Www.balticbiogasbus.eu1 Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager.

Slides:



Advertisements
Similar presentations
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden Transnationality and locally implemented pilot actions in the BSR.
Advertisements

Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland.
SEECA (Strategy for Energy Efficiency through Climate Agreements) Tallinn City Government Environment Department.
Technical Press Briefing LIFE Sub-programme for Climate Action Commission proposal for a new LIFE Regulation ( ) 12 December 2011.
Regions for Economic Change Brussels, 24 June 2011 Electric Vehicles in Urban Europe: EVUE.
Baltic Energy Market Interconnection Plan (BEMIP)
New opportunities for regional development through cross-border cooperation Ministry of Environmental Protection and Regional Development November 16,
Baltic Energy Strategy Einari Kisel Director of Energy Department.
SUE GRAHAM NORTHUMBRIA UNIVERSITY SHEFFIELD 2 DECEMBER 2014 Thematic Objective 4: Supporting the Shift towards a Low Carbon Economy.
Key Factors in the Introduction of Hydrogen as the Sustainable Fuel of the Future John P Blakeley, Research Fellow Jonathan D Leaver, Chairman Centre for.
Introduction to CIVITAS‘ Definition of “Collective Passenger Transport“ and a Snapshot of its Results 13 September 2011 Brussels, Belgium Siegfried Rupprecht,
The Single Market Act: What's in it for Europe's regions and cities? Forum of the Committee of the Regions Brussels, 30 November 2010 Workshop 2: Coming.
Part-financed by the European Union WP 4 implementation cases: Estonia BalticClimate, 1st transnational seminar Gävle, June 11-12, 2009.
MEGA Metropolitan European Growth Areas – the Baltic Sea Area.
European Commission, Directorate-General Energy and Transport 03/06/2015 Slide 1 EU Activities on Hydrogen l Energy consumption and CO 2 emission l Alternative.

Urban mobility organization and governance in Riga Riga March 5, 2015.
EU Energy Strategy
АГЕНЦИЯ ПО ЕНЕРГИЙНА ЕФЕКТИВНОСТ Kolio Kolev Director, Directorate Energy Efficiency Control in Buildings and Public Register, Energy Efficiency Agency.
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
Baltic Sea Strategy Annual Forum Green Growth Workshop A feasibility study on an LNG Infrastructure for Short Sea Shipping (Project 4.6 in the EUBSS) Mogens.
1 Regulations and policy instruments for introducing biogas Nelson Rojas Project Manager Tartu, 23 rd March 2011.
Part-financed by the European Union Priority 2 of the BSR Programme External and internal accessibility of the BSR Ryszard Toczek, City of Gdynia.
Climate Change, driving force for biofuels Regional Seminar Tartu of March 2011 Lennart Hallgren Project Manager.
Stockholm Environment Institute Tallinn Centre SEI Tallinn Säästva Eesti Instituut 20 years – 20 milestones.
BSSSC AND COOPERATION IN THE BALTIC SEA REGION ANN IRENE SAETERNES, International coordinator EASTERN NORWAY COUNTY NETWORK.
Co-creating Bionergy Regions Regional strategies and demonstration projects Visiting Ludza, Latgale Region 4-5 October 2012 Bjarne Rasmussen, Region Zealand.
Ea Energianalyse Helsingør - 4 June 2009 Anders Kofoed-Wiuff, Ea Energy Analyses Helsingør - 4 June 2009 Anders Kofoed-Wiuff, Ea Energy Analyses.
EU Cohesion Policy in support of Innovative Energy Solutions in the Baltic Sea Region Charlina Vitcheva Director - Inclusive Growth, Urban and Territorial.
Part-financed by the European Union (European Regional Development Fund PlasTEP – Dissemination and fostering of plasma based technological innovation.
Next steps in the Baltic Biogas Bus project for period : Extending a successful partnership Geert Schaap
Part-financed by the European Union The new Baltic Sea Region Programme Susanne Scherrer, Director of the Joint Secretariat Rostock/Riga.
Baltic Sea Region Programme EU:s strategi för Östersjöregionen, hur nära relation? -Större vikt, mer medel? -Ryssland, Vitryssland -Större roll,
Project Part-financed by the European Union Towards an integrated transport system in the Baltic Sea Region Project presentation at the StratMoS conference,
EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG IIC Community Initiative concerning Transnational Co-operation on Spatial Planning
Integration of Baltic Sea science Kaisa Kononen PhD, Executive Director Baltic Organisations Network for Funding Science EEIG.
Part-financed by the European Union The Baltic Sea Region Programme by the Joint Technical Secretariat BSR INTERREG III B Neighbourhood Programme.
Athens, 24 April 2012 Bernd Decker, Rupprecht Consult Introduction to CIVITAS‘ definition of “Transport Demand Management Strategies“ and a Snapshot of.
How to Use the Structural Funds ? 1.Financing sustainable energy projects. 2.Practical support – RUSE operation. Jana Cicmanova Energie-Cités.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
ESPON 2020 Cooperation Programme EU Stakeholder consultation 27 March 2013 ESPON renewal, refocus and upgrade: Mission, Priority Axes, Specific Objectives,
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden A Community Initiative concerning Transnational co-operation on spatial.
Part-financed by the European Union Baltic Sea Region programme 2007 – 2013 by Joint Secretariat.
Part-financed by the European Union Baltic Sea Region 2007– Profile Joint Technical Secretariat Lead Applicant Seminar, Riga, 9-11 April 2008.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
Part-financed by the European Union Setting regions in motion by Giedrė Švedienė, Undersecretary Joint Programming Committee/Ministry of the Interior,
BaltMet Inno – Innovation Cooperation between Metropolitan Areas in the Baltic Sea Region Joint Innovation Policies for the Baltic Sea Region Workshop.
Start and break slide Kick-Off-Meeting April 1 st – 3 rd 2009 Large Conference Hall of Hotel Riga Riga/ Latvia host: Baltic Sea Region Programme
Scania – Sustainable Urban Transport – April 2008
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October/December2008.
HST Region High Speed Trains and Regional Development ”HST Region” Updated PP-Presentation October 08/January 09.
Risoe National Laboratory Slide no. 1 International Hydrogen Day Berlin, February 24 th 2005 Sustainable Mobility and Hydrogen Hans Larsen, Head of Department.
Facilitation of use of green transport - electromobility Ministry of Transport Ministry of environmental protection and regional development of the republic.
Näringsdepartementet Green Corridors and the Baltic Sea Strategy TransBaltic kick-off September 2009 Jerker Sjögren.
Interreg Baltic Sea Region What type of projects can receive funding? Policy-to-project-to-policy Conference Copenhagen| 28 April 2016 Ilze Ciganska, Marta.
Forest Knowledge Know-how Well-being Luke’s and VTT’s joint research and innovation programme 2012–2016.
1 European Investment Bank EIB's support for Energy Efficiency & Renewable Energy Investment in cities and regions - European Local Energy Assistance (ELENA)
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
PRESENTATION OF EUROPEAN TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES FOR – POTENTIAL FOR COOPERATION Gediminas ČESONIS Deputy Director of Regional.
Horizontal Action Climate Warsaw, 29 October 2015 Council of the Baltic Sea States Krista Kampus, Head of Baltic 21 Unit EUSBSR HA CLIMATE Coordinator.
Giovanni Pavesi – CEO Linde Gas Italy
Go LNG LNG Value Chain for Clean Shipping, Green Ports and Blue Growth in Baltic Sea Region.
Project BIN2GRID ZCH / Bojan Ribić
Baltic Sea cooperation for reducing ship and port emissions through knowledge- & innovation-based competitiveness BSR InnoShip Baltic Sea cooperation for.
HyTrEc2 Hydrogen Transport Economy for the North Sea Region 2
BEIS Local Energy Team Stuart Chapman, Local Partnerships Manager
Baltic Energy Market Interconnection Plan (BEMIP)
Technical Press Briefing LIFE Sub-programme for Climate Action Commission proposal for a new LIFE Regulation ( ) 12 December 2011.
Baltic Sea Region Strategy
Presentation transcript:

