Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, 2008 1 JLab Update Rick Nelson.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
1 Operating Experience and Reliability Update on the 5 kW CW Klystrons at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA.
PEP Super-B High Power RF Peter McIntosh SLAC Super-B Factory Workshop in Hawaii April 2005 University of Hawaii.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
THALES ELECTRON DEVICES
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
1 Availsim DRFS and klyClus setup, assumptions, questions Tom Himel August 11, 2009.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
RF Sources and Combiners Emma Wooldridge. 28th-29th April 2004Joint Accelerator Workshop Outline Very quick RF power overview RF power sources –Triodes.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
BIA’s Director Review, September Accelerator Improvements FY11-16 Fulvia Pilat.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
RF Power Upgrade at Jefferson Lab Rick Nelson*, Andrew Kimber * Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
CWRF 2008, Geneva, March Alessandro Fabris on behalf of the Elettra RF Group Sincrotrone Trieste, Trieste, Italy. Elettra RF System Upgrade:
Operational experience of high-power RF at Diamond Light Source
Ingot Niobium Workshop RF Sources Andrew Kimber 4 th December 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson Science Associates,
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
PAC Meeting, December 12, Prebys 1 The Problem.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
650 MHz Solid State RF Power development at RRCAT
ALBA RF Systems Francis Perez.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Booster High Power RF at PIP-II Era John Reid February 18, 2014.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
RF Power Klystrons & 20 Year Look R. Nelson 7/15/15.
Energy recovery in depressed collector of klystron operating in pulsed mode Mark Kemp, Aaron Jensen, Gordon Bowdon, Erik Jongewaard, Andy Haase and Jeff.
Cost Optimization Models for SRF Linacs
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Second SPL Collaboration Meeting, Vancouver May 2009
Chris Adolphsen Sergei Nagaitsev
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
DC Injector and Space Charge Simulation Status
BEPCII RF POWER SOURCE AND INPUT COUPLER
Jefferson Lab Low Level RF Controls
Accelerator Layout and Parameters
Regular cryomodule maintenance plans (radiation damage, seals, etc)
RF Power for C75 - Resources
Klystron Power Supplies for ILC
CEPC RF Power Sources System
Operations Department
RF Power for C75 - Resources
Operations Department
Performance Recovery at CEBAF
Linac LLP Outline LINAC Long Lead Procurements
RF introduction Anders Sunesson RF group leader
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, JLab Update Rick Nelson

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, GeV DOE Road to Upgrade is Critical Design Path CD-0 Formal Project Definition Phase (2004) CD-1 Approve PED Project Engineering/Design (2006) CD-2 Approve Performance Baseline (2007) CD-3 Approve Construction Start (expected 2008) CD-4 Approve Start of Operations (expected 2015)

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, GeV CEBAF 11CHL-2 12 Upgrade magnets and power supplies Path to 12 GeV Upgrade Existing Halls

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Major RF Changes Upgrade existing systems Add new higher power RF systems Upgrade existing systems for higher power Existing cryomodules are being refurbished –C50 (50 MV/m) result –Increase RF capabilities from 5 to 6.5 kW Take advantage of better cryomodule performance Retain original klystrons Upgrade to existing HVPS Add new RF zones –Ten C100 cryomodules (100 MV/m) –Ten new RF systems Includes new designs for high power and low level elements

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, VKL7811W Klystron History Originally: ~2 kW and air-cooled collector Modified for CEBAF: 5kW, water-cooled collector, modulating anode added JLab FEL: voltage increase, for 8 kW Voltage increase and cooling additions to tube for 10 kW (Stanford FEL & 1.3 GHz) This upgrade: only increase voltage & cooling VarianLitton/L3 CPI 10 kW

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Upgrade Existing Zones Increase voltage –11.6 kV to ~12.6 kV –A minimal cost upgrade (few k$ per zone) –Original power supply is delta-wye, 12-pulse supply (series-connected bridges) –Addition of simple boost supply Transformer & 6-pulse rectifier only –Components added in return leg (ground) Reduces transformer insulation requirements –Filter network unchanged Install klystrons recertified for 6.5 kW

