MICEMICE MICE timing and RF phase measurement CM33 Glasgow 25 th – 29 th June 2012 P. J. Smith on behalf of the RF group.

Slides:



Advertisements
Similar presentations
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
Advertisements

MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
1 EMCal & PID Rikard Sandström Universite de Geneve MICE collaboration meeting 26/6-05.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
DEVELOPMENT OF A READOUT SYSTEM FOR LARGE SCALE TIME OF FLIGHT SYSTEMS WITH PICOSECOND RESOLUTION Considerations and designs for a system of tdc’s with.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Yu. Artyukh, V. Bespal’ko, E. Boole, V. Vedin Institute of Electronics and Computer Science Riga, LATVIA 16th International Workshop on Laser.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
Magnitude and Phase Measurements
MICEMICE MICE timing and RF phase measurement Parallel Session CM33 Glasgow 25 th – 29 th June 2012 P. J. Smith.
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Andreas Horneffer for the LOPES Collaboration Detecting Radio Pulses from Air Showers with LOPES.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Muon- RF Phase Determination K Ronald, Strathclyde Contributions from many MICE: Tim Stanley, Chris Rogers, Rutherford Lab, Yordan Karadzhov, Geneva, Paul.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M35 Avanex lead Description of Work –Establish test bed suitable to validated the optical.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
MICE CMPB Alain Blondel 1 Highlights on MICE.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
WP5 – Wirespeed Photonic Firewall Validation Start M27, finish M41(tbc) CIP now lead Description of Work –Establish test bed suitable to validated the.
The Lead Glass Detector Overview, Experience and Direction.
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
EAS Time Measurements P.K.Mohanty (On behalf of the GRAPES-3 Collaboration) 5 th Workshop on AstroParticle Physics, 14 – 16 December 2010 at CRL, Ooty.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Design of a direct conversion 200 MHz non-IQ scheme using the Dimtel LLRF4 card Bob Anderson.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
The RF Phase Determination for MICE Alexander Dick For the MICE RF Team.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
RF acceleration and transverse damper systems
The Search for Accurate CDM Waveforms
Phase Feed-Forward Piotr Skowroński (CERN)
CLAS12 DAQ & Trigger Status
Jean-Sebastien Graulich, Geneva
Progress on the MICE LLRF System
Igor Mandić1, Vladimir Cindro1, Gregor Kramberger1 and Marko Mikuž1,2
Low Level RF Status Outline LLRF controls system overview
NanoBPM Status and Multibunch Mark Slater, Cambridge University
New PSB beam control rf clock distribution
Low Level RF Status Outline LLRF controls system overview
Electronics for the PID
Breakout Session SC3 – Undulator
Presentation transcript:

MICEMICE MICE timing and RF phase measurement CM33 Glasgow 25 th – 29 th June 2012 P. J. Smith on behalf of the RF group.

MICE Contents 1) The Timing Problem 2) RF Review 3) Proposed Solution 4) Simulations 5) Assembling a Test-Bench 6) Plans 26/6/2012P.J.Smith - University of Sheffield2

MICE The Timing Problem Muons travelling through the MICE channel will arrive at the cooling channel randomly within the MICE spill gate period. Because it is not possible to synchronise the operation of the RF cavities to individual muons the first RF cavity could be at any phase as the muon traverses through it. The relative phase angles between all eight cavities should be well known [i.e. Control] but we will still want to measure these phase angles directly [i.e. DAQ]. The amplitude of the Electric Field in the cavity should also be well known [i.e. Control] but it may decay during the spill. We will want to measure the Amplitudes within the cavities. [DAQ] The purpose of the RF DAQ is to establish both what the E phase angle and the E amplitude was within a given cavity when a muon traversed through it. 26/6/2012P.J.Smith - University of Sheffield3

MICE Constraints We’re working with the following assumptions: The amplitude must be known to 1% - The amplitude may decay over time as the RF power is obtained from capacitor banks. The phase of the cavity must be known to within 5 degrees as the muon traverses through it. At MHz period = 4.97ns => 5 deg = 69 ps. After discussing this with the analysis group last week it appears that this measurement error is absolute. i.e. We have a RF Timing error budget of +/- 69 ps with the DAQ 26/6/2012P.J.Smith - University of Sheffield4

MICE RF Review An RF review was held at Daresbury Laboratories on the 16/17 th April 2012 to discuss many aspects of the RF system, most of which I won’t discuss here! Of relevance (to this talk!) was the discussion of how to solve the timing problem as described on the previous slide. A couple of solutions were presented with the favoured one essentially accepted as being the way forward, with some advice given by experts present at the meeting. 26/6/2012P.J.Smith - University of Sheffield5

MICE Outline of the Proposed Solution Digitiser 500Ms/sec – 8 bit pm Pm = Phase Monitor Discriminator TDC 116 Amplifiers Reference Oscillator 26/6/20126 pm TOF Trigger TOF signals TDC DAQ PC VME Controller VME CRATE 4616 Amplifiers Diagram shown is for four RF cavities. Electronics to be replicated for eight

