MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ Review System Design Material ❖ Sub-System Design Review ▪Motor.

Slides:



Advertisements
Similar presentations
Landstown High School Governors STEM & Technology Academy
Advertisements

RACING WITH HYBRIDS PROPOSAL TO THE ESMSC Jean Jacques His, Ferrari Head of Powertrain Department 16/11/2010.
Introduction To Programmable Logic Controllers
Electro Mechanical System
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
R I T Advisors: Dr. Wayne WalterMechanical Engineering Dept. Faculty Jeffrey WebbTeacher’s Assistant Team Members: Aman Verma EE - Electrical Craftsman.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Team Mejor – The Spyder Critical Design Review -12/7/04.
M & M EE 296 Final Presentation Spring 2004 Presentation Overview Team Member Introduction Project Overview Overall Design Description Final Project.
Wind Instrument Testing Apparatus Project WITAP Team: Rob Koch Andy Lawrence.
Team 10 Air Conditioning Experiment Members –Sean Gallagher –Pamela McDowell –Brian Davison –Prathana Vanarath Sponsors –Dr. Wexler –Dr. Advani Advisor.
Airbag Automaton John Bailey Hattie Hiatt Chun Hau Low Jason Harwood Wayne Gallup Jason Canaday.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
There are four symbols that every competent EE must be able to manipulate with Consummate Skill: e j  $ Energy = $ Power = “Cash Flow” =
Chapter 19 Charging Systems.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Detailed Design Review ➢ Competition Benchmarking ➢ Mechanical ●Motor Mount & Baseplate ●Modular Cart.
Recruitment Info Session January 26 th, Agenda 2 The Team Our Goal Technical Organization Timeline Recruiting and Expectations.
Sponsor/Customer: Dr. Ferat Sahin Multi Agent Bio-Robotics Lab Faculty Guide: Prof. George Slack Team Members: Matthew LeStrange – Electrical Engineering.
Electricity Current Electricity.
Powertrain for RIT EV Team TT- Zero Race Bike R12900 Sean Harriman 5/20/2012.
Charging Dock & Power Control Sustainable Energy Systems for Education P The Portable High-Power Density Energy System project (P11401), which preceded.
1 DESIGN OPTIMIZATION OF A SOLAR RACE-CAR WITH ENERGY MANAGEMENT APPROACH O.Ustun, M.Yilmaz, C.Gokce, U.Karakaya, R.N.Tuncay İstanbul Technical University.
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
Power and Power Measurement ENGR 10 – Intro to Engineering College of Engineering San Jose State University (Ping Hsu and Ken Youssefi) 1 Introduction.
KAITLIN PERANSKI: IE, PROJECT MANAGER JEREMY BERKE: EE, SCRIBE/LEAD SOFTWARE CHRIS CAPORALE: EE, LEAD HARDWARE SPENCER WASILEWSKI: ME, MODELING/MACHINIST.
P16221 – FSAE Shock Dynamometer System Level Design Review September 29, 2015.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Project Background ❖ Project Summary ❖ Use Scenarios ❖ Customer Requirements ❖ Engineering Requirements.
EET 306 ELECTRIC MACHINES Syafruddin Hasan.
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
ME4182 Midterm Progress Report Team: Future Crew Technologies Chris Biggers Simon Cole Ray Cortés Chuck DeVane Victor Renteria TeJuan Rowe Professor: Dr.
Update of SAE J2908 Activities Mike Duoba Argonne National Laboratory 19 October
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
P16221 – FSAE Shock Dynamometer Problem Definition Review.
MSD P15280 RIT HOT WHEELZ TEST BENCH. AGENDA ❖ Review Problem Definition Material ❖ System Level Design Review ▪Functional Decomposition ▪Morphological.
ELEC 3105 Basic EM and Power Engineering Rotating DC Motor PART 2 Electrical.
Thank You Sponsors. Thank You Sponsors Problem Statement Identification of Critical Subsystems Identification of Vehicle States Analysis of Vehicle States.
Presented By: Jeff Andrews Adrian Simon Jon Brownlow.
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
P16452: Active Reciprocating Compressor Valve Assembly Week 9: Subsystem Design Review.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid.
Preliminary Detailed Design Review Group P16228: Mike, Zach, Joe, Elijah & Bernie.
Project Final Presentation Joe Featherall.
SYSTEM LEVEL DESIGN REVIEW P16318 Gaseous Mass Flow Rate Controller Luke McKean, Lianna Dicke, Selden Porter, Schuyler Witschi ?
Background Customer Requirements Final Test Fixture Subsystems P16203: Smart Power Supply Test Bench CUSTOMER: Bear Power Supplies, Phelps, NY PROBLEM:
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
ELEC 3105 Basic EM and Power Engineering
Electric Machine Induction Motor
P07203 Dynamometry Laboratory Infrastructure
Baja Hybrid Drivetrain Design P14224
Baja Hybrid Drivetrain Design P14224
Ruggedized Camera Encoder
Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio
Meeting Overview Slides
MSD P15280 RIT HOT WHEELZ TEST BENCH
P15661 Reciprocating Friction Tester Base Subsystem
ME 481 Engineering Modeling
P17452 Dresser-Rand System Health Monitor System Level Design Review
Active Reciprocating Compressor Valve Assembly P16452
Prototyping with Micro-controllers, Sensors, and Materials
AC Drives Dr. Adel A. El-Samahy Department of Electrical Engineering University of Helwan.
Prototyping with Micro-controllers, Sensors, and Materials
Wednesday, February 16, 4:00-6:00PM
Prototyping with Micro-controllers, Sensors, and Materials
Detailed Design Review (Phase 4)
Detailed Design Presentation
Preliminary Detailed Design Review: P18001
Presentation transcript:

