PXI-Kicker Generator Control Jan Schipper TE-ABT-EC.

Slides:



Advertisements
Similar presentations
TS01 Klystron Modulator Minh Nguyen May 20, 2014 Beam Voltage Stability Improvements.
Advertisements

“LHC Controls for Sector Test” Planning SPS Extraction Kicker and Septa LHC Injection Kicker and other equipment (beam stoppers, dumps,...) Etienne CARLIER.
N. Voumard, AB-BT-EC LBDS Audit, CERN LBDS Trigger Signal Distribution Trigger Synchronization Unit (TSU) Trigger Fan Out (TFO) Power Trigger Unit.
Raja Ramanna Centre for Advanced Technology
Linac 6575 Modulator PFN Charging Power Supply Upgrade Minh Nguyen December 5, 2012.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
The TIMING System … …as used in the PS accelerators.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Wir schaffen Wissen – heute für morgen 24 August 2015PSI,24 August 2015PSI, Paul Scherrer Institut Status WP 8.2 RF Low Level Electronic Manuel Brönnimann.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
LNA DC Bias Module Approach Block Diagram Schematic Program Plan
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Test of E906 PreAmp Prototype Da-Shung Su, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2010/01/28.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
MKI’s TCM Tests status Electronics and Controls 17/11/2014 by R.A.Barlow.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
TPC electronics Status, Plans, Needs Marcus Larwill April
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
BPM stripline acquisition in CLEX Sébastien Vilalte.
CERN Timing Overview CERN timing overview and our future plans with White Rabbit Jean-Claude BAU – CERN – 22 March
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.
CSNS Timing System G. Lei Feb Page CSNS Timing System Feb Contents of this talk Breif introduction to CSNS Requirement investigation Strategy:
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Tobias Stadlbauer Special Magnets MedAustron 7-8 October 2010 Special Magnets Controls Status and Plans IntroductionPower SupplySlow ControlsAOB.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
/14 Measurements and cross checks on OPERA timing equipments G. Sirri INFN Bologna On behalf of the OPERA Collaboration LNGS, 28 March 2012.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
Injection/Extraction Kicker CR Aleksey Kasaev BINP-FAIR-GSI workshop
NMLTA Protection System Update -Loss Monitors- Arden Warner September 2 nd, 2009.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
Developments of fast response kicker magnets for Rare-RI Ring
PADME Front-End Electronics
RF acceleration and transverse damper systems
Outcome of BI.DIS Fast Interlocks Peer Review
Data providers Volume & Type of Analysis Kickers
Readout electronics for aMini-matrix DEPFET detectors
TE-ABT PLC and SCADA usage
TE4862 Thyratron Power Triggering System for the CERN Kicker Systems
TCM PS – SPS Thyratron Power Trigger Consolidation
Laser activated thyristor. Technical description.
The digital read-out for the CSC system of the TOTEM experiment at LHC
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Timing System GSI R. Bär / U. Krause 15. Feb. 2008
Interlocking of CNGS (and other high intensity beams) at the SPS
The digital read-out for the CSC system of the TOTEM experiment at LHC
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Presentation transcript:

PXI-Kicker Generator Control Jan Schipper TE-ABT-EC

2 LEIR Kicker control platform A novel approach based on PXI for the consolidation of the Ion Injection Chain has now been successfully deployed on: DFH 11/12/21/42 LEIR Injection Bumpers KFH 31/32/34 LEIR Ejection Kickers KFA28 CPS Ion Injection Kicker Objective

Kicker Magnet Control Layout PXI Generator Controller Front End Controller Kicker Magnet PFN Network Thyratron Assembly Pulse Generator CTRI PX.SCY-CTM Technical Network PX.ELFT-CTM PIX.WKFA28 Power Electronics Power Control Trigger Amplifier Charge Control Capa Charge Control PFN PXI Generator Controller Kicker Magnet PFN Network Thyratron Assembly Pulse Generator Power Electronics Power Control Trigger Amplifier Charge Control Capa Charge Control PFN External Timing Pre Pulse Synchronized with RF Block Diagram Kicker Magnet Control  PPM compatible  Basic Period 1.2 sec PXI Generator Control:  Low Level Control Communication :  Front-end – PXI -> Protocol IEPLC Front-End:  Master controller and data concentrator for all the kicker magnets  Calculate and distribute the required deflection per kicker magnet

PXI Control Integration The pulse generator PXI control electronics have successfully been commissioned and configured to perform the following functionality : Timing Gating, Analysis and Measurements PFL Voltage measurement Voltage Reference PFL to Charge Control Unit Interlock and Status handling Module Control via Power Control Unit Primary Current and PFL Voltage Protection Shot, Faulty, Missing Shot Counters and Protection Short Circuit detection Transmission Line and Magnet Thyratron drift stablizer PXI Control System PXI Architecture Fully integrated in Cern Controls infrastructure with the RADE toolbox supplied by EN-ICE Labview support

PXI – RCPS Diagnostics PFN resonant charging circuit Primary Protection Page SCR Warning Ip Vpfn

PXI – Drift Stabilizer PFL TX Line DS PU MS PULOAD DSMS Magnet Thyratron Drift Stabilizer : Compensate for drift inside Trigger Amplifier and Thyratron, by measuring the time between the rising edge of DS/MS I+ and the DS/MS trigger. By adjusting the offset the drift can be compensated, an interlock is activated if the drift becomes significant Resolution 1 ns, obtained with high resolution digitizer Trig Amp MS Trigger + offset Trig Amp DS Trigger + offset

PXI – Thyratron Protection Thyratron Protection: MS Faulty Shot DS Faulty Shot No MS I+ No DS I+ With High Resolution Digitizer: Short Circuit Detection PFN TX Line DS PUMS PU Dump S.Main S. Magnet Front-Panel of TPU with DS and MS Pickup Signal Bewley-Lattice diagram