MICE Discriminator - Function A fast discriminator (level/zero crossing/fraction) will provide a series of timing pulses that would provide a mechanism to lock a given phase value of the RF to the TOF triggers. By logging these triggers in a TDC synchronised to the TOF TDCs we should be able to time correlate the phase of the RF to events registered by the TOF TDCs. With this information it should be possible to reconstruct what the phase of the RF was when the muon traversed a cavity. Note: This is a composite Image of LF Sine Wave (Few MHZ) with a discriminator to demonstrate the principle of generating regular timing pulses from the RF. 26/6/20127

MICE Digitisers – Why? The digitiser is primarily being used to measure the amplitude of the RF signal at the cavity itself but this isn’t the only way in which this could be done. For example the amplitude of the RF signal could be measured through the use of a peak detector. It is clear that the digitiser will provide additional information on the form of the signals at the cavities themselves that would not be apparent using a peak detector. Would this be useful? I think there are a number of modest reasons that suggest using a digitiser would be the better option to consider at this stage. What happens if there is a systematic drift/error in the peak detector electronics? The peak detector relies on the equivalent of a few sample points, (i.e. signal peak) whereas the digitiser will have many points to fit to and so would be more immune to any noise or interference. This may/may not be a problem. Any output from a peak detector (analogue or digital) is effectively digitised anyway. Would it be easier to apply subsequent ‘corrections’ to a fit than it would be to a single value? Assume 500Ms/sec, 50ns sample time per muon, 100 muons per sec – 2.5kB per spill – (150MB per day?) so data rate is not an issue. 26/6/2012P.J.Smith - University of Sheffield8

MICE Digitisers - Function By digitising the output monitor from the first cavity in each bank of cavities during the time-of-flight of a muon through MICE we would end up with a short record of the cavity signal during this period. A fit to the digitisation would permit the amplitude of the RF signal to be determined. This may also provide a mechanism to provide a second check on the delta t of the discriminator timing (i.e. the possibility of reducing discriminator jitter) although more study is needed here. The digitisation process is to be controlled by TOF events. 1) High Res Master – Note Exponential Decay is Exaggerated. 2) Same Plot with noise added where 1σ = ) Master Plot digitised, 8 bit 5Gs/sec – noise added as 2) 4) Fit plotted to digitised sample. Fit parameters are then compared with 1) SIMULATED 5Gs/sec with white noise

MICE Digitisers - Function 1) High Res Master – Note Exponential Decay is Exaggerated. 2) Same Plot with noise added where 1σ = ) Master Plot digitised, 8 bit 5Gs/sec – noise added as 2) 4) Fit plotted to digitised sample. Fit parameters are then compared with 1) SIMULATED 5Gs/sec with white noise Fitted Phase Error at 5 Gs/sec, 8 bit digitiser with significant noise. Same Simulation showing fitted Amplitude Error.

MICE Digitisers - Function Given that the RF signals should be clean, digitisation at a relatively low sample rate, i.e. greater than the Nyquist Rate (2 x frequency), over several cycles should be sufficient to reconstruct the RF wave to within a few ps accuracy. We are initially going to try at 500 Ms/sec as we are able to borrow a VME card that can sample at this rate. 1126/6/2012P.J.Smith - University of Sheffield The phase accuracy is very sensitive to sample rate over a 30ns period. 5 degrees = 70psAmplitude ~1% I wanted to rerun this simulation with low noise at 500Ms/sec this weekend but I wasn’t entirely happy with output – Suffice to say that the amount of acceptable noise with 500Ms/sec (Signal noise plus jitter) needs to be small at this sample rate to get the necessary resolution.

MICE Assembling a Test-Bench We’ve spent a significant amount of time and effort putting together a test bench at Sheffield. We’re getting there… 1 GHz Scope. Sign Gen - Borrowed one but has had to be returned. 500Ms/sec digitiser VME module - On loan from EMR. 25ps TDC VME - On loan from TOF. VME Crate – Borrowed one from RAL but it is damaged – We need another. VME Link. PC. Discriminator - 100MHz CF/ZC/level but will probably require a new one >200MHz. Software – To Discuss with Yordan. 26/6/2012P.J.Smith - University of Sheffield12

MICE Plans Once we have a full test bench it will be easier to plan a full schedule of the work. At the moment I’m spending some time (when I can prise Ed away from it!) with the new scope familiarising myself with it and seeing how accurately I can measure cable delays/phase differences. In the immediate future I wish to do the following: 1) Bench testing the phase monitors (evaluation boards from Hittite on loan from DL) 2) Bench testing the discriminator and evaluating the requirement for a faster one! 3) Setting up the software to talk over the VME and establish communication with the TDC and digitisers. 4) Feeding back what we find into the simulation to try and get a better model. However all of this does require a complete Bench Test Setup which remains my priority. Hopefully we will be in a better position to report a more detailed plan by the next CM. 26/6/2012P.J.Smith - University of Sheffield13

MICE Conclusion We have established a method of tackling the RF timing problem for MICE and have a clear way forward – good agreement amongst experts on the method at the RF workshop. We have some simple simulation models that have pointed us in the direction as to what specification of hardware we need. We are in the process of setting up a test-bench at Sheffield to make some measurements on the proposed hardware to see what performance we can actually achieve. Obtaining a fully functioning test bench is our current priority. Although we have a good outline of what we want to achieve the ‘Devil will be in the detail’. The construction of the test bench and some initial testing will drive the subsequent detailed plan for the RF timing. We hope to be much closer to this by the next CM. 26/6/2012P.J.Smith - University of Sheffield14