CONTENTS Accuracy of Construction Cost Estimating 00 Abstract
Advertisements

This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
Cost Behavior and Cost-Volume-Profit Analysis
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Earthwork QTO Stage 1 Preconstruction Stage 2: Procurement
Three Approaches to Value SAMA May What is happening in SK? 2.
35 Estimating Building Costs Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Explain the process.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Assemblies Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Learning Curve Analysis
Review of Plans & Estimating Introduction Architect’s Responsibilities Types of Estimates Factors Affecting Cost Film Project:
V-Cost Estimation 1.Costs Associated with Constructed Facilities
Business Math, Eighth Edition Cleaves/Hobbs © 2009 Pearson Education, Inc. Upper Saddle River, NJ All Rights Reserved 17.1 Inventory Use the following.
Cost Estimating EGR 386. Estimating Up till this point in our economics lesson –assumed known future cash flows, but… An important aspect of engineering.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Estimating Software Size Part I. This chapter first discuss the size estimating problem and then describes the PROBE estimating method used in this book.
Thesis Proposal Virtual Reality in Construction Cost Estimating By: Mandy Frazure Date: 5/12/04.
Construction Engineering Management Project Costing
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Table of Contents Chapter 1 (Introduction) Special Products Break-Even Analysis (Section.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
Construction Contracts and Project Delivery Methods
Economic Estimation Models Engineering Economics Lecture January 2010.
12-1 CHAPTER 12 Managerial Accounting and Cost — Volume — Profit Relationships McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved.
Management & Development of Complex Projects Course Code - 706
1 MARKETING RESEARCH Week 5 Session A IBMS Term 2,
CHAPTER 3 Resolution and Design. Predesign Phase Programming –Functions to: Guide Inform Inspire the project designer –Not a ‘grocery list’ –Not a ‘wish.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
& GUIDED QUESTIONS MATH VOCABULARY DAY 5. Go to your Table of Contents page.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
1 Chapter 5 – The Time Value of MoneyCopyright 2008 John Wiley & Sons MT 480 Unit 2 CHAPTER 5 The Time Value of Money.
Chapter 13 Estimates for Remodeling Work
Chapter 13: Site Valuation. Approaches to Site Valuation  Direct sales comparison approach  Extraction method  Development approach  Capitalization.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Introducing The Cost Approach
Management Approaches. Construction Management Customer appoints Design team and Management team.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Chapter 4 Section 3 Elasticity of Demand. Demand Elasticity Elasticity= the cause and effect relationship in economics. Demand Elasticity= measure of.
The accuracy of averages We learned how to make inference from the sample to the population: Counting the percentages. Here we begin to learn how to make.
Construction Management At Risk Process
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Chapter 3: Cost Estimation Techniques
Design process.
Quantity Surveying.
Chapter 3: Cost Estimation Techniques
Estimating and Scheduling CEE 492
Supply Producing Goods & Services
Drawings Introduction to FIDIC - Drawings -.
Estimating Project Costs
Chapter 17 Valuation of Hospitality Real Estate.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-contract Planning and Practice
Estimating Capital Costs
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Chapter 3 Resolution and Design.
2. Stratified Random Sampling.
Design process.
House Construction Budget Plan
CTC 475 Review Inflation Inflation rate f is the rate of change in the value of currency (inflation/deflation) Inflation-free rate i represents a gain.
Business Math Chapter 17: Inventory.
Contract and tender form Phases of designing Phases of implementation
FIVE PROJECT PHASES.
Multi-Family Fourplex Apartment
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Conceptual Cost Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Conceptual Cost Estimating Topic 3 Chapter 4 Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating 1 1

Lecture Outline We are still in the conceptual phase The owner selected the site, the scope, decided on type of contracts, and hired a Consultant, and or a CM. To take a GO/ NO GO decision, the owner needs a rough estimate of the cost of the project So far, no design documents are available, not even the floor area of the structure. Available information is of the type: nice motel of 50 rooms, two story house of such quality, parking garage that can park 400 cars. A conceptual estimate will provide that rough estimate of cost Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Estimating Fundamentals Why and when to estimate conceptual phase: conceptual estimating schematic and design development phases: square foot and assemblies estimating procurement phase: detailed estimating. Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Estimating Fundamentals Estimate considerations project size: larger projects are more expensive. Figure 4-2 and learning curves. Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

To adjust for size, use table in Figure 5-3 page L7-1, or page 108 of the book compute the size factor = proposed area/typical area From the graph, get the cost multiplier at the size factor multiply the cost by the cost multiplier. project quality: figure 4-4. location: taken into consideration by location indices.

