Electronic Defective/Damaged Car Tracking System (DDTS) ACACSO Meeting Chicago - May 7, 2008 Dale Cassels CSX Transportation.

Slides:



Advertisements
Similar presentations
Railcar 101 The Basics of Railcars: Car Types, Components and Rules
Advertisements

Effective management Accurate tracking Easier automation.
1 Car Hire Rules 7 & 8 – After DDCTS Goes Live ACACSO – November 11, 2010 Tempe, AZ.
1 © 2013 Railinc Corp. All rights reserved. R ECLAIMS Presented By: Chauncey Fallen Manager-Transportation Services GATX Corporation- Rail.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Industry Initiatives: What is Railinc.
ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation ACACSO Meeting Las Vegas – May 10, 2013 Scott Churchill CSX Transportation.
Copyright © 2011 Railinc Corp. All Rights Reserved Industry Projects and the RPSWC Process 1.
May 21, 2008DTE Rail Services, Inc. Railcar 1011 Railcar 101 The Basics of Railcars: Car Types, Components and Rules Overview and Basics Ken Henman.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
R ULE 22 A UTOMATION ACACSO – MAY B ACKGROUND Recommended by Centralized Car Hire TAG (CCH) in September 2013 Unanimously approved by Equipment.
Railroad Clearinghouse Update ACACSO – November 12 th, 2008 Orlando, FL Robert Sanford Manager Car Accounting.
Creating a Maintenance Plan Auditing, Data Exchange and Paperless Billing Carol Scarborough.
Union Pacific Railroad Future Car Accounting Process Linda Newell - Gen Dir ECommerce, Mike Carmichael - Sr Mgr Car Acctg, Lori Wies - Mgr Car Acctg May.
Rutgers Integrated Administrative System RIAS Phase III – HRMS, Budgeting, and Enterprise Reporting Treasurer’s Luncheon December 2, 2008.
BILLING AND COLLECTIONS AWWA Leadership Forum Session Two November 10, 2009.
EAC Update for ACACSO – Nov 2014 George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation November 2014.
Vehicle and Equipment Maintenance Tracking & Cost Program Designed for the Green and Construction Industries For Companies of Any Size EQUIP TRACK.
Implementing and Managing a Maintenance Plan The Maintenance Plan Ken Henman.
May EAC meeting Schedule 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks before the Business Services.
Field Manual of the AAR Interchange Rules
Presentation to Association of Car Accounting and Car Service Officers.
Railinc Vision of the Future of Car Hire Mark Aldenderfer, Business Analyst ACACSO November 12, 2010.
Dale Cassels – Manager Car Accounting CSX Transportation.
© Railinc 2009 All Rights Reserved 1 Railinc Corporation – 7001 Weston Parkway, Suite 200, Cary, NC – Report on Railinc’s.
1 Railroad Clearing House for Car Hire ACACSO May 7, 2008 Chicago, Illinois Anthony Glover.
Damaged and Defective Car Tracking ACACSO May 12, 2010 © 2010 Railinc. All rights reserved.
EAC Update ACACSO November, EAC meeting schedule for 2011 The dates of the meetings changed so that EAC meetings will occur approximately two weeks.
RAILINC I ACACSO
EAC Update ACACSO May 12, 2010 George A. Jones Project Update Damaged & Defective Car Tracking (DDCTS) – Work has begun on the 2010 project to complete.
Rule 22 Automation Update ACACSO – Austin, TX November 2014.
© 2007 Railinc. All rights reserved. Equipment Assets Management Working Committee.
RAILINC I ACACSO
Mike Partica November 13th, 2008 Orlando, Florida The Future of Car Hire.
AAR Audit TAG Update May 08, 2008 George A. Jones - CSXT.
Damaged and Defective Car Tracking System - Update Dale Cassels - CSX ACACSO November 12, 2008.
RULE 4 UPDATE ACACSO Meeting Atlanta – November 14, 2013 Scott Churchill.
©Railinc 2010 All Rights Reserved Weston Parkway, Suite 200, Cary, NC – Damaged and Defective Car Tracking.
RAILINC I ACACSO
Supervision SICOR Securities, Inc.. Why? NASD 3110 requires the firm to “…establish and maintain a system to supervise the activities of each registered.
George A. Jones, CPA CMA – Dir. Car Accounting and Disbursements CSX Transportation May 2014.
1 CHAPTER 5 THE ACCOUNTING SYSTEM: CONCEPTS AND APPLICATIONS.
Authorized economic operator Minimizing risks, optimizing flows.
LCS Report Card Mike Partica May 2008 Chicago, Il.
RAILINC I ACACSO
Equipment Asset Management Working Committee 2009.
© 2010 Railinc. All rights reserved. Industry Projects & Vision May 9, 2012 New Orleans, LA Jim Pinson Railinc.
CORRECTION OF WEIGHT RELATED ELEMENTS Gross Rail Load does not equal Tare Weight plus Load Limit. August 2011, 99,770 cars had values to correct. March.
RAILINC I ACACSO
Equipment Asset Management Working Committee Update.
Steve Thorpe, Compliance Assurance Barb Baxter, Field Services.
RAILINC I ACACSO
Defect Damaged Car Tracking System Robert Sanford Manager Car Accounting Norfolk Southern.
DDCT Running Repairs Program Maintenance
Yes? Check out what CargoHub is about
Car accounting self service Overview
Centralized Car Hire Foundation User Support Project
DDCT and How it Affects Car Hire
Automating Manual Tasks/Eliminating Human Error
Jackie Singer CN System Manager – Business Process Optimization
Umler® & CHARM Industry critical applications working together
ALLIANCE VENDOR WEBINAR -- Annual Spend
Industry Terms & Acronyms
DDCT/Car Hire Workshop
Serving Area Table Project Update
Car Hire Rate Negotiation Self-Service 2016 Release Highlights
Damage Defective Car Tracking (DDCT) System
Car Hire Rule 4 Jim Pinson ACACSO May 7, 2014.
Managing Data Updates Chuck Bailey, VP of Software Implementation and Support.
Equipment Quality Reporting System
An Industry Compliance Platform
Presentation transcript:

