Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC.

Slides:



Advertisements
Similar presentations
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS March 2008.
Advertisements

AUSTAR COAL MINE A2 MAINGATE ROADWAY DEVELOPMENT Experiences and Lessons Learned Presenter Glenn Sobey Development Mining Engineer Austar Coal Mine.
District 7 Informational Meeting Rock Dusting. Why Rock Dust?
Research Update Automated Bolting and Meshing Project - C17018.
Self Drilling Rock Bolt Technology for the Coal Industry Advanced Solutions Ground Support Services Pty Ltd September 2007.
DESIGN AND ANALYSIS OF A TWO STROKE I.C.ENGINE Prepared by: Suraj Jose Amit Modi Vishal Panchal Vishal Modha Guided by: Mr. H. K. Solanki DEPARTMENT OF.
Booster fan applications for sections in longwall and room-and-pillar mining Christopher Pritchard MS PE Acting Team Lead Ventilation Group Fires and Explosions.
Retrofit Emission Control Technologies for On-Road, Off-Road, and Stationary Diesel Engines Manufacturers of Emission Controls Association May 2000.
ACARP KEY FINDINGS - DECEMBER 2006 BENCHMARKING STUDY Gary Gibson, ACARP.
2 ND EDITION ROD JONES Copyright © Pearson Australia (a division of Pearson Australia Group Pty Ltd) 2010 PowerPoint presentation to accompany.
ACARP Australian Roadway Development Improvement Project CM2010 IMPLEMENTATION STRATEGY August/September 2009 Guy Mitchell, BMA Coal Bob Miller, Centennial.
Seminar On Gasoline Direct Injection
Preventative Heatstroke Cooling Shelter: ASHRAE Design Competition Andres Gomez Errick Santana Orangel Velazquez EML 4551 Ethics and Design Project Organization.
Community Air Pollution from Crash Repair Workshops Dino Pisaniello Department of Public Health Adelaide University, Australia.
1 Booster Fans - Some considerations for their usage in underground coal mines S. Gillies, C. Slaughter, F. Calizaya and H. W. Wu 13th United States/North.
Spray Finishing Operations/Spray Booth March 9, 2009.
THIRD PACIFIC ECONOMIC COOPERATION COUNCIL MINERALS NETWORK MEETING THE AUSTRALIA / INDIA MINE SAFETY TRAINING PROJECT (An Australian Government Aid-Funded.
Industrial Ventilation - A major control measure Dr. AA, UTM.
Outburst Workshop A new operator’s perspective Scott Langley BHP Billiton Illawarra Coal.
Environmental Health and Safety Radiation Control and Radiological Services.
Introduction of Internet Survey Methodology to the Emirate of Abu Dhabi Andrew Ward, Maitha Al Junaibi and Dragica Sarich.
Introduction Hazards are an inherent component of the workplace whether we recognize them or not. Some are easy to spot and are known by almost everyone.
PROPOSED DUST RULES DEPARTMENT of LABOR Mine Safety & Health Administration Coal Mine Safety & Health DEPARTMENT of LABOR Mine Safety & Health Administration.
ACARP Project C14036 Development of a New Shearer Scrubber System for Dust Control Brian Plush EnviroCon Ting X Ren and Rao Balusu Exploration and Mining.
AUSTRALIAN SEALING PRACTICE AND USE OF RISK ASSESSMENT CRITERIA - ACARP PROJECT C17015 Hsin Wei Wu and Stewart Gillies Gillies Wu Mining Technology Pty.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
Felipe Calizaya Miles Stephens 2010 UTILIZATION OF BOOSTER FANS IN UNDERGROUND COAL MINES Stewart Gillies Univ. of Utah, Salt Lake City, UT Missouri Univ.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS September 2007.
Research Update Automated Bolting and Meshing Project.
ACARP Presentation Cutting A Smarter Metre Process optimisation techniques currently being utilised.
ROADWAY DEVELOPMENT IMPROVEMENT PROJECT
Valorisation and dissemination of EAF technology
