C A N F O R C O R P O R A T I O N PAGE 1 NAME_2009 Canfor Fuel Management Guideline and Spill Preparedness and Response Training.

Slides:



Advertisements
Similar presentations
Emergency Preparedness and Response
Advertisements

East Carolina University Compressed Gas Safety Training Program
Forktruck LP Gas Safety
State of Oregon, DAS Fleet Fuel Island Operations - Diesel.
Annual Evaluation of the Environment of Care (EOC) Program
 The Federal Clean Water Act specifies the requirements for SPCC Plans  The Code of Federal Regulations 40 CFR 112 details requirements of the SPCC.
Spill Prevention Control and Countermeasures (SPCC) Training.
Safety Procedures.  Become familiar with:  Briefings – pre-operational and post operational  Communications  Hazardous Material Safety Data Sheets.
Hazardous Substances. Employer’s Responsibility Every employer has a duty to ensure that their employees and others are not exposed to risks to their.
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Fleet Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental.
Note To Management This training program is designed to inform management of the requirements of the Hazard Communication Program. This training program.
New Pig PRESENTS. 7 STEPS FOR SPILL RESPONSE ASSESS THE RISK SELECT PERSONAL PROTECTIVE EQUIPMENT CONFINE THE SPILL STOP THE SOURCE EVALUATE INCIDENT.
Contractor Safety Management
FIRE SAFETY TRAINING THE LOSS PREVENTION UNIT OF THE OFFICE OF RISK MANAGEMENT.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
2.01 Understand safety procedures
SPCC Training Presented by: George S. Gamble, PE
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Spill Prevention and Response Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 8/17/
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
BRC Food Safety Quality Management System Training Guide
Steps for cleaning up a chemical spill
Safety Unit II.
/0503 Copyright ©2005 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Hazardous Materials Transportation 49 CFR BLR’s.
Planning, First Aid and Working Conditions Section C of the Forest Activities Code.
Storm Water Pollution Prevention Training
Release Reporting. Lesson #17 - Release Reporting How Do I Know If I Have a Leak in My UST System?
Subpart D Hazard Communication These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for.
ISO OPERATIONAL CONTROL
Shop Safety and Operations
Safety Training Presentation
Hazard Communication Healthcare Workers. © Business & Legal Reports, Inc Session Objectives You will be able to: Understand chemical hazards Interpret.
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Tulsa Public Schools. Legal Responsibilities as a Science Teacher The science teacher has a duty to anticipate foreseeable dangers and take precautions.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
Uintah School District Hazardous Materials / MSDS Training
1 Hazardous Materials Standard DA122, Dental Materials.
Site Staff & Management of Contractors February 2013 e.g. Trade Windows Mansards Roofing (Hot Permit work) Electrical Work CJR Electrics or L Electrics.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Release Reporting. How Do I Know If I Have a Leak in My UST System? 1. Unusual operating conditions; such as, erratic behavior of the dispensing pump.
Revised Spring 2007 Hazard Communication And Your Right - To - Know Dept of Environmental Safety Services.
BC Timber Sales Fuel Handling A pictorial of key requirements of the BCTS FUEL HANDLING ENVIRONMENTAL FIELD PROCEDURE 06.
Spill Prevention, Control, and Countermeasures Training (SPCC) Plan
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
Key Sections of EFP-06 Truck Box (Slip Tanks) and other large portable tanks--230 to 3000 liters (EFP-06 Table #2 and #3) -non-specification tanks can.
Lecture (13): Hazardous Waste Management
Lock Out & Tag Out.
Energy Control (Lockout/Tagout)
BC Timber Sales Fuel Handling
ANNUAL ENVIRONMENTAL RETRAINING
Goodyear Napanee Contractor Safety
Flammable and Combustible Liquids
BC Timber Sales Fuel Handling
Instructions The Town of Sylvan Lake’s computer based health and safety orientation is simple process. Read each slide carefully To navigate through slides.
SQF ISO FSSC GMP Programs
Chemical Transfer.
Personal Protective Equipment
Safety is part of our culture at Halliburton
Oleh : Ir. Sjaifuddin Thahir, MSc.
® > SPILL RESPONSE > xxx xxx AS.
Chemical Purchasing.
BC Timber Sales Fuel Handling
Food Safety T-1150 This work has been produced by DGL (Aust) Pty Ltd
Vehicle & Equipment Maintenance/Cleaning
ENVIRONMENTAL, HEALTH & SAFETY POLICY
Presentation transcript:

C A N F O R C O R P O R A T I O N PAGE 1 NAME_2009 Canfor Fuel Management Guideline and Spill Preparedness and Response Training

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 2 Fuel Management Guidelines This training is designed for Canfor staff to be able to provide guidance to contractors in the requirements and the use of the Canfor Fuel Management Guidelines, including spill preparedness and response procedures. Fuel Management Guidelines were standardized as a FMG document in Spring of –Previously were division specific documents. The Fuel Management Guidelines is a controlled document. Verify that you use the most current version as posted on the FMG Sharepoint Website.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 3 Fuel Management Guidelines Designed as an inspection checklist for various container types/sizes and fuel types. Provided to facilitate the evaluation of fuel handling conformance with guidelines and compliance with legislative requirements for Canfor staff and all contractors that handle fuel, and for all Canfor staff who supervise contractors.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 4 Canfor Employee Responsibilities Canfor employees are required to follow the Guidelines when handling, storing, or transporting fuel. Canfor Supervisors are responsible for ensuring contractors are following the Guidelines. –When you check off on the prework and the inspection forms that fuel is “ok”, the fuel containers and tanks on site are to be conforming to the Fuel Management Guidelines. Ensure appropriate staff and contractors receive WHMIS, TDG, and spill Response training. Ensure appropriate Material Safety Data Sheets (MSDS) are available.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 5 Canfor Employee Responsibilities cont. Ensure all appropriate vehicles and equipment carry the required spill kit items and tools. Inspect petroleum and chemical handling and storage equipment including spill kits. Conduct and document periodic tests of spill preparedness and response as required. Canfor Supervisors are responsible for ensuring any required remedial action plans are entered into ITS and are being completed.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 6 Contractor Responsibilities Contractors are responsible for: –Understanding the Fuel Management Guidelines and applicable SWP’s. –Ensuring employees are trained in WHMIS, TDG and spill response. –Conducting regular inspections of all fuel containers and fuel tanks. Inspections are to be documented and kept on site of the fuel container or fuel tank. It has been suggested that inspections are kept with the associated fuel container or fuel tank. –Meeting or exceeding spill kit requirements.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 7 Contractor Responsibilities cont. Contractors are responsible for: –Obtaining and having available all appropriate Material Safety Data Sheets (MSDS). –Conducting and documenting periodic tests of spill preparedness and response. –Developing and implementing remedial action plans where deficiencies are identified. –Contractors are to make inspections available to the Canfor supervisor upon request.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 8 How to use the Fuel Management Guidelines Instructions are on page one of the Guidelines  Determine tank (container) size in litres;  Determine if the tank is used to transport fuel. I.e. The tank is moved when it contains more than 500 litres of fuel or greater than 5% of the tank’s capacity is remaining in fuel.  Determine the tank fabrication specifications and confirm they meet the appropriate fabrication standard listed on Page 6/7.  Select the page that corresponds with the tank size and assess the tank for: –Storage & Dispensing Standards –Transporting Standards if the tank is being transported.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 9 How to use cont.  Complete the appropriate checklists and action plans; submit to Canfor supervisor as requested for Canfor review, and follow-up.  Note: All references to Fire Extinguishers imply that they must be inspected and tagged on an annual basis by a licensed inspector.  Requirements specific to British Columbia are prefixed with “BC”. Requirements specific to Alberta are prefixed with “AB”

