBM e-Business Innovation :: Chicago © 2007 IBM Corporation Sample Projects October 2007.
Rational Worldwide Software Symposium
RVP overview 19 kwietnia 2012 mgr inż. Marcin Kłosiński
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Software projects Management & Development Alireza Saebi
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Digital media project 101. The six common major stages 1- Site definition and planning 2- Information architecture 3- Site design 4- Site construction.
Enterprise Architecture
Web Development Process Description
Design h.d.mabuse | Design | Staff | Process | Clients | Cases Created in 1996, C.E.S.A.R gathers a highly qualified team of professionals,
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
K-12 Web Content Development Process
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
UE Approach towards AUBI Design Patterns Adesh Singh 28 May 2008.
CHPT 3 Phase 1: Define The Project. Phase I – Define The Project DiscoveryClarificationPlanning Gathering Info with Client Survey ( redesign.com)
Production Cycle Objectives:  Identifying key phases for building up website  Understanding the major goals and activities of each production process,
International Center for Agricultural Research in the Dry Areas Web strategy ICARDA2.0 :: re-design project 1.
BA Team: Product Ownership, Analysis, and Solution Design BA Bi-Weekly Mini-meeting July 14, Interactive Solutions Delivery Methodology What.
Advancing Government through Collaboration, Education and Action Harnessing Life Events Information Sharing Team.
U.S. Department of Agriculture eGovernment Program Design Approach for usda.gov April 2003.
CSC 480 Software Engineering OOAD Process. Topics Overview: OOAD Process The object model Identifying classes Responsibilities and collaborations Hierarchy:
BA 471 Management Information Systems Process Maturity and Quality.
普 华 永 道 Phase 1: Project Preparation Phase 1: Project Preparation Phase Overview Phase Overview.
Proposal Presentation Prepared by: Condor Technology Solutions, Inc. August 24, 2000.
Audience Analysis & Usability. The Writing Process Focusing and Planning Drafting Assessing & Evaluating Assessing & Editing Publishing and Evaluating.
UK Link Programme Update to PNUNC June 17 th 2013.
Project Methodology May 2, System Development Life Cycle Overview.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Request for Proposal (RFP)
ProStores Redesign Content Strategy Prepared by Ana Varela.
Art 155 Information Architecture In-class Presentation Week 1B.
Machine to Machine Interface Update 1 Machine to Machine Interface Update February 7th, 2007.
J. Scott Hawker p. 1Some material © Rational Corp. Rational Unified Process Overview See and use the RUP Browser on lab machines.
© 2012 Adobe Systems Incorporated. All Rights Reserved. Copyright 2012 Adobe Systems Incorporated. All rights reserved. ® DESIGN PROJECT PRODUCTION PHASES.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Condor Technology Solutions, Inc. Grace Performance Chemicals HRIS Intranet Project.
Proposal Presentation Prepared for Akamai Technologies 19 May 2005.
1 Sky Business Website rebuild. 2 Agenda  Client Brief  Our Approach  Budgets & Timings  Agree next steps.
Enterprise Architectures. Core Concepts Key Learning Points: This chapter will help you to answer the following questions: What are the ADM phase names.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
SAP Methods Context PRM1_02.1 PwC Methods & Risk Management Lesson Objectives Participants will be able to: Understand how methods can mitigate project.
Information Architecture & Design Week 3 Schedule -Syllabus Updates -Group Project Finalized -Research Presentations Finalized -IA Methodologies -Class.
UK Link Programme Update to PNUNC August 13th, 2013
Define phase Interview the client to understand goals, audience, content, design, and delivery requirements. Organize and outline interview information.
Raytheon Parts Management
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Rational Worldwide Software Symposium
Chapter 1 (pages 4-9); Overview of SDLC
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Rational Worldwide Software Symposium
Phases of Designing a Website
Monitor & Control Project
Rational Worldwide Software Symposium
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
Presentation transcript:

User Centered Design The Process Information Business – UCD Robert Press (718)

Successful Website Design -- Interrelated Phase 0 Solution Design Phase 1 Detailed Design as well as customization Brand = promise + delivery

User Centered Design Defined An iterative process of creating multiple work products to drive a complete Phase 0 (Solution Design) and Phase 1 (Detailed Design) –All Solution Design outputs enable Detailed Design and production –Improves upon Waterfall model All work products are dependent upon one another, and are on the critical path to completing the Solution Design. –‘Stakeholder’ approval is required in order to move on to the next step –All Technical and Content Mgmt outputs should be driven by the Creative work stream Stakeholders’ needs and wants are more closely realized at launch because the process is iterative and collaborative UCD process allows a very smooth transition from Solution to Detailed Design and Production

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Creative Outputs: Assess Competitive Site Matrix Brand Value Matrix / User Profiles User Scenarios Design Impressions Usability Testing (if redesign)

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Content Mgmt Outputs: Assess Content Analysis Document Work Flow Analysis Document

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Technical Outputs: Assess Technical Assessment Component Model Architectural Decisions

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Functional Requirements Document

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Creative Outputs: Design Navigation Model Design Studies High Level Content Plan Usability Testing ( Design )

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Content Mgmt Outputs: Design Content Model Content Conversion Plan Document Type Definition

UCD Process High Level DesignAssess Creative Technical Content Mgt JRD + Stakeholder Interviews Ph1 Project Management Business Strategy E-Business Strategy Digital Branding Final Solution Design Demographic Site Assessment (Metrics Analysis) Functional Requirements Creative Technical Content Mgmt Phase 0 – Solution Design Detailed Design - Production Technical Outputs: Design Proposed Physical Architecture Architectural Overview Diagram Draft of Functional Spec. Document

UCD Process -- Information Business AssessDesignBuild IB + Product Business Models -- Payment Model -- Delivery Model Branding -- Naming -- Attributes -- Scenarios JRD Functional Reqs --Internal (IB) --Internal (Citi) --External (alphas) --Industry Verticals --All Stakeholders Technical Reqs Business/Creative Tech Technical Assessment IA -- Flowcharts -- Templates -- Scenarios Tech Solution -- DB -- Data Models -- Architecture Design -- Studies Usability Dev --HTML --Assembly --UAT --Coding Common PM Ph1 Phase 0 – Solution Design

Months 1-2 Client Education Joint Requirements Definition Mtgs Stakeholder Interviews Competitive Site Matrix Brand Research Create User Scenarios Technical Arch Assessment Workflow Analysis & Design Data & Content Analysis Months 3-4 Complete 1st draft of navigation model : Flowcharts + Templates Outline Architecture Model Develop Component Model Outline Proposed Physical Architecture Description Content Model Development Content Conversion Plan Months 5-6 Usability Studies Revise Navigational Model & Develop 3 Design Studies Begin preparing high-level business use cases & accompanying scenarios to permit development of the system Document Type Definitions Present Final Deliverables Months 7-11 (end) Creative Production of individual page/elements HTML coding/page construction UAT/Usability Testing Back-end coding/develop Content Porting/Development Launch Timeline: UCD Phase 0 & 1 Creative Technical Content Mgt. Phase 0 Phase 1 Competitive Site Matrix Brand Value Matrix/User Profiles User Scenarios Technical Architecture Assessment Document Workflow Analysis Document Content Analysis Document JRD Document UI Functional Reqs + Nav Model Architectural Decisions Doc Architectural Overview Diagram Component Model Proposed Physical Architecture Content Model Content Conversion Plan Final Solution Design Documentation Functional Spec Document Document Type Definitions SiteStyle and Usability Guide Branding Guidelines Site Code Specs Content Creation Guide Outputs Activities

UCD Process Attributes Citi/Client collaboration Iterative deliverable cycle Multi-stream, parallel process –Business/Creative, Technical Internal, cross-skill collaboration