Introduction Overall project structure Pilot actions – short descriptions by partners Project management Budgets Audit & controls Project monitoring &

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

S.O.S. eHealth Project Open eHealth initiative for a European large scale pilot of patient summary and electronic prescription Daniel Forslund, Head of.
Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
Introduction of participants / project ideas (PI) Presentation: What makes a good partnership? Presentation: Which projects is NWE looking for? Speed dating.
WP2 – communication and dissemination
Analysis of research and innovation projects in the region Ivan FILUS, BIC Bratislava Joint PA7 SG and Danube-INCO.NET GA workshop Vienna,
Europe and Education School Education COMENIUS. The School Education Action of the European Community’s Programme “Socrates” on Education 2 nd phase:
European Partnership for Action Against Cancer (EPAAC)
Green Partnerships Local Partnerships for Greener Cities and Regions Project overview Kick-off meeting Crete, 9-10 April 2013.
Adriatic MoS The MED-PCS project July 15, Rome PROMOTION OF "PORT COMMUNITY SYSTEM" IN MEDITERRANEAN TRAFFIC Vittorio Marzano Assistant professor.
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
FAST-LAIN (Further Action on Sustainable Tourism – Learning Area Innovation Networks) Project Overview ACTION N °: /CIP/10/B/N04S00 T ITLE : Knowledge.
Training of National Judges INFO DAY Introduction to the new Call for Proposals 2014 Raffaella Battella - DG Competition.
Communication strategy and techniques to launch InnovMed Dr. Fatma H. Sayed Vienna meeting 25 June 2007.
Activity Reporting Lead Partner and Partner Seminar 16 June 2009 – Laukaa, Finland Kirsti Mijnhijmer.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF. Work Package 4 & Methodology for Open Living Lab O4.1.7 Budapest,
Innovation in the Rural Development Networks Directorate General for Agriculture and Rural Development Matthias Langemeyer & Iman Boot.
1 LEADER and TNC implementation including aspect of networking Kasia Panfil, ENRD Contact Point 25 May 2012, Lithuania.
Application Form Part 1, Sections 4-9 How to Apply Seminar 16 th September 2010 – Copenhagen Kirsti Mijnhijmer.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
COMPONENT 2 COMMUNICATION & DISSEMINATION 5 th INNOPOLIS meeting Prague, 19/10/2011 OVERVIEW.
Consultant: CMDC Joint Venture 1 General Principles of EIA Centres (based on “Establishing & Operating an EIA Centre” by EIA Centre Manchester and Ecoline.
Strengthening global awareness in the local communities - Kolping 2020 Strategy.
MEETING ON EUROPEAN CHARTER FOR SUSTAINABLE TOURISM FOR THE COTSWOLDS AONB Cotswolds Conference Centre, Broadway 18 th February 2010.
1 WERT: WP 5 RG EVANS ASSOCIATES November 2010 Aim To pilot and evaluate the content and context of the course material with target groups To help women.
Green Partnerships Local Partnerships for Greener Cities and Regions 5 th Steering Committee meeting Lakatamia, June 2014.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Welcome. Project aim – a reminder To build the skills of women entrepreneurs involved in rural tourism and crafts To improve the quality of training provided.
Waterways Forward Overview of partners’ specific roles and tasks Delft, 12 February 2010 Kick-off meeting.
“ BIRD Project“ 1 Broadband Access, Innovation & Regional Development” Broadband Access, Innovation & Regional Development” Project Description Ulrich.
Quality System Assessment in Italy European Curricula for Economic Animator in the Enlarging Europe – ECONOMIC ANIMATOR PT04/PP/08/36/446.
WCC 2014 MILANO GOVERNANCE & EUROPE The potential of inland waterways for sustainable and integrated economic growth Nico van Lamsweerde, MSc.
Orientation for new Lead Partners and Partners Information & Publicity Requirements Lead Partner and Partner Seminar 12 June 2008 – Voss, Norway Kirsti.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
DESCRIPTION OF THE MONITORING AND EVALUATION SYSTEM IN POLAND Monitoring indicators.
CCIC Component 2 Communication & Dissemination. The Team in Eindhoven Tieke VeuskensEindhoven –T: E :
ESPON Workshop at the Open Days 2012 “Creating Results informed by Territorial Evidence” Brussels, 10 October 2012 Introduction to ESPON Piera Petruzzi,
Action 12:Internal Monitoring BMW Regional Assembly.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
WP2 Communication issues: Website Socials Final conference Brochure EA SEA-WAY WP leaders Meeting Belgrade 25 th November, 2015.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
COMENIUS 3 NETWORK Neothemi COMENIUS 3 NETWORK Neothemi Network Co-ordinator Prof. Claudia Saccone Network Co-ordinator Prof. Claudia Saccone.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
European Union COMMUNICATION AND VISIBILITY. Importance of Visibility EU taxpayer money Need for awareness, accountability and transparency EU should.
Project design – Activities and partnership CENTRAL EUROPE PROGRAMME Project development seminar Prague, 1-2 February 2010 Monika Schönerklee-Grasser.
Co-funded by the European Union Ref. number: LLP FI-ERASMUS-ENW OI-Net The European Academic Network for Open Innovation ,
Transnational Working & Reporting Procedures. LP Seminar January 2013 Transnational Cooperation & Reporting Procedures I) Transnational cooperation: Definition.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
Kick Off Meeting Largs, Scotland
PSCE Conference Athens 23th November 2016
Gas Regional Initiative
Application Form Sections 4-9 Christopher Parker & Kirsti Mijnhijmer 28 January 2009 – Copenhagen, Denmark European Union European Regional Development.
Civil Protection Financial Instrument – Prevention Projects
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
Evaluation in the GEF and Training Module on Terminal Evaluations
WP2 Communication WP and tasks presentation
- Kick-off meeting - ERANET Cofund BlueBio WP4 (Leader: AEI)
XVII PA7 Steering Group Meeting
Presentation transcript:

Introduction Overall project structure Pilot actions – short descriptions by partners Project management Budgets Audit & controls Project monitoring & reporting Communication Golden Rules revisit & Summary NUMERICANAL

Overall aims (1) Numericanal aims to connect the Regional & National strengths and experience of 7 partners active in the field of ICT and waterways management, to create a transnational strategy for the development of e-services, information and communications along smaller dimension waterways. The project will identify ways to reduce costs and increase efficiencies in the management these waterways in NWE through implementation of innovative ICT based approaches and tools. “Using technology for the more efficient management of inland waterways” Overall project structure

Overall aims (2) WHY IS TRANSNATIONAL CO-OPERATION NECESSARY?  Because smaller waterways feed into the main ‘trunk’ network there is a need to increase ‘compatibility’ or standardisation of our smaller waterways with each other and the larger waterways across the EU. We also need to take account of cross- border implications for smaller waterways.  Given the wide range of organisations involved in managing regional waterways (local / regional authorities plus national navigation organisations) there is a need to share knowledge and experience of new technologies (which will indeed be new to some) to come up with common approaches to achieve greater operational efficiency and avoid ‘re-inventing the wheel’ Overall project structure

Specific Activities (Work Packages) Overall project structure WP1 - Analyse existing good practices and identify potential new practices WP2 - Develop / pilot use of mobile technology information for users (Smartphones / lock op etc) WP3 - Develop / pilot new technology approaches to safety, particularly conflicts between smaller leisure boats and freight/commercial boats. (Congestion/danger zones, training) WP4 - Develop / pilot ICT waterway control & management systems (G&S / Eindhoven Control Centres) WP5 - Evaluate these WP’s and roll out results and lessons learned “Analyse existing practices, assess Mobile, Safety, and management technologies, then disseminate the results”

Project Structure (Work Packages) Overall project structure WP1 - Analyse existing good practices and identify potential new practices WP2 - Develop / pilot use of mobile technology information for users (Smartphones / lock op etc) WP3 - Develop / pilot new technology approaches to safety, (Congestion / danger zones, training) WP4 - Develop / pilot ICT waterway control & management systems (G&S / Eindhoven Control Centres) WP5 - Evaluate these WP’s and roll out results and lessons learned

Work packages – WP1: Overall project structure Analyse existing good practices and identify potential new practices

Work packages – WP2 Overall project structure Develop / pilot use of mobile technology information for users (Smartphones / lock op etc)

Work packages – WP3 Overall project structure Develop / pilot new technology approaches to safety, particularly conflicts between smaller leisure boats and freight/commercial boats. (Congestion/danger zones, training)