TECHNICAL AND ENVIRONMENTAL IMPROVEMENT OF LNG CARRIER’S PROPULSION MACHINERY USING JATROPHA BIAO DIESEL FUEL 1 Prof. M. A. Mosaad Naval Architecture and.
Asbestos at Finnish workplace Senior engineer Erkki Sundquist Ministry of Social Affairs and Health.
ACARP Australian Roadway Development Improvement Project ROADWAY DEVELOPMENT OPERATORS’ WORKSHOPS March 2009.
Preventing Silicosis in the Mining Environment. 1.Prevention of Silicosis to Improve Mine Workers Health and Quality of Life. 2. Compliance with MSHA.
Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops September 2009 ACARP PROJECT C17004 UPDATE: TOUGH SKIN – A SPRAY-ON.
ACARP Australian Roadway Development Improvement Project Strategy Workshop April 2007.
Sawyer Environmental Changes Mechanical Engineering Department Capstone Amy R. Dan H. Colby C. Brittany P. Richard G. 1.
1 ACARP Roadway Development Operator Workshops March 2009 Modelling of Gateroad Development Ernest Baafi – UOW Geoff Gray – SMS Ian Porter – UOW Osvaldo.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
ACARP ROADWAY DEVELOPMENT WORKSHOPS MARCH 2008 Presentation for.
Objective of the investigation: Determine the number and arrangement of jet fans to be installed in the Acapulco Tunnel that will ensure an air quality.
ACARP Roadway Development Operator Workshop No 7 A Systems Approach to Roadway Development Mick Kelly, BMA Coal.
CM2010 IMPLEMENTATION STRATEGY
Mark J. Schultz, P.E. Chief, Environmental Assessment and Contaminant Control Branch Dust Division Mine Safety and Health Administration Pittsburgh Safety.
Slim Borehole Scanner (SBS) An Update
Air Blast Circuit Breaker
Mine Health & Safety Inspectorate Northren Cape Region – May 2014 MH Sease - IOM.
ACARP Australian Roadway Development Improvement Project OPERATORS’ WORKSHOPS August 2008.
Dr. Hatem Elaydi Engineering Technical English Islamic University of Gaza Feb. 8, 2016 Unit 1: Technology in use Emphasising technical advantages.
2 Reduction of GHG emissions Energy Efficiency Design Index – Minimum power to ensure safe manoeuvring in adverse conditions Tripartite – Tokyo,
MINE AUTOMATION AND VIRTUAL REALITY PROJECT By Prof D Chakravarty, Prof B Samanta, Prof A Bhattacherjee, Prof J Bhattacharya Department of Mining Engineering.
1 Australian Coal Sector Update 18th Session of the GMI Coal Subcommittee November 2013 Australian Government.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Test Cell Airflow Study For Cargo.
Who are We What do We do How do We do it –Incineration 101 Incinerators vs. Flares Other Choices? Why request an AWI incinerator? –Benefits –Dispersion.
RECENT TRENDS IN POWER SYSTEMS
OSHA Final Rule: Occupational Exposure to Respirable Crystalline Silica OSHA has amended its existing standards for occupational exposure to respirable.
Automated Monitoring and Warning Systems Presented by Mark Johnston – PIMS Group Principal Engineer Dave Dowell – PITS Engineering Manager Introduction.
Ventilated underground tunnel as a contribution for sustainable refurbishment of buildings affected by rising moisture Jiří PAZDERKA,
The strength properties of non steel dowels for strata reinforcement in coal mines Naj Aziz David Gilbert, Ali Mirza, Xuwei Li, Haleh Resekh, Naj Aziz.
Government Engineering College Valsad
INTENSIVE COOLING INSTALLATION
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
August/September 2009 RDTG Workshop
Outburst Threshold Limits Current Research Outcomes
ACARP Project C16022 undergroundcoal.com.au
0 Air Blast Circuit Breaker under the guidance of:- Presented By:- Mr. B.R.Reddy Anuj Kumar Pandey EN-3 rd year Roll No Unrestricted.
GSI Asia Evaporative Pad with Flute Angle 45/15
Presentation transcript:

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 ACARP PROJECT C17004 TOUGH SKIN – A SPRAY-ON POLYMERIC REPLACEMENT FOR ROOF & RIB MESH Chris Lukey, Ernest Baafi, Jan Nemcik, Ian Porter School of Civil, Mining & Environmental Engineering Faculty of Engineering, University of Wollongong Roadway Development Operators’ Workshops March 2009

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Objectives To develop an alternative to steel mesh that: *Provides an effective skin confinement measure equivalent or superior to that of steel mesh *Requires minimal human intervention in its installation *Removes personnel from the immediate face area *Enables higher underground roadway development rates to be achieved *Is safe to use *Is cost effective The focus of our work is the development of a polymer- based alternative that can be spray-applied

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Why do we need an alternative to steel mesh? Currently steel mesh is installed manually Automatic self-drilling bolt technology cannot go ahead efficiently while mesh installation is a manual operation A recent survey of roadway development practices has identified a need for an alternative to steel mesh, the installation of which can be automated Automation, along with automatic bolting, will remove personnel from the face area and allow greater rates of roadway development

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Polymer Skin Properties Cure Characteristics - sets in a few seconds and can be bolted through Mechanical Properties - tough with some flexibility - adheres to strata to provide additional reinforcement Flow Characteristics - spray viscosity, followed by rapid viscosity increase (cure) immediately after application to avoid slumping Fire Retardant & Anti-static Environmental & OH&S Issues - no toxic or irritant emissions before, during or after cure

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Occupational Hygiene - effect of components and product on humans - consult an occupational hygienist with coal mine experience - improve understanding re Section 63 approval process Other Issues & Current Work

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Approval for Underground Testing (Section 63) Use of polymeric materials underground requires approval under Section 63 Range of tests required for LOBA approval (Germany), followed by further testing at MSTC (Thornton) Can take 2-4 years to obtain approval Most requirements are relevant to use of urethanes Negotiations initiated with DPI to establish appropriate approval regime Determination of airborne emissions during spray/cure - Headspace test - Wind tunnel spray tests Other Issues & Current Work

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 To GC-MS Sample (2g) 8cm Only one material is of OH&S and environmental concern Headspace Emissions Test

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Fan Unit Air “Straightener” Tunnel Wind Tunnel Spray Test

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Spray Chamber Filter Monitor Chamber Wind Tunnel Spray Test

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Concrete Pavers Spray Gun Wind Tunnel Spray Test

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 First test conducted with minimum permissible air velocity (0.5m/s) to simulate worst-case mine ventilation scenario Air samples collected: * During spray * Immediately after spray * After one further hour whilst maintaining ventilation in the tunnel Successfully sprayed and cured a developmental formulation No reinforcement included Minimal odour detected Quantification of off-gases Wind Tunnel Spray Test

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Lab-scale testing - odour test (wind tunnel) - combustion products - temperature increase of sprayed material when curing - methods for introduction of reinforcement - product optimisation Laboratory pilot-scale tests - application of fully-optioned product - proposed to build test gallery at UoW - includes pilot testing of automation options Final pilot-scale tests conducted at Londonderry - spray using reinforcement - mechanical properties - emission data Future Work

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Conclusions A polymeric alternative to steel mesh offers a number of advantages: * Can be coupled with automatic self-drilling bolts * Entire roadway support process can be automated * Manual handling of mesh can be eliminated * Roadway development rates can be increased We have demonstrated that a viable polymer-based alternative to steel mesh, that can be applied automatically, can be developed

Faculty of Engineering University of Wollongong Roadway Development Operators’ Workshops March 2009 Acknowledgements University of Wollongong Research Council ACARP Anglo Coal Australia Pty Ltd Austar Coal Mine Pty Ltd BHP Billiton Illawarra Coal Ltd BMA Coal Operations Pty Ltd Gary Gibson and Associates Gujarat NRE Pty Ltd Helensburgh Coal Pty Ltd Oaky Creek Coal Pty Ltd Rio Tinto Coal Australia Pty Ltd Springvale Coal Pty Ltd Xstrata Coal NSW Pty Ltd