MSD P15280 RIT HOT WHEELZ TEST BENCH

AGENDA ❖ Review Problem Definition Material ❖ Review System Design Material ❖ Sub-System Design Review ▪Motor Sourcing ▪Motor Coupling Solutions ▪Heat Transfer Analysis ▪Electrical Testing ▪Sensor Solutions ❖ Design Changes ▪Current Dyno Functions ▪Updated Problem Definition Material ▪Plans for Improvements & Changes

PROBLEM DEFINITION REVIEW

PROJECT BACKGROUND ❖ The RIT Hot Wheelz Electric Vehicle Team is a group of all female undergraduate engineers who come together to form a team of innovative and creative race enthusiasts. ❖ There focus is an environment of both learning and teaching with hands-on design and build experience. ❖ Previously, the team has competed in only Imagine RIT events ❖ Electric Dragster Competition ~ 1 st Place ❖ Electric Endurance Competition ~ 3 rd Place ❖ Electric Autocross Competition ~ 3 rd Place ❖ The team is ready to take their skills to the next level! ❖ Formula Hybrid-Electric only

PROJECT STATEMENT

CUSTOMER REQUIREMENTS

SYSTEM DESIGN REVIEW

Pugh Chart

BENCHMARKING- Example Test Benches ❖ Speed Control Test Bench (Left) ➢ Allows the study of the operation of a servodrive when a variety of loads are applied to the motor. ➢ Powder Brake to vary motor load ➢ Main Components: ■Motor Voltage ■Motor Temperature ■Load amount and type ❖ Motor Test Bench (Below) ➢ Robust, multi-compatible ➢ Flexibility through modular design ➢ Motor Torque, Power & Efficiency

SELECTED CONCEPT- MECHANICAL ❖ Two mechanical structures ➢ Mobile Cart to mimic Hot Wheelz Chassis ➢ Enclosed T-framed structure to house motors and moving parts ➢ UI will be located on top of the T-framed enclosure. ➢ All pieces are portable and compact Above: Preliminary CAD model of a 36in by 30in T-slot aluminum framing enclosure with two removable plexiglass panels for access and electrical attachment.