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Boost Supply

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, New RF Zones Use the same general topology as before –1 klystron feeding one cavity –8 klystrons per zone 12 GeV HP RF project organized as three systems –Klystron –DC Power –Waveguide Main requirement change is for 13 kW device –IOT possible –Cost is a key factor –Budgetary pricing suggest IOT will cost more –IOT driver cost significant

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, New Zones

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Pounds… 5 Pound Bag It must fit existing available space –CEBAF was originally conceived as a 4 pass / 25 zone machine for 4 GeV –Built as 5 pass / 20 zone to save money –Linac buildings and tunnel were built for 25 RF zones –Upgrade will fill the empty slots New RF (10 zones) must fit same footprint –Larger klystrons

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Layout

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Layout

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, High Power RF Basic requirements are –13 kW CW –1497 MHz –Klystron or IOT Efficiency, cost, historical reliability –Driver cost could be significant –Previous lifetime experience is limited at other than UHF) A klystron design approach started with an SBIR –Expected to speed procurement process –Developed tube worked but was killed during test –Only 1 vendor of 4 was willing to build the design No money for early procurement as with CEBAF –Soliciting vendor interest in either Responses are due by next week For easier cost comparison, IOT must include driver amp

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, DC Power HV PS could be switcher or conventional (transformer/rectifier) Again, size may be a factor HPA / transmitter –Unlike before, not fully enclosed –Klystron rack (pedestal with 2 klystrons each) Contains aux supplies (filament – mod anode – ion pump) Instrumentation & interlocks –Must monitors & control all klystron signals Filament V/I, mod anode V/I, ion pump V/I, cathode I, body I, reflected power, interlocks… Data logging & fault capture Final design has been slowed until klystron details are known –Accurate mechanical drawings not possible –Klystron not yet available

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, HPA CEBAF original approach was to purchase from industry Original costing for 12 GeV was based on design & build Recent reevaluation of this approach suggest no change –This depends on vendor pricing –Latest vendor estimates are high Final design has been slowed until klystron details are known –Klystron not yet available –Procurement process has begun –Expect award this year –Design & build to –Purchased system –HPA Controller - Altera FPGA + PC-104 to EPICS 128 ADC 32 DAC 48 relay out 48 digital in

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Waveguide Systems WR650 waveguide exits down to CM in tunnel Original layout kept path lengths 1/2 λ multiples (no circulator) Layout is different with waveguide on one side only Two installed cryomodules use this layout Routing not as convenient as before, but possible

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Custom Pieces to Connect Up

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Issues Klystron not purchased, not designed –Final mechanical design difficult –Final operating voltages not known which affects many systems Estimated values are being used Based on SBIR outcome, some existing subsystems may work with modifications Possible change in acquisition plan from –Design & build, to purchased system –But, in-house design is ongoing –Ultimately choice will depend on vendor pricing

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, RF Power Systems Improving Efficiency: Options

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Reducing Operating Costs US labs are struggling with reduced budgets and rising costs Dealing with the shortfalls includes: –Reductions in operating time –Layoffs & early retirement –Deferred/reduced procurements (klystrons…) –Also look at reduce energy consumption Primarily large power users like CHL (cryogenics) and RF

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Reducing the RF Power Bill Turn off unused/unneeded RF zones Adjust supply voltage based on needs –Added autotransformer with tap switch for easier adjustment Adjust anode to reduce power consumption –Software solutions automatically optimized mode anode based on RF needs Good results, but operational difficulties –Recovering from trips may leave insufficient headroom to quickly restore beam –Not always running economized –Another possible solution is higher efficiency RF power sources –One possible bonus: more power with same DC voltage