Aims, objectives and achievements Regional Seminar Tartu of March 2011 Lennart Hallgren Project Manager

The Project: Baltic Biogas Bus is a part of the solution A project to stimulate the use of biogas as fuel for city buses aiming to reduce environmental impact.

BBB is a part of the EU Climate Change Strategy Extended use of Biogas buses in public transport will - lower emissions - improve urban air quality - strengthen the role of public transport - create energy autonomy Photo: SL/Mikael Hedlund

Goals and budget Generate regional strategies for biogas bus operations Developments in production, distribution and operations Disseminate biogas potential Period: 2009–2012. Budget: 4,2 MEUR. Financing:Partly by the EU fund (ERDF) A Pan-Baltic project within the Baltic Sea Region Programme

12 partners around the Baltic Sea SL, Stockholm Public Transport, Sweden Biogas East, Energy Agency Malardalen Ruter, Public Transport for Oslo and Akershus, Norway HOG Energy, the fuel interest organisation for Bergen region Hordaland County Council, Skyss VTT Technical Research Centre, Finland Tartu city, Estonia Riga City, Latvia Buses of Kaunas city, Kauno Autobusai, Lithuania MTI, Motor Transport Institute, Poland ATI erc Education, Research and Furtherance of Cooperations, Germany ITC Innovations and Trendcenter

A project with several steps WP3 Policies & Strategies WP4 Biogas Supply WP5 Distribution and bus depots WP6 Biogas buses WP2 Communication For efficient use of biogas buses we work with:

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

Biogas buses in Bergen

Process framework 1) Understanding the decision making process 2) Goal and goal scenarios 3) Insight and documentation 4) Communication 5) Creating and developing alliances 6) Project Management

Conclusion from HOG Energi’s work in Bergen Decision from Hordaland County Council: 75 new gas buses to be purchased in Bergen Climate Plan for Hordaland county states that use of biogas and other renewable energy sources will be increased towards Biogas will be a priority in public transportation Decision from Bergen City Council: Produced biogas from Rådalen production facility shall be used in the public transport sector

