1 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Module Approval Explained 04/18/02 Jeffrey Schiffer.

Slides:



Advertisements
Similar presentations
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD RF Exposure and Modular Equipment Considerations.
Advertisements

Note: Third Party Brands and Trademarks are Property of Their Respective Owners. ACPI Overview.
Using MapuSoft Instead of OS Vendor’s Simulators.
FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
Integrated Project – EC FP AspireRfid Solution Deployment Best Practices (beyond RFID Software and Middleware) ASPIRE Consortium Advanced Sensors.
Terminal Quality Management Overview 2010
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
A new Network Concept for transporting and storing digital video…………
Tri-Band RF Transceivers for Dynamic Spectrum Access By Nishant Kumar and Yu-Dong Yao.
ACB Module Assessment and Integration FCC and IC Michael Derby ACB Europe7 April
5/9/2015TCB Council1 TCB Sharing of FCC KDBs Michael Derby TCB Council Chairman 9 th April 2014.
Amateur Radio on the International Space Station (ARISS)
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Slide 0 National Spectrum Managers Association Unlicensed Devices – An Update Mitchell Lazarus May 22, |
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD How to Create a Part 15C Report.
Wireless Fundamentals Chapter 6 Introducing Wireless Regulation Bodies, Standards, and Certifications.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
Wireless networking technology By Abbas Izadpanah January 2007.
T24 Wireless Telemetry Advanced Intelligent Instrumentation.
2 R&R Subaward Budget Attachment Form Use for detailed budget from any consortium grantee only when the prime is submitting detailed budget Do not use.
CWG2 on Tools, guidelines and procedures Licensing Adriana Telesca on behalf of the CWG2 December, 5 th 2014.
Intel ® Research mote Ralph Kling Intel Corporation Research Santa Clara, CA.
Presented to: Name of Customer Enhanced MET ONE 3400 Series Portable Airborne Particle Counters.
TCCA Aircraft Certification
The influence of PCI upon retail payment design and architectures Ian White QSA Head of UK&I and ME PCI Team September 4, 2013 Weekend Conference 7 & 8.
Doc.: IEEE /211r2 Submission September, 2000 Jeyhan Karaoguz, Broadcom CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal.
SENIOR DESIGN 11/6. Lab update (time, difficulty) Writing update (interest)
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
Doc.: IEEE COEX-02/011r0 Submission March 2002 Jim Lansford, Mobilian CorporationSlide 1 Simultaneous Transmission: Some comments from FCC Jim Lansford.
Doc.: IEEE /0045r0 Submission July 2009 Fanny Mlinarsky, Mimi TamSlide 1 Need for Coexistence Certification Testing? Notice: This document has.
Firmware Storage : Technical Overview Copyright © Intel Corporation Intel Corporation Software and Services Group.
1350 TAC Training © 2000, Cisco Systems, Inc. Cisco Aironet 350 Series Product and Software Update WNBU Technical Marketing.
CommunicationElectronics Principles & Applications Third Edition Chapter 6 Radio Transmitters ©2001 Glencoe/McGraw-Hill Louis E. Frenzel.
International Telecommunication Union New Delhi, India, December 2011 ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Philip.
Doc.: IEEE /tbd Submission March/2006 Pertti Visuri, Airgain, Inc. Over the Air Testing - Comparing Systems with Different Antennas Notice: This.
Doc.: IEEE /0014r0 & /0425r0 Submission March 2007 Rich Kennedy, OakTree WirelessSlide 1 RR-TAG Liaison Report Mar07 IEEE
Cognitive Radio: Next Generation Communication System
Doc.: IEEE /1171r0 SubmissionRich Kennedy, MediaTek Summary of FCC Administrative Changes Proposed in NPRM FCC Date: Authors:
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
Forced firmware lockdown? Christian
March 14, 2002 (revised 2/13/2002) 1 Version of CISPR 22 used in the United States by the FCC William S. Hurst Office of Engineering and Technology Federal.
Doc.: IEEE /0651r0 Submission May 2006 Royce Fernald - Intel CorporationSlide 1 Video Delivery vs. Attenuation in a Conducted Environment Notice:
Designed for the Telecom Industry and built on a Mobile Computing Platform Asset Tracking & Network Lifecycle Management.
Doc.: IEEE /0132r1 Submission March 2006 Dr. Michael D. Foegelle, ETS-LindgrenSlide 1 Traceable OTA Performance Testing Presentation Notice: This.
Doc.: IEEE /1417r0 Submission November 2012 Rich Kennedy, Research In MotionSlide 1 IEEE Regulatory SC San Antonio Closing Report Date:
Doc.: IEEE /0176r0 Submission Jan 2013 Bo Sun, ZTE/CWPANSlide 1 Date: Presenter: Proposal of Channelization for aj.
17/03/2016 Summary of FCC’s RF Exposure Proceeding Presented By: Bill Belt, TIA 1GSC-9, Seoul SOURCE:TIA TITLE:Summary of FCC’s RF Exposure Proceeding.
W2UC: Union College RF Repeater for Amateur Use
Accurate  Consistent  Compliant Contact: i4i the structured content company the structured content company.
India Comments on EPPR-16-05e Proposal for a new global technical regulation on the measurement procedure for two- or three-wheeled motor vehicles with.
Radio Equipment. Review: On the Transmitter Side The purpose of radio communications is to transfer information from one point to another. The information.
Doc.: IEEE Submission March 2009 George Cavage, iControl Inc.Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE a Submission November, 2003 CRL-UWB ConsortiumSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Korea University Ubiquitous LAB. Chapter 11. RFID peripherals Ph.D Chang-Duk Jung.
Standards and Regulations Team Daedalus. Standards and Regulations 1.FCC – Part 15 2.Advanced Encryption Standard Description Prescriptions and Standards.
KBC Networks 2010 Fibre optic Wireless Broadcast Network Transmission Welcome.
Radio Frequency (RF) Safety When Working Near Cellular Antennas
FCC Regulations for Spread Spectrum Devices
RAILWAY TRACK SNAP NOTIFICATION
21 September 2018 Project IEEE: Networks (WPANs) IEEE P Working Group for Wireless Personal Area Submission Title: [Multi-gigabit wireless demonstration.
Power Consumption Measurement
Radio Frequency Interference
Manual Robotics ..
Project: IEEE P Working Group for Wireless Personal Area Networks
Traceable OTA Performance Testing Presentation
February 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Initiative to enable to operate.
RR-TAG Liaison Report Mar07 IEEE
ETSI Contribution to 3rd Meeting of EC Expert Group on RRS
Presentation transcript:

1 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Module Approval Explained 04/18/02 Jeffrey Schiffer

2 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Agenda Background Existing Module Approval Status Details of the Requirements Proposed Changes Single Device Approval Industry Consortium

3 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Background Before the Module Approval process –ALL intentional radiator implementations need to be individually “type” approved. –This is a large burden to OEM’s (each instantiation must be individually approved), and also to the regulators that need to process the applications –Translates directly to a TTM and cost issue

4 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Present Regulations The FCC released (6/26/00) Public Notice DA , governing Part 15 unlicensed Modular Transmitter approval The process has been incorporated in the R&TTE requirements (EU) The Japanese MPT are currently reviewing the process The FCC regulations have been sent to China, and further discussions are required

5 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Modular Approval Full Modular Approval is for compliance with ALL 8 of the requirements Limited Modular Approval is available as a sub-set compliance with the “Grantee” retaining control over the final installation of the device (this includes liability) The FCC is concerned with Transmitters, not receivers (exception is scanning receivers)

6 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Factors to Consider Unit needs to be a complete transmitter –Reference Oscillator “on-board” –Antenna –The only connectors power supply Modulation/data inputs Comply with RF Exposure requirements The Grant holder is responsible for compliance of the module in its final configuration

7 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners The Requirements 1.Must have its own RF shielding 2.Must have buffered modulation/data inputs (concern is over-modulation and excessive data rates) 3.Must have its own regulator to control output power and sideband splatter 4.Must comply with antenna requirements Section , Either be permanently attached or have a unique connector. Antennas need to approved with the module. Additional antennas can be added with a Class II permissive change.

8 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners The Requirements 5.Must be tested in a “stand-alone” configuration. Non battery operated devices need to meet AC line conducted requirements (Section ) 6.Must be labeled with its own FCC ID, if inside then System need copy of label (Contains FCC ID: xyzmodel1) 7.The device must comply with any specific rules of operating requirements, (transmit timing requirements, etc.). Instructions for compliance need to be submitted. 8.Must comply with applicable RF exposure requirements.

9 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Proposed Radio Architecture PA D/A */* M LO DET. BasebandHardware Protocol Software ## PlatformComponents F ref or F ref Ant ## AFE / Up-converter ## Platform ## Grant components

10 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Module Approval for Programmable Network Radio DA Proposed Implementation 1) Fully Shielded UnitNo Change 2) Buffered Modulation InputsSeparated from Module 3) On-Board RegulatorNo Change 4) Comply with Antenna Requirements ,4 No Change 5) Independently TestedNo Change 6) LabelingFollow SDR recommendation 7) On-Board Reference Osc.Change * (Future) 8) Comply with Applicable RF Exposure Requirements No Change The following list compares the proposed architecture to the current FCC - Modular Approval Process:

11 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Single Device Approval Several technologies advancements have occurred allowing radio integration to be adopted for high volume cost wireless applications. Vendors are providing modular solutions for the PC platform with differing levels of radio integration.

12 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Single Device Approval LTCC Technology ( Low Temperature, Co-fired Ceramic) Allows high integration of radio components by embedding passive devices within substrate. Generates dramatic cost savings. Extends low loss behavior to an operating range beyond 40Ghz. Crystal component is too large for LTCC integration. Proposal –Change MA to allow Module/device without an integrated crystal to be approved. –Grant would be for; Module/device, Antenna, and Crystal plus load capacitors.

13 ® Intel Labs ® Slide No. *Third party brands and names are the property of their respective owners Industry Consortium Intel was asked by the FCC to head an Industry Consortium to disseminate information on building compliant solutions The FCC supplied initial contact names with a first group meeting beginning of March. The Consortium will have 3 focus areas: –Modification of the Module Approval process for SW Radios –Harmonization of the Module Approval process world wide –Providing industry guidance on building compliant systems