Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 1 Updating Construction Schedules Procedure: –Change the duration of all.

Slides:



Advertisements
Similar presentations
IX- CONSTRUCTION PLANNING
Advertisements

CIVL202 Construction Engineering I Tutorial 8 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Spring 2008, King Saud University Time-Cost-Trade-off Dr. Khalid Al-Gahtani 1 Reasons to Reduce Project Durations: 1.To realize incentive pay 2.To fit.
1.040/1.401 Project Management Spring 2007 Lecture 7 Dr. SangHyun Lee Department of Civil and Environmental Engineering Massachusetts Institute.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Spring 2008, King Saud University PERT Dr. Khalid Al-Gahtani 1 Activity Duration 1.“Guess” the activity duration, especially smaller activities. 2.Use.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
International Campus – Kish Sharif University of Technology Session#12.
Software Project Planning CS 414 – Software Engineering I Donald J. Bagert Rose-Hulman Institute of Technology December 12, 2002.
Project Management Session 7
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening) 4/17/ :55 AM.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Spring 2008, King Saud University Resources Leveling & Allocation Dr. Khalid Al-Gahtani 1 How Limited Resources Affect Schedule Float.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Management Methodology Project monitoring and control.
Controlling cost ( lecture + seminar ). Why control cost? To satisfy financial auditors and support data for the government (obligatory). To satisfy the.
1 Project Control Kathy S. Schwaig. 2 What is Project Control? Project control is the continuous monitoring of the project for deviations from plan (time,
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
After Lesson 6 next is Lesson 13 to fit topic on Software Development SOFTWARE PROJECT MANAGEMENT.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management 101 CS3300 Fall Generic Management Planning Organizing Staffing Leading / Directing Controlling To accomplish goals of an organization.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Chapter 15 Cost Control.
Management & Development of Complex Projects Course Code - 706
DEFINING THE PROJECT CHAPTER 4.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
EARNED VALUE MANAGEMENT (EVM)
Controlling cost 2 ( seminar ). Budget preparation Data collection WBS Cost centres Indirect expenses & the use of hammocks –direct –overhead (indirect)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Geog 469 GIS Workshop Project Management.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 9 Cost Planning and Performance. 222 Learning Objectives Items to consider when estimating cost Preparing a baseline budget Cumulating actual.
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
Project Management “Project Planning & Scheduling” Lecture 07 Resource Person: M. Adeel Anjum.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Planning and Organizing Chapter 13. The Planning Function Planning for a business should stem from the company’s Business Plan – The business plan sets.
SOFTWARE PROJECT MANAGEMENT
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
WEEK 3 Project Planning.
Project Cost Con trol. 1.To identify those work types having excessive costs and to give an indication of how serious those overruns are. 2.To forecast.
MENG 446 : Management of Engineering Projects
Project Modelling The success of the whole planning and control function depends on the project planner being able to define the project’s full scope of.
TOPIC-8B- PROJECT COST CONTROL
Chapter 9 Cost Planning and Performance
CHAPTER:7 Project Cost Management
Project Cost Management
Controlling cost.
Project Modelling The success of the whole planning and control function depends on the project planner being able to define the project’s full scope of.
Chapter 9 Cost Planning and Performance
Presentation transcript:

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 1 Updating Construction Schedules Procedure: –Change the duration of all completed activities to zeros. –Identify all activities on which work is currently proceeding as live activities. –Put early start time of live activities equals the update time and their durations equal the remaining duration given by the update report. –Change durations of future activities as given in the update report. –Carry out network analysis in the normal way and prepare a new activity schedule.

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 2 Example

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 3 Example The position of the activities at the end of the fifth week is as follows: –Activities B, C, D and E have been completed. –Activity F is ready to start at beginning of week 6. –Remaining duration of activity H is 4 weeks. –Remaining duration of activity I is 3 weeks. –Activity G will not start until end of week 7. –Volume of work in activity L has been increased by 33% approximately. –Activity J has been omitted. –It is decided to shorten activity K by 2 weeks. Construct the updated schedule indicating the critical path and showing new activities times.

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 4

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 5 Work Breakdown Structure WBSWBS divides the project into recognizable systems (work packages, WP’s or Bid Packages) that responsible assignable work units, and for which accountability can be expected/assigned.

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 6 Traditional A/E PDS

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 7 Professional Construction Management

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 8 Developing WPs Develop WBS –Identify WPs Draw a WPs Network

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 9 Developing WPs Each WP must have –One Performing Agency (PA) such as Subcontractor –One Responsible Agency (RA) such owner’s Project Engineers Interconnection between Packages should be district and clear to facilitate coordination

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 10 Developing WPs Bid a WP at the most short time so as to stimulate competition (Keep away uncertainty)

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 11 Cost Coding System Cost Central level = Lowest level at which functional responsibility for individual WBS element exit. –XXX XXX XXX XXX An example: – A.00.cf34

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 12 MASTERFORMAT system

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 13 Cost Coding System Advantages of coding systems are: –Provide a numbering system to replace verbal descriptions of items. –These codes reduce the length or complexity of the information to be recorded. –aids consistency in definitions and categories between projects and among the various parties involved in a project. –aid in the retrieval of historical records of cost, productivity and duration on particular activities. –electronic data storage and retrieval operations are much more efficient with standard coding systems.

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 14 Project Cost Control Budgeted Cost of Work Scheduled (BCWS) is the budgeted amount of cost of the work scheduled to be accomplished in a given time period (including support and allocated overhead). Budgeted Cost of Work Performed (BCWP) is the budgeted amount of cost for the work completed in a given time period, including support effort and allocated overhead. (This is sometimes referred to as “earned value of work accomplished”.) Actual Cost of Work Performed (ACWP) is the amount reported as actually expended in completing the particular work accomplished within a given time period.

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 15 Type of performance

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 16 Type of performance

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 17 Type of performance

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 18 Type of performance

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 19 Cost Index

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 20 Schedule Index

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 21 Estimated Cost/Time At Completion

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 22

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 23 Project Example

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 24 Project Example

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 25 Project Example

Spring 2008, King Saud University Time and Cost Control Dr. Khalid Al-Gahtani 26 Project Example