Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.

Slides:



Advertisements
Similar presentations
Ferrite outgassing results G
Advertisements

Summary of session 3: Optimise Interventions and Recovery from Collateral Damages on Cold Sectors Prepared by Caroline Fabre & Pierre Strubin Based on.
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Carried Away! - Physical Dispersal of Marine Debris.
LHC VACUUM SYSTEM: 2012 REVIEW AND 2014 OUTLOOK G. Lanza, V. Baglin, G. Bregliozzi, J.M. Jimenez EVIAN 2012.
Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
ALIGNMENT OF Q2 LOW BETA QUADRUPOLES D. Missiaen, On behalf of the EN-MEF-SU/MTI team 1.
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Magnets repair for 3-4 sector Lucio Rossi Reinstallation and interconnections Francesco Bertinelli Vacuum system – How to get ready for beam ? Vincent.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
M. Karppinen TE-MSC-ML on behalf of S. Atieh, P. Cruikshank, M. Duret, J-C. Perez, V. Parma, T. Renaglia, S107, S108, Dubna teams Pressure relief valve.
Vacuum sectorisation H- Injection Some history Wim Weterings
Status of the activities on vacuum system C. Garion TBMWG, 20/06/2012.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Vacuum, Surfaces & Coatings Group Technology Department (some) Other non-solved NC across the LHC ring and potential impact on performances V. Baglin.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
Status of the activities on the vacuum system C. Garion TBMWG, 27/03/2013 Outline: ON/OFF mechanism: tribology study Pumping technology: MB quad VC Accelerating.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
BSRT UPDATE LMC 02-OCT-2012 F.Roncarolo on behalf of the BSRT team W.Andreazza, E.Bravin, A.Boccardi, J-J.Gras, A.Goldblatt, M.Hamani, T.Lefevre, R.Jones,
TE-CRG Activities D. Delikaris, TE-CRG.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE) Adriana Rossi BE/ABP on behalf of the collimation project (BE/ABP-EN/STI-TE/VSC-EN/ACE)
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
HRM28-TCDI Updates October 28 th, 2015 Fausto Lorenzo Maciariello, on behalf of the TCD Team.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Alignment of VSC components along LSS 1&5
SMACC Tenth report [15 min] 13/09/2013
Manufacturing of the first FCC-hh beam screen prototype for ANKA
K. Foraz on behalf of OSS members
Preliminary Y-chamber specifications – First draft
Operating SRF systems reliably in a “dirty” accelerator
Long Shutdown for the LHC: Vacuum Beam Pipes
Consequences of warming-up a sector above 80 K
J.M. Jimenez On behalf of TE-VSC group
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
K. Foraz on behalf of OSS members
On behalf of TE-VSC group
X-Rays made by P. Lepeule (TE/VSC) and J-M Dalin (EN/MME)
Closing of sector 7/8 Interconnections of LHC cryomagnets
Typical NC in Warm Modules Following X-ray campaign
Presentation transcript:

Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and additional activities on cold beam lines.  Inspection and cleaning activities in sector 3-4 during LS1  Activity sequence  Procedure  Schedule  Conclusion 2 August 2013 C. Garion2 C. Garion on behalf of TE/VSC with materials of Vincent Baglin

Vacuum, Surfaces & Coatings Group Technology Department History: Beam vacuum line cleanness in sector 3-4 after incident 2 August 2013 C. Garion3 LSS3 LSS4 V1V2V1V2Total Ok %18 %22 % MLI %61 %59 % Soot %21 %19 % Total % MLI Contamination types: MLI Soot (Debris) Contamination distribution: Soot

Vacuum, Surfaces & Coatings Group Technology Department History: Cleaning methods after 3-4 incident (1) 2 August 2013 C. Garion4 Foam plugs for the soot:  Use of two plugs for horizontal and vertical parts of the beam screen  Use of alcohol-wetted and dry foam plugs  Up to 50 passages in each direction with wet foam plug and up to 15 passages with dry plug Example of C19R3.V2

