NEIL Requirements for Testing of FWH Electrical Equipment and AOV’s.

Slides:



Advertisements
Similar presentations
Use of Regeneration in Vapor Power Cycles
Advertisements

CONTROLS OF SUPER CRITICAL BOILERS
Preventing Equipment Failures
Fired And Unfired Pressure Vessels
Developed by Western Iowa Tech Community College This material was produced under a grant (SH F-19) from the Occupational Safety and Health.
Institute of Nuclear Power Operations 2011 Operating Experience for Feedwater and related Systems Mike Ballard – INPO ER Group © 2011 Institute of Nuclear.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Circulating Water System
Daikin Altherma™ Troubling Shooting
Setup/Installation/Operation of an Environmental Control Unit (ECU)
Severe Service Metal Seated Ball Valves
In this presentation you will:
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
Early detection of Tube Support Degradation in Feedwater Heaters Presentation to the 2013 Feedwater System Reliability Improvement Meeting January 21-24,
Walter G Bischoff Brunswick station Duke Energy
MIS 5241 Three Mile Island What Happened, What Worked, What Didn’t.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
Procedures for safely isolating supplies
Controlling Hazardous Energy
Module 2: Hardware and Terminology
Electrical Engineering. A circuit is a combination of different components that allow electricity to flow through them. Each component serves its own.
MOSFET As switches. Regions of Operation In analogue electronics, the MOSFETs are designed to operation in the pinch-off or saturation region. ▫They are.
2 Instructor Training MPTT Flow Loop System VLP-TRN-MPTT.
ACADs (08-006) Covered Keywords Description Supporting Material
DISPENSING FUEL HSE CONSIDERATIONS 1. FUEL TANKERS Road tankers or bowsers which refuel vehicles, plant, and equipment shall be subject to scheduled inspection.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Cook Nuclear Power Plant
Quantifying Cycle Isolation Losses and Integration with On Line Systems Feedwater System Reliability Users Group 2015 Meeting San Antonio Ken Porter Rich.
ONE INDUSTRY – ONE STANDARD Panel Discussion Transition to ANS/ANSI Standard.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Feedwater System Reliability Users Group – 2012 Meeting Power Uprates & Feedwater Heaters 1.
FRANKLIN engineering group, inc. Start-up Shutdown Malfunction Plan Development and Implementation Duncan F. Kimbro
MSR Effects Upon Secondary Cycle. ## # 666 Heater Drain Pump Main Steam Main Turbine #6 FWH MSR #5 FWH #4 FWH MOV Drain Tank Manual Valve AOV Note: Most.
Operation Sabbath Mode - SELECT PROGRAM - Lights, alarms and fans Normal Sabbath Overview.
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
Scope Richard Crowder. E 3 AN  Electrical  Electronic  Engineering.
1 GENERATION TECHNOLOGIES -- Bhanu Bhushan -- (April, 2011)
Switches in Series A heating system is a practical circuit used in homes which has two switches in series. The thermostat switch opens (OFF) when the temperature.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Interactive Control in Engineering Projects Electronics and Control.
Mechanical Integrity Equipment Deficiencies. Lesson Objectives  Describe Actions When Equipment Deficiencies Found in Operating Equipment  Describe.
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
I & C.
Testing of Low Voltage Installations
Presentation on Steam Power Plants R.C.Chaturvedi
PROGRAMMABLE LOGIC CONTROLLER
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Procedures.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
AIR CONDITIONING (COOLING)
What is the difference between Annual and Five- year sprinkler test.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
Unit 13 Oil-Burning Equipment
Maintenance strategies
Review Questions Chapter 5
Thermodynamics Cycles.
TURBINE CRANES NEA36 Turbine Crane.
LP Feedwater Heater Tube Failure Point Beach Nuclear Plant
Hemodialysis Lecture 3.
Relay operation Water level Indicator
2012 Operating Experience for Feedwater and Related Systems
UBOH PLTU JAWA BARAT 2 PALABUHANRATU 3 x 350MW
Globe Valve - Introduction, Advantage, Disadvantage and Application.
PLC Hardware Components.
ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW
Basic Electronics Part Two: Electronic Components.
Presentation transcript:

NEIL Requirements for Testing of FWH Electrical Equipment and AOV’s

STP self-identified nonrelated NEIL issue that resulted in repeat failure of a critical SSC STP self-identified nonrelated NEIL issue that resulted in repeat failure of a critical SSC. NEIL inspection coming up  comprehensive review of all requirements  found this FWH equipment issue NEIL inspection coming up  comprehensive review of all requirements  found this FWH equipment issue Communicate NEIL requirements regarding FWH electrical equipment/AOV testing Communicate NEIL requirements regarding FWH electrical equipment/AOV testing –NEIL has spent beaucoup dinero on DC Cook event –Have shifted focus to protecting large assets (i.e. Main Turbine) –OE31559 – Reference Nine Mile Point OE Purpose

Requirements Feedwater Heater Alarms and Interlocks · Perform observation/Test/ Inspection/Surveillance of Integrity of Electrical Circuits/Heaters. Should ‘NA’, Shall 1 Fuel Cycle LCS (TG/Exciter – Operating Test) · Operating and testing to be conducted: Integrity of electrical circuitry and power supply for heater extreme high level alarms, controls, switches and interlocks by testing. Should – ‘NA’, Shall – ‘1 fuel cycle’ LCS Section Feedwater Heater Level Control Valves · Perform observation/Test/ Inspection/Surveillance of Integrity of Electrical Circuits/ Valves. Should ‘NA’, Shall 1 Fuel Cycle LCS (TG/Exciter – Operating Test) · Operating and testing to be conducted: Integrity of electrical circuitry and power supply of all remote operated heater drain and bypass valves by testing. Should – ‘NA’, Shall – ‘1 fuel cycle’ LCS Section

Typical Heater Drain System Normal Level Control Valve High Level Dump May be digital or Analogue

Typical Heater Steam Side Isolation Level Switches that: Shut off Extraction Steam Shut off previous FWH flow Shut off Blowdown flow

Typical Tube Side Isolation System Level Switches that: Shut off Condensate flow Open Condensate Bypass Shut off other sources of flow into heater

RHDT’s / MSDT’s / Deaerator switches/AOV’s are not applicable RHDT’s / MSDT’s / Deaerator switches/AOV’s are not applicable Alarms are not applicable (per our NEIL rep, though you should ask your rep specifically) Alarms are not applicable (per our NEIL rep, though you should ask your rep specifically) Should be done at beginning of outages to identify scope Should be done at beginning of outages to identify scope You can take credit for SU/SD actuation, PM, or corrective PMT (monitor voltage at the contacts for large MOV’s) You can take credit for SU/SD actuation, PM, or corrective PMT (monitor voltage at the contacts for large MOV’s) Don’t have to test all equipment at the same time Don’t have to test all equipment at the same time No requirement to fill level switch standpipes No requirement to fill level switch standpipes Ops controlled procedure is the easiest way Ops controlled procedure is the easiest way Considerations for Testing

Discussion NEIL standards are governed by representatives from each plant NEIL standards are governed by representatives from each plant If a standard is too restrictive or is not effective, the board can change it If a standard is too restrictive or is not effective, the board can change it What is your plant’s strategy? What is your plant’s strategy? What do you think? What do you think?