SUB-SYSTEM DESIGN REVIEW

MOTOR SOURCING ❖ Enstroj Emrax 228 Sourced to Vary Load on the Hot Wheelz Powertrain ➢ AC Electric Motor ➢ Continuous RPM ➢ kW Continuous Motor Power ➢ 240 Nm Max Torque ; 125 Nm Continuous Torque

MOTOR COUPLING SOLUTIONS Concerns: ❖ Vibration ❖ Durability ❖ Modularity ❖ Safety

MOTOR COUPLING SOLUTIONS Initial Concept: ❖ Subject Matter Experts ➢ Dr. Ghoneim (vibration) ➢ Prof. Humphrey (power transmission) ❖ Multi V-Belt ➢ Absorbs vibrations ➢ No slip is not critical ❖ Sheave (Pulley) ➢ Supported by a bearing on each side ➢ Fully enclosed for safety

HEAT TRANSFER ANALYSIS ❖ Energy Dissipation Method Using Resistor Banks ➢ TE Connectivity Wirewound Resistors ■Power Rating 2.5kW ❖ Assumptions ➢ Continuous Run Time 10 Minutes ➢ Room Size: 18’ X 18’ X 12’ ➢ Initial Temperature is 23 degrees Celsius ➢ Using 14 Resistors to Dissipate 32kW of Power (Worst Case) ❖ Results ➢ Final temperature of Hot Wheelz Room After Testing → 146 degrees Celsius (296 degrees Fahrenheit)

ELECTRICAL MOTOR TESTING

ELECTRICAL TESTING Equivalent Resistance Analysis Schematic of Resistive Network s: Duty Cycle of PWM

ELECTRICAL TESTING Approximation Analysis When R1 >> R2, Relationship could be linearized by restricting range of s:

❖ Voltage Sensor ➢ CR Magnetics - CR ➢ Sensing voltage - 600Vdc ➢ $ ➢ CR Magnetics - CR ➢ Sensing voltage - 600Vac ➢ $ ❖ Current Sensor ➢ Honeywell Sensing and Control CSLA2EL ➢ Sensing current - 550A max AC/DC ➢ $50.00/sensor ❖ Temperature Transducer ➢ Microchip Technology MCP9701A-E/TO ➢ Sensing temperature - Local -10°C ~ 125°C ➢ $0.37/sensor SENSOR SOLUTIONS

❖ Ultrasonic Proximity Transducer ➢ Sparkfun Ultrasonic Range Finder - LV-MaxSonar-EZ1 ➢ Sensing Range inches (0 to 6.45m) in 1 inch increments ➢ $25.95/sensor ❖ Encoder ➢ ams AS5048 Magnetic Rotary Encoder ➢ Sensing Range - 30mT to 70mT ➢ $6.60/IC ❖ Out of price range: ➢ Torque Transducer ➢ Price upwards of $1,000+ (Acquire data from Hot Wheelz sensors instead)

UC FLOW DIAGRAM 1.Make connection with computer 1.Obtain test parameters - manual test or simulated 1.Check interlocks 1.Begin test 1.Collect data

UC FLOW DIAGRAM Sampling ISR - Handles same rate and sampling from different Sensors Interlock/ESTOP Fault ISR - Automatically stops Hot Wheelz and loading motor Incoming Message from Computer ISR - Interpret message and execute appropriate code

DESIGN CHANGES

CURRENT KGCOE DYNAMOMETER

CURRENT KGCOE DYNAMOMETER-CONTROLS ROOM

UPDATED CUSTOMER REQUIREMENTS

UPDATED ENGINEERING REQUIREMENTS

UPDATED CONSTRAINTS

UPDATED DESIGN CONCEPT

UPDATED DESIGN CONCEPT CONT.

MOTOR COUPLING SOLUTIONS Current Dyno A similar system will be adopted for our motor.

UPDATED RISK ASSESSMENT

PROGRESSION TIMELINE

QUESTIONS? FEEDBACK? SUGGESTIONS?