Electronic Defective/Damaged Car Tracking System (DDTS) ACACSO Meeting Chicago - May 7, 2008 Dale Cassels CSX Transportation

2 Some History Arbitration and Rules Committee (ARB) & Car Repair Billing Committee (CRB) implemented changes for all car repair billing to be paperless. One final change – electronic defect cards Equipment Assets Management Working Committee (EAMWC) has also been working to reduce paper exchange. Car Hire Rules 7 & 8 allow relief when specific events occur. Determining those events is labor intensive. Create a central repository of information related to defective/damaged rail cars.

Project Committees: ARB (Arbitration and Rules Committee) EAMWC (Equipment Assets Management Working Committee)

Project Sponsors: Rich DeWitt – TTX Mike Partica – CN

5 Project Goals: Create a web based data exchange for defective and damaged freight cars. Identify and communicate agreed information in a timely manner to parties that need the data. Allow data to be updated as the handling of the car progresses. Provide electronic notices when expected updates are not made. Maintain user audit logs and historical records. Provide reports and allow ad hoc inquiries. Upload and download files between parties involved.

6 Project Stakeholders: Mechanical – primary supplier of data Car Accounting – uses data to calculate and audit car hire and reclaims Revenue Accounting – sends out freight bills Property Accounting – maintains inventory for fleets Car Owners – receives information on damaged or defective cars and provides data and disposition ARB – rules review EAMWC – rules review

7 Risks: Lack of active participation in reporting the data Inability to change industry rules to support the project Contract shops may not report cars in and out of shop Railroads need to report all locations where shop repairs are made The central contact list may not be current

8 Estimated Cost of the project $1,040,600 – One time costs 175,000 – Annual recurring costs $1,215,600 – Total costs

9 Tangible Benefits: Not replacing 18,500 card brackets$323,750 Discontinuing new car receptacles 300,000 Reduction in over paid car hire 279,100 Not printing the defect cards 20,000 Not mailing the owner a copy of card 3,750

10 Tangible Benefits Continued: Annual Recurring Benefits: Mechanical $ 718,750 Car Accounting 464,500 Total Benefits$1,183,250

11 Next steps: Requirements Documents – Done Functional Design Document – Next week Programming Begins Rule Changes Testing – November 2008 Production – December 2008

Questions ???