Figure 5-3 Project size multiplier

time: cost need to be projected to payment time fig 4.5 page L-68 Present cost at city (X) = former cost at (X) x present historical index at (X) former index at (X) cost at any city at a given time/historical cost index at that city at that time = constant For example, a building that cost $1,000,000 in Seattle in 1965 will cost in 2003 in Seattle= 1,000,000 (100/16.6) = $ 6,024,096 Historical Cost Index (page L-68) Pay attention to location factors if needed. other factors: economic situation, relationship with owner owner Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Figure 4-5: historical cost index

Conceptual Estimate (ROM) Also called rough order of magnitude (ROM). Commonly used to determine approximate costs of projects or subsystems within a project, most commonly in building construction. Can be quite general or very detailed, according to the level of details shown in the drawings, if any. Similar to any pre-construction estimate, prepared by the owner, designer, and/or CM. Can be done in minutes and provide accuracy in the ±20% range. Can be done in many ways. A base cost is obtained, from guides?, and then modified for location, size, and time if necessary

Cost Estimating Guide Books Cost Estimating guides differ in the level of details and cost. different guides are available for different specialties and different parts of the country. We will use material from R. S. Means Inc. The estimate covers the cost of construction, plus overhead and profit, but not the price of land or cost of demolition. Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating 3

Conceptual cost estimating using Means guides 1) Parameter Estimates It relates the total cost to few physical measures (parameters) that reflect the size or scope of the project. Examples Estimate of the cost of a school by multiplying the area by the unit price based on area. A parking garage estimate based on the number of cars Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Examples 1) Using Means Assembles Cost Data 2003, Estimate the cost of constructing a 50 units high quality motel in Pittsburg, Tampa FL, or New York NY in January 2003? Answer a) basic cost: from table K1010 000, figure 5-1 (L-69), line 590-9000: cost per unit ( high quality-- use column 3/4) = $51,500 total base cost = 50 units X $51,500 = $2,575,000 Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Figure 5-1

Examples b) adjustment for size: from table K1010-031 figure 5-2(L-70): - typical high quality motel unit gross area = 620 SF gross area of the motel = 50 X 620 = 31,000 SF, consider that your “ proposed area”. Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

- from the table in figure 5-3 (L-71) typical total size of the motel is 40,000 SF size factor = proposed building area/ typical building area = 31,000 / 40,000 = 0.775

Figure 5-3 Project size multiplier

cost adjusted for size = $2,575,000 X 1.04 = $2,678,000 from the graph in figure 5-3, cost multiplier at size factor = 0.775 is 1.04. cost adjusted for size = $2,575,000 X 1.04 = $2,678,000 the cost increased because the unit cost goes up as the project size goes down. The base cost was for a motel of a larger size. c) adjustment for location: the base cost assumes the national average. City index is obtained from the table in figure 5-4 page L- 72 in general: adjusted cost for city = estimated cost X city index /100 Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Figure 5-4

2) What is the cost to build that motel in NY today? Answer city index for New York is 132.6, for Tampa is 80.3, for Pittsburg is 100.2 New York City cost = $3,551,028 cost at Tampa = $2,150,434 cost at Pittsburg = $2,678,535 2) What is the cost to build that motel in NY today? Answer Assuming 2.6% per year, what is the cost today? 3) What was the cost to build that motel in NY in 1955? Use “Historical Cost Indexes” Figure (4-5) page L-68 where, past project cost/index past year = project cost in 2003 /index 2003 project cost in 1955 = $3,551,028 X 12.7/100 = $ 450,980 Stage 1:Preconstruction - Conceptual Planning– Conceptual Cost Estimating

Figure 4-5