10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s.

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

EMS Checklist (ISO model)
Elective module 3 Geospatial environmental management
Environmental Management System (EMS)
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
Quality in Energy Management An introduction to ISO A presentation for the CQI, North London Branch Westminster Business School - 25 April 2013 Sarah.
Corporate Responsibility and Ethics in the Global Supply Chain affecting Kenya The role of CSR Codes of Conduct How can we use this development proactively?
Safety and Health Management Program
MINISTRY OF DEVOLUTION AND PLANNING. M&E DEPARTMENT WELIME Using Technology in Monitorin g and Evaluation (e-ProMIS)
NCS International The ABC‘s of Safety Management Systems – A Simplified Approach Presenter: Ian Ackland BE MBA FIEAust MEIANZ MSIA.
Tomas Pivoras - EMS experience1 Environmental management systems – experience from Lithuania Tomas Pivoras Kaunas University of Technology.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
Environmental Management Systems Refresher
ISO EMS CONTRACTOR OVERVIEW May /26/10ISO EMS CONTRACTOR OVERVIEW TRAINING ISO EMS OVERVIEW TRAINING Contents What is ISO
Regulatory Body MODIFIED Day 8 – Lecture 3.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Hazard Analysis and Critical Control Points
1 Getting Beyond Compliance With Safety, Health and Environment Management Disclaimer: These safety materials, resources and PowerPoint ® presentations.
CSR and Business Performance KPIs Claus Aabling Advisor, Business Development and CSR.
WHS Management Plans.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Fraud Prevention and Risk Management
SUSBIZ Kenya Time plan and detailed activities, 2011 – 2013 Claus Aabling, Advisor, Business Development and CSR.
Corporate Social Responsibility- do we need a Statutory Instrument? Presented to the Zambia Alternative Mining Indaba conference- July 17, 2013 Sombo Chunda,
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
Introduction to ISO International Organization for Standardization (ISO) n Worldwide federation of national standards bodies from over 100 countries,
Comparing Apples with Apples The Value of Environmental Management System Certification Kim Kelleher.
Implementation of ISO 14001/OHSAS TMS Consultancy Ltd.
‘Developing the appraisal process in the wider context of the Sport and Fitness sector of Higher Education’. Welcome & Introductions.
CSR Summit – Belief / Action / Results Scott Delzoppo October 31, 2007.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
May 8, 2012 MWP-K Learning Event Monitoring, evaluation, and learning (MEL) framework for the Millennium Water Program, Kenya.
Learning Objectives LO5 Illustrate how business risk analysis is used to assess the risk of material misstatement at the financial statement level and.
CSCP, UNEP, WBCSD, WI, InWEnt, UEAP ME Life Cycle Management Navigator: 14_PR_CR 1 The Life Cycle Management Navigator Corporate Reporting Training Session.
ISO GENERAL REQUIREMENTS. ISO Environmental Management Systems 2 Lesson Learning Goals At the end of this lesson you should be able to: 
Environmental Management System Definitions
Chemistry making a world of difference Responsible Care ® - Thrusts in Europe Dr Richard Robson Cefic Director APRCC, Manila, Philippines 17 th November.
Preventive Emergency Planning Emergency Plans should focus not just on response but on reducing risk Emergency Planning that focuses on risk should consider.
Programme Launch Panafric Hotel 1. September 2011.
Environmental Management System (EMS) Development For Pork Producers September 13, 2001 Barb Satler Pork EMS Project Coordinator NC Division of Pollution.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
SAICM preparations towards International regulation of chemicals = dismal pace. Example, the asbestos in all its forms, is no fully listed.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
Quality Circle and 8 D Methodology Dr. Mohamed Riyazh Khan - DoMS.
Support the spread of “good practice” in generating, managing, analysing and communicating spatial information Evaluating and Reflecting on the Map-making.
Environmental Management System Implementation. Practices, Aspects, Impacts- Concepts Mission Resource Impact Resource Impact Activities/ Operations Practices.
Visit us at E mail: Tele:
©2009 Rainforest Alliance Rainforest Alliance training Kenya (tea) -Factory version-
SAFETY AND HEALTH IN OIL GAS EXTRACTION NAHUEL IVAN CASTILLO 2015.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
S3.1 session day 5 2 Programme management download resources from Approved by the Advisory Group: Programme management Programme and project.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
IMPLEMENTING LEAPS IN CENTRAL AND EASTERN EUROPE: TRAINERS’ HANDBOOK Monitoring and Evaluating Results.
CDM Construction Design and Management
C184-2 Decent Work for All ASIAN DECENT WORK DECADE Tsuyoshi Kawakami ILO SafeWork ILO Guidelines on OSH Management Systems (ILO-OSH 2001) -
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
APPLIED SAFETY & HEALTH Samuel Nii Tettey (Ergonomist)
DoD Lead Agent: Office of the Assistant Secretary of the Army (Installations and Environment) Department of Defense Voluntary Protection Programs Center.
Chapter 1 Human Resource Management and Competitive Advantage
PowerPoint to accompany:
Discussion of CRVS strategies
Environmental Health and Safety (EH&S) Supplier Awareness Training
Our New Integrated Business Management System [“IMS”]
Importance of Law and Policies in the Environmental Management System
Basic overview of an EMS
The PDCA Cycle.
EICC/GeSI focus: Corporate Responsibility
Risk Management NDS Forum June 23rd 2010.
ISO 45001:2018 The importance of a Safety Management System
Presentation transcript:

10/08/20151 Managing CSR implementation Henning Høy Nygaard, SUSBIZ Kenya Danish Federation of SME’s

10/08/20152 Agenda Ensuring a continuous process – introducing the ’Plan-Do-Check- Act’ Cycle Working with action plans as a continuous process Communicating about action plan achievements

10/08/20153 The ’Plan-Do-Check-Act’ Cycle (

10/08/20154 The ’Plan-Do-Check-Act’ Cycle – cont.  The model provides a framework for the improvement of a process or system  It can be used to guide the entire improvement project, or to develop specific projects once target improvement areas have been identified  The PDCA cycle is a dynamic model  The completion of one turn of the cycle flows into the beginning of the next

10/08/20155 The ’Plan-Do-Check-Act’ Cycle – cont.  Plan: You analyse what you intend to improve, looking for areas that hold opportunities for change  Do: You implement the change you decided on in the plan phase  Check: After you have implemented the change, you check whether you have achieved the desired results, and assess what was learned and what went wrong  Act: After planning, implementing and monitoring a change, you must decide whether to continue that particular change. If it consumed too much time, led to no improvement etc., you may abort the change and plan a new one. However, if the change has led to a desirable improvement or outcome, you may consider expanding the trial to a different area. This sends you back into the plan phase of the cycle

10/08/20156 The PDCA Cycle and action plans Needs assessment Needs assessment report Action plan (implementation process outline, indicators, responsible person(s), deadline) Implementation of activities, training and assistance Measurement of results against indicators in action plan Corrective actions Expansion of action plan

10/08/20157 ‘Plan’ phase Needs assessment Needs assessment report Action plan (implementation process outline, indicators, responsible person(s), deadline)

10/08/20158 Needs assessment report IssueFindings Emergency managementEmergency management system is not in place in the production area. There is a risk of fire for which the company has already been advised to introduce safety mechanism.

10/08/20159  Labour Standards (wages, working time, social security, worker involvement, communication and training)  Management and Production Planning (supply chain management, lean management)  Health and Safety (ergonomics, ventilation/ heat, dust, emergency preparedness, handling of chemicals)  External Environment (energy savings, pollution prevention, waste water, solid waste) Action plan - Content

10/08/ Action plan

10/08/ Action plan – cont.

10/08/ ‘Do’ phase Implementation of activities Training and assistance

10/08/ Implementation of activities

10/08/ ‘Check’ phase Measurement of results against indicators in action plan

10/08/ Measurement of results against indicators in action plan Measurement of results

10/08/ ‘Act’ phase Corrective actions Expansion of action plan

10/08/ Modified activities Expansion of action plan Corrective actions

10/08/ Action Plan follow-up visit

10/08/ CSR communication Communication