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Efficiency Exercise History –Present klystron is ~ 33% efficient –Energy costs are rising Goal –Explore possibility of replacing existing devices with a higher efficiency device –Pay for a new device with a combination of money Already rebuilding and purchasing new klystrons Reinvest the money saved on power in a better device –Ultimately, replace all 340 klystrons with a new device over several years

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Ground Rules Present RF system consumes about 5MW –Klystrons provide 33% efficiency (at best) –A new design could reach >50% –Energy saving would ramp from 270kW to 1.6MW after 6 years Assuming RF runs 80% of calendar year, savings could be $516k/year (FY06$) 10-year savings of $7M (2006$, 15% real increase 2007 and 7%/year real increase out years) Cost of our present klystron roughly $25k –10-year breakeven would require tube cost of ~$34k (estimate for 13 kW solenoid tube estimate is higher) –Energy savings must offset higher costs of new device Problem: a new tube will likely not fit into our existing system without modification (~$50k/zone)… or maybe not at all –Replacing full system not in budget

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, More Ground Rules Most tubes would be replaced through attrition –Tubes are cheaper to rebuild than buy, but can’t rebuild indefinitely –New devices will cost more; up front cost / savings later –Anticipate $300k in repairs / $500k replacements annually of existing klystron Other significant restrictions –New device must be made to fit into existing hardware Avoid significant changes to present systems Minimize modification costs Must use existing HV PS (presently adjustable) Ideally should get us more power with same HV input (6.5 kW)

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Layout

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Layout

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, New Device: Klystron or IOT Vendor responses suggests –Solenoid focus (PM not practical) Add solenoid PS $$ Significantly larger –Won’t easily fit existing space $$$$ –IOT Smaller size could work depending on magnet structure 6.5 kW might be available at existing HV Add solenoid PS $$ Low gain = upgrade driver amp –From 2W to > 65W $$$ No IOTs built yet for GHz

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, No Obvious Winner Based on vendor info and constraints it seems unlikely an upgrade can be made –A new device will likely be too large to adapt to existing hardware –Expected costs don’t fit available budget At this point, no further action is expected and no changes are planned – unless other funding is found –DOE mandate with special funding?

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Mod Anode Update

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Mod Anode Control Mod anode is primarily used for two functions –Energy reduction at low power “Economize mode” under software control Iterative process to reduce power consumption but retain sufficient headroom for stable operation Tube protection –Used to reduce mod anode leakage current across HV ceramic –With software monitoring prevents catastrophic failure –Allows tubes to be used longer –Richard Walker will discuss this in more detail in his talk tomorrow

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Mod Anode Control

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Resistor Load Banks 11.6 kV / 168W 8 x 100k, 50 watt w-w Glastic type channel

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Resistors Are Easy 1.6 MegΩ, 11.6 kV (84 watts KMAV=0) 1 st choice would have been Kanthal/Globar/CESIWID –Resistance value at or beyond available –Poor performance for high ohm values Heat caused resistors to eventually open –Power Film Systems/Altronic Research, Yellville Arakansas PFS12-804CPL 300 watt, 40 °C ambient 12”x1” thin-film on ceramic core with glass Values to 20 MegΩ, 10 kV/in

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Performance to Date Old wire-wounds had run over a decade Some new resistors have degraded in < 2 years Physical (visible) changes were noticed Resistance changed

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27,

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27,

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27,

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27,

Thomas Jefferson National Accelerator Facility RF Power Systems / CWRF08 / March 27, Resistor Degradation 1.6 Meg has increased to 2.4 Meg and continues rising Vendor suggest corona damage –Eliminated power & temperature as an issue –Rated at 10 kV/in Other suggestions from vendor include –Coating problems Uneven thickness, inadequate overlap, glaze too thin Multiple production runs seem to exhibit similar symptoms –Modified units are presently being tested Increase glaze thickness Double metallize (sandwich) the connections Add silicone over-coating (Dow Sylgard ® ) Results aren’t in yet, but resistor not essential in most cases