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 10 Standards, Specifications and Checklists There are two main standards that we need to comply with: –Transportation of Dangerous Goods regulations, and –Provincial Fire Code. The Guidelines are separated into sections based on: –Fabrication Specifications, –Storage and Dispensing Standards, and –Transportation Standards. Includes the requirements for propane.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 11 General Requirements for Small and Large Tanks Store and dispense fuel outside of any Riparian areas and in locations that are of low risk for collisions. Tanks, hoses and nozzles must be in good repair, and not leak. WHMIS label or appropriate product identification label is required. TDG labels must be attached to the tank when transporting fuel. Maintain current MSDS sheets. Smoking is not permitted during dispensing operations.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 12 General Requirements for Small and Large Tanks cont. Use dispensing pumps designed for the products being handled. Automatic shut-off nozzles must be used when dispensing fuel. Nozzles must be secured within drip containment or in an upright position when not in use. Maintain the required fire extinguisher when dispensing fuel. Maintain a spill kit of suitable size to contain fuel spills. Report Spills as per the Spill Response Procedures (Appendix 4 and EPRP) Recover spilled product by either removing contaminated soil or treating the soil on site.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 13 Truck Box Tanks less than or equal to 450 L – Diesel Tanks must be secured to the vehicle using a tie down mechanism that is rated at a level at or above the working load being secured. TDG label is 1202 for Diesel. There are no fabrication standards for tanks less than or equal to 450 L capacity.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 14 Large Tank Fabrication Specifications - Transportation Large tanks are tanks greater than 450 litres. Large tanks used to transport fuel (TDG Tanks) are required to meet fabrication specifications. Spec Tanks for transportation purposes are manufactured to a specific standard and have an attached nameplate. –UN Standard IBC –CGSB –TC 306/406 (CSA B620) Fuel Trucks These tanks require testing every 5 years and proof of testing. Tanks greater than 450 Litres that lack one of the above nameplates can not be used to transport fuel. Can not contain >5% fuel remaining when moved.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 15 Large Tank Specifications - Storage Spec Tanks for storage purposes only, have one of the following nameplates attached. –ULC-S601 AST Horizontal tanks –ULC-S602 AST Steel tanks –ULC-S630 AST Vertical tanks –ULC-S653 AST Steel tanks –API 12B/12D Bolted/welded These tanks require testing every 5 years and proof of testing. A non-spec tank is a tank greater than 450 litres capacity that lacks one of the above nameplates. Non-spec tanks can not be used for fuel storage..

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 16 What Auditors look for Tank specifications and conditions –Tanks, hoses and nozzles in good repair, free from rust, severe dents, and leaks. –Tanks > 450 L need required nameplates attached to be Spec Tank. Tanks without required nameplates are Non Spec Tanks and can not be used for fuel transport or fuel storage. –Proof of testing – 5 years for Spec Tanks. –Secondary containment in place if required. –Inspection reports / checklists completed and accessible. Deficiencies actioned.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 17 What Auditors look for Fuel spills –Have they been cleaned up or treated on site. –Reporting requirements met. Spill kits –Are they present, suitable sized and adequately stocked. –Spill kits must be more than 80% complete to meet the standards. –Knowledge in the use of spill kits and spill reporting requirements. Fire Extinguishers –Are they present and suitable size. –Are they charged and ready for use. –Have they been inspected in the past 12 months.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 18 Spill Response Procedures Details of the spill response procedures are outlined in the FMG EPRP booklet. Refer to the EPRP booklet when conducting spill response. Step 1. Ensure Safety First –Warn people in the vicinity, evacuate the area is necessary, –Enforce No smoking and extinguish any flame. Step 2. Stop the Product Flow / Prevent Fire –Act quickly but ensure personal SAFETY FIRST (use protective clothing), –Shut off pumps or other equipment, close valves etc., –Shut off motors, electrical circuits, naked lights, etc., in case the spill product is flammable.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 19 Spill Response Procedures cont. Step 3. Contain the spill –Block off drains, culverts, ditches. –Surround spill with earth, peat, straw, sand, booms, commercial absorbents. –Determine amount and type of product. –Be safe, take safety precautions as needed (use goggles, gloves, rubber boots, coveralls etc.) Step 4. Notify your Supervisor –For spills or petroleum that are greater than 50 litres –Chemicals (including antifreeze) greater than 5 litres –Any amount of petroleum or chemical that is spilled into water –Provide information per the Spill Reporting form.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 20 Spill Response Procedures cont. Step 4. Notify Supervisor cont. –Canfor Supervisor is to inform the applicable Operations, Silviculture, or Planning Manager for PEP (BC) or Alb Transport/Alb Environment (Alberta) reportable spills. –See the Fuel Management Guidelines or the EPRP for reportable amounts and contact information for government agencies to be contacted.

C A N F O R C O R P O R A T I O N NAME_2009 PAGE 21 Spill Response Procedures cont. Step 5. Commence Recovery, Clean up, Restorative Action –It is the responsibility of the person in charge of the equipment where the spill originated to clean up the spill. Involve experts as required. –All spills, including non-reportable spills must be cleaned up. “Clean up” means that the spilled product will be recovered/treated as much as possible. –The responsibility and expense for clean up and disposal of all contaminated materials resulting from contractor activities lies with the contractor. Step 6. Document Spill Incidents as required by FMS