Work packages – WP4 Overall project structure Develop / pilot ICT waterway control & management systems (G&S / Eindhoven Control Centres)

Work packages – WP5 Overall project structure WP5 - Evaluate these WP’s and roll out results and lessons learned

Project Structure (Work Packages & Actions) Overall project structure WP1 - Analyse existing good practices and identify potential new practices WP2 - Develop / pilot use of mobile technology information for users (Smartphones / lock op etc) WP3 - Develop / pilot new technology approaches to safety, (Congestion / danger zones, training) WP4 - Develop / pilot ICT waterway control & management systems (G&S / Eindhoven Control Centres) WP5 - Evaluate these WP’s and roll out results and lessons learned (All Work packages have a number of Pilot Actions)

Action 1 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Analysis of existing practices CRT (Lead), with all partners involved in implementing the action

Action 2 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Connectivity/regulatory issues CRT(lead), supported by all partners. Specific technical support will be provided by…..

Action 3 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Diagnostic and model for the development of the wifi based app system. VNF will lead the action in close cooperation with Eijsden- Margraten and CETIC

Action 4 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Setting up a cross border WIFI based app system for information waterway users in the Netherlands Eijsden-Margraten lead, supported by VNF and CETIC

Action 5 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Setting up a cross border WIFI based app system for information to waterway users in France. Voies Navigables de France lead, supported by Eijsden-Margraten and CETIC.

Action 6 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Investigate how the approaches developed through the pilot actions might be rolled up out to other waterways within NW Europe, through developing a pilot strategy for replication in the Midlands Regional Authority. Vacant!

Action 7 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Danger zoning and use of ICT and Apps for waterway safety VNF is leading the implementation of this action in strong cooperation with SRN and involving all PPs as well as external stakeholders

Action 8 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Education platform and training on nautical safety SRN is leading the implementation of this action in strong cooperation with all PPs but also external stakeholders.

Action 9 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Roll-out of the nautical safety applications and programmes SRN is leading the implementation of this Action in strong cooperation with VNF & the rest of the Partners, together with external stakeholders.

Action 10 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Define common Control Centre (CC) model and operations CRT (Lead), with all partners supporting the concept design

Action 11 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Design & development of pilot Control Centre in the UK (Gloucestershire) CRT (Lead), supported by City of Eindhoven, VNF & Cetic

Action 12 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Design & development of pilot Control Centre in the Netherlands (Eindhoven) City of Eindhoven (Lead), supported by CRT, VNF & Cetic

Action 13 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Replication & roll-out: Eijsden- Margraten (Netherlands) Eijsden-Margraten, CRT, City of Eindhoven, VNF, SRN, CETIC, subpartners Riemst(B) and Visé(B)

Action 14 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Define the global model and the evaluation methodology CETIC (Lead), with all partners and observers providing inputs and participating in the review process

Action 15 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Support the data gathering process during all the pilot phases CETIC (Lead), leaders of WP2 (VNF), WP3 (SRN), WP4 (CRT). Indirect participation of other partners involved in pilot actions

Action 16 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Evaluation of the pilot results CETIC (Lead), with all partners and observers participating in the review process

Action 17 Action 1 Analysis of existing practices CRT (Lead), with all partners involved in implementing the action Overall project structure Investigate and prepare the roll out to other waterways within NW Europe CRT, VNF, Midland regional authorities, SRN, Igretec with support of CETIC

General Project timeframe – start & finish dates Project Start date - 12th May 2011 Project End date - 30th Sept 2015 (starting in earnest now so runs for the next 3.5 years) Lead Partner Principle Contract with JTS Partnership agreement Project Steering Group & SG meetings Project management

JTS (Lille)CRT (1) VNF (2) Midland Region Authority (4) Eindhoven (7) Eijsden-Margraten (3) SRN (5) CETIC (6) + Riemst + Vile de Vise (as sub-partners) Project Structure Plus 11 Observer Organisations

Communications Strategy – to be drafted based on Application (Section 4) Communications Sub-group Website – news, project progress/results etc Brochure Display panels Newsletters – mainly electronic. 2 per year Final conference Press / news releases – all partners Articles in relevant publications Use of panels & materials at external events Direct reports on progress to other networks – regional / national / EU Communications

Logos Numericanal …use this one