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

Strategies for Tartu City Transport development plan Research for potential biogas production, distribution and usage Feasibility study of biogas buses Awareness, dissemination of the potential for sustainable city transports and biogas

Life cycle costs analysis Biogas Generation -investment ~5 M € -specific cost 21 € c/km cumulative 21 c/km Upgrading - investment ~2 M € - specific cost 7 € c/km cumulative 28 c/km Distribution 20 km - by vehicle CBG 3 € c/km cumulative 31 c/km Refilling 2 ∙ 50 buses - investment ~2.4 M € - specific cost 18 € c/km cumulative 49 c/km Diesel - investment ~230 k € - specific cost 59 € c/km cumulative 104 c/km Bus usage Biogas - investment ~270 k € - specific cost 70 € c/km cumulative 119 c/km Diesel production, refining, distribution and refilling specific cost 45 € c/km Cost of biomethane as fuel approx. 14 % higher than diesel, immature market

Greenhouse gas emissions Well-to-wheel, according to the RES directive WTT = Well-to-tank = from biogas generation to refilling TTW = Tank-to-wheel = from bus usage

How to start a Biogas Market for traffic operators? Studies of biogas possibilities in the Stockholm region Co-operation between biogas producers and distributers Contracts Operation Legal agreements Procurment

Some results Supply of Biogas (WP4) - Potential of biogas in the Baltic Sea region - Landfill study, a general calc. model - Biogas with Hydrogen (ATI) - Supply and demand in eastern Sweden - Baltic Biogas Foresight (MTI) Biogas is the only commercially available 2nd generation bio fuel Photo: SL/Jan E Svensson

Aim of Study Develop a knowledge base on biogas infrastructure in BSR countries in a manner that is useful to identify the influence that existing and planned infrastructure have on introduction of biogas as a transport fuel in BSR countries. Objectives Study biogas infrastructure overview Map biogas production and distribution Analyze the influence of infrastructure on introducing biogas as a vehicle fuel Discuss barriers and opportunities to promote biogas www.balticbiogasbus.eu

Approx ,374 Ktoe 11,450+ Ktoe Germany Number of Plants Installed capacity Potential Major biogas plants and natural gas grids

8 5+ Ktoe 350+ Ktoe Estonia Number of Plants Installed capacity Potential Major biogas plants and natural gas grids

Per capita biogas production (kg of oil equivalent)

CountryplantsUtilization Sweden39 82% vehicle fuel 18% gas grid Norway3 66% vehicle fuel 34% gas grid Finland1 pilot plant100% vehicle fuel Germany35 9% vehicle fuel 91 % gas grid Biogas upgrading plants in BSR countries

Gas filling stations in BSR countries

25 Landfill gas production Waste management sector and transport sector co-operation Biogas systems New upgrading technique Biogas transport, storage and fuelling Landfill Gas

Production potential for biogas in eastern part of Sweden Draft Study compiles results from earlier reports Biogas Potential; apr. 15 TWh/year Current production; apr. 0,5 TWh/year

Study with references to earlier studies Definitions to separate SL potential from the Regional potential Production stability Economy Biogas potential for Public Transport in Stockholm,

Some results Biogas distribution (WP5) - Regional distribution planning - Fuelling systems, SL - Design bus depots for biogas - Biogas Cartridge systems, ATI - CNG filling station and bus depot in Tartu, feasibility study - Feasibility study, Rzeszow Biogas is the only commercially available 2nd generation bio fuel Photo: SL/Jan E Svensson

Demonstrate distribution planning with Stockholm region as case study Distribution techniques: pipeline network, compressed gas in bottles and liquefied gas distribution. Comparison between different distribution techniques based on technical, economical and environmental comparisons Integrated regional distribution infrastructure planning

Future gas grid distribution of biogas in Stockholm

Build up of a biogas fuelling system Fuelling systems compared by costs, safety, fuelling time and environment aspects for Fast filling Slow filling SL’s bus depots and fuelling systems Operational experiences Analyse fuelling system alternatives

32 Fuelling systems for biogas Fast fuelling dispenser Slow fuelling by ramp

Design of new bus depots Which existing depots are most suitable to convert to biogas? Design of new depots and adapt existing depots Mobile modular fuelling station (Investment) Design for new bus depots and adapt existing depots for biogas buses

34 Gubbängen Bus Depot

Some results Communication & dissemination - (WP2) - Show rooms, folder, posters ….. - Events/Regional seminars Tartu, Launch Event, Dec 2009 Oslo – March 2010 Kaunas – Sept 2010 Rostock – Oct 2010 Uppsala – Nov 2010 S:t Petersburg - Nov 2010 Riga – Dec 2010 Tartu – March 2011 ………

Our core messages Biogas is almost 100 percent renewable Biogas is a very efficient fuel Biogas will improve urban air quality Biogas is produced locally, improves energy autonomy

Baltic Biogas Bus Project 2009–2012 For further information please contact: Lennart Hallgren, Stockholm Public Transport