Vacuum, Surfaces & Coatings Group Technology Department 2 August 2013 C. Garion5 History: Cleaning methods after 3-4 incident (2) Air flux for the MLI:  1st step: automatic pumping/venting  A cycle : 20 s pumping, 18 s plateau, 2 second vent  The pressure is reduced from 1 atm to 0.8 atm in 2 s (to be compared to the arc pump down of 200 mbar/h)  Apply this process for 30 min (40 pumping/venting cycles)  2 nd step: aspiration with local pertubation controlled by endoscope  nozzle blows filtered air, the MLI residues left behind the beam screen and the RF fingers are directed towards the beam aperture where they are aspired away.  Time : 5 min per PIM, speed of 3 m/min along the beam screen

Vacuum, Surfaces & Coatings Group Technology Department 2 August 2013 C. Garion6 History: cleanness after 3-4 incident Acceptance criteria: After discussion with AB-ABP and following Chamonix it was agreed with the management that : -1 fibre per half-cell -2 debris (MLI or other less than 1 mm 2 ) per magnet can be left in the beam tube after the cleaning process ! Few pictures of non-conformities: Q29L4 V1 Q34R3 V1 A32L4 V1

Vacuum, Surfaces & Coatings Group Technology Department Foreseen activities on cold beam lines (at the LS1 start). 2 August 2013 C. Garion7 4 Magnet exchanges Damaged bellows (PIM cutting to be confirmed at opening: not to be changed)  Point 3 Point 4  «standard» endoscopy (54 m in one direction per line)

Vacuum, Surfaces & Coatings Group Technology Department Foreseen and additional activities on cold beam lines. 2 August 2013 C. Garion8 New opening: QBBI.A14R3 (V2); QBBI.A20R3 (V2)  Point 3  2 additional openings are asked for inspection and investigation (Endoscopy).  Extended endoscopies.  Air flux for MLI removal Point 4 

Vacuum, Surfaces & Coatings Group Technology Department Inspections and cleaning activities in sector 3-4 during LS1 (1) 2 August 2013 C. Garion9 Sequence:  Point 3 Point 4  Cleaning by pulsed air flow (24h) toward point 4 Analysis and decision Endoscopy Cleaning by pulsed air flow Prudent endoscopy*  analysis Cleaning by pulsed air flow * Prudent endoscopy: if too many debris are observed, the endoscopy will be stopped and the cleaning carried out endoscopy.

Vacuum, Surfaces & Coatings Group Technology Department Inspections and cleaning activities in sector 3-4 during LS1 (2) 2 August 2013 C. Garion10 Same procedure as in 2009 will be applied (EDMS ) Same material, available

Vacuum, Surfaces & Coatings Group Technology Department Schedule of inspection and cleaning activities in August 2013 C. Garion11 All interconnections and beam vacuum lines related to these activities in sector 3-4 are opened including the QBBI.A14R3 and QBBI.A20R3 VSC activities in parallel with SIT reconnection work. No closure of the beam vacuum lines (PIM installation before the end of the activity) Start of VSC activities beginning of August (8 August) ~ 3 weeks in total From point 4 first (to avoid interaction with optical fibre activity, t.b.c.); Mid august from point 3

Vacuum, Surfaces & Coatings Group Technology Department Conclusion 2 August 2013 C. Garion12 A scenario of inspection and cleaning of the cold vacuum beam lines in sector 3-4 is proposed. The additional work for the SMACC team has been minimized while providing a maximum of informations and efficiency of the cleaning. A cleaning of the 2 beam vacuum lines will be carried out based on pulsed air flow. Procedure and tooling have already been applied in 2009.

Vacuum, Surfaces & Coatings Group Technology Department Back up slides 2 August 2013 C. Garion13 Cleanness after incident PIM status Interconnection status

Vacuum, Surfaces & Coatings Group Technology Department UFO activity 2 August 2013 C. Garion14 Courtesy of T. Baer Source probably identified - ongoing To be inspected, most likely a consequence of 3-4 incident Inspected and no cause found

Vacuum, Surfaces & Coatings Group Technology Department Beam screens with soot in tunnel : B19R3 B19R3.V2 before cleanning entrancemid end After cleanning V. Baglin Chamonix 2009

Vacuum, Surfaces & Coatings Group Technology Department Beam screens with soot in tunnel : C19R3 C19R3.V2 before cleanning entrancemid end After cleanning V. Baglin Chamonix 2009

Vacuum, Surfaces & Coatings Group Technology Department RF ball test 2 August 2013 C. Garion17 RF ball after test of V1 in sector 3-4: Few MLI chips found