PG&E Self Generation Incentive Program (SGIP) Call in number: 1-866-234-4460 Meeting number: *4159730770* August 11, 2009.

Slides:



Advertisements
Similar presentations
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Advertisements

California Energy Commission Customer-side Distributed Generation Impacts CED 2013 Preliminary Demand Analysis Working Group DG PUP June.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
The California Energy Crisis Continuing Update Lon W. House, Ph.D ACWA Energy Advisor.
Indiana’s Clean Energy Credit Program (Energy Efficiency & Renewable Energy Set-aside) Roger Letterman Sr. Environmental Manager Office of Air Quality.
California Solar Initiative Go Solar California! Program Update Presentation to the Assembly Utilities & Commerce Committee Sean Gallagher, Energy Division.
Automated Demand Response "PG&E" refers to Pacific Gas and Electric Company, a subsidiary of PG&E Corporation. ©2013 Pacific Gas and Electric Company.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
IEPR Staff Workshop – ZNE Buildings
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Solar Incentives for Arizona Public Service, Salt River Project, Tucson Electric Power.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Energy Law Joel Roberson Spring 2007 State Strategies for Promoting Renewable Energy Topic: State Strategies for Promoting Renewable.
1 CPUC Responsibilities for Renewable and Energy Efficiency Resource Commitments by Investor-Owned Utilities and Ratepayers Hearing on Public Goods Charge.
0 Welcome to PG&E’s Interconnection Webinar We will be starting the webinar momentarily The slides for today’s presentation can be downloaded/printed at.
1 State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Realtor Solar Overview California Solar Initiative Updated
California Solar Initiative Public Forum Hosted by CCSE October 15, 2008.
NJ Clean Energy Program Noveda Technologies Liberty Science Center By: Joe Fiorella Information from the:
2012 Program Design Discussion Charlie Garrison, David Hill and Ron Reisman Renewable Energy Market Manager Team Renewable Energy Committee Meeting September.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
What’s Coming Down with Energy in California Lon W. House, Ph.D ACWA Fall Conference 2003 San Diego, CA.
Shawn Murphy September 29, Shawn Murphy, PE ENGR10 Guest Speaker  Solar Photovoltaics ◦ Electricity Generation, the CEC and PUC ◦ Silicon Solar.
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Renewable Energy in New Jersey’s Clean Energy Program Scott Hunter Renewable Energy Program Administrator, Office of Clean Energy in the New Jersey Board.
1 Emerging Renewables Program Solar Conference North State Renewable Energy Chico, CA March 10, 2005 BILL BLACKBURN Lead, Emerging Renewables Program California.
Damon Franz California Public Utilities Commission ACEEE 2010 Hot Water Forum May 13, 2010 The California Solar Initiative - Thermal.
2 California Solar Initiative Latest Handbook Changes The slides for today’s presentation can be downloaded/printed at
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. SDG&E’s Sustainable Communities Program and Support for our Solar.
Solar System Life Maintenance Call in number: Meeting number: * * August 3, 2009.
1 Renewable Energy at Closed Landfills June 17, 2009 Jim Christo Massachusetts Renewable Energy Trust.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Summer 2004 and Beyond Lon W. House, Ph.D ACWA/Edison Joint Presentation June 24, 2004.
California Takes Charge: Policies and Incentives for Energy Storage February 11, 2015 Rebecca Feuerlicht, SGIP Project Manager, Center for Sustainable.
California’s Bioenergy Programs – Update to Options for Bioenergy Facilities Paul Clanon & Judith Iklé California Public Utilities Commission April 1,
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
CPUC Role in AB 32 Implementation LIOB – 2 nd June, 2010 San Diego, CA.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 CSI Staff Proposal Workshop Energy Division California Public Utilities Commission November 17, 2010.
Senate Bill 1 and the New Solar Homes Partnership Valerie Hall California Energy Commission December 8,
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
1 Energy Efficiency Programs For Local Governments & Community Partners Christina Prestella Program Manager, Government & Community Partnerships PG&E September.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
Governor’s Clean Energy GREEN TEAM Annual Statewide Air Quality Conference May 10, 2001.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 12/17/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Program Overview Sachu Constantine April 23, 2008 Distributed Generation/ California Solar Initiative.
Background of Maryland’s Renewable Portfolio Standard Solar Technical Conference October 19, 2007 Maryland Public Service Commission.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
Sunverge Energy – SGIP Overview
LNBA Subgroup: Avoided Transmission Value
Irvine Ranch Water District Distributed Energy Storage Case Study
Self-Generation Incentive Program (SGIP)
SMUD - Whole Foods Energy Storage System
Phase 3 Solar Feasibility Study Findings and Recommendations
Elizabeth Hutchison February 26, 2016
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
City Council April 30, 2018 Item 13
NYS Department of Public Service
Photovoltaic Systems Engineering Application to PV Systems
Presentation transcript:

PG&E Self Generation Incentive Program (SGIP) Call in number: Meeting number: * * August 11, 2009

2 Goal & Agenda Goal Provide general information on the Self Generation Incentive Program and how to apply Agenda PG&E Background SGIP Background, Guidelines, & Eligibility 2009 SGIP Program & Updates Wind, Fuel Cell, & Advanced Energy Storage SGIP Application Process Quick Tips Q&A

PG&E Background

4 PG&E and Our Business What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately 15 million Californians Electric and gas distribution customers 5.1 MM electric 4.2 MM gas Electric transmission circuits18,610 miles Gas transmission backbone6,136 miles Electric generation capacity6,000 MW

5 PG&E as a Partner and Solutions Provider PG&E Portfolio Solution Reduce Energy Use Renewable Power Supply ClimateSmart Partnership Education Outreach

6 Integration of EE and PV EE is typically much more cost-effective than PV California’s loading order requires that EE be implemented prior to PV Decreasing a facility’s consumption with EE reduces the size – and cost – of the PV system necessary to offset the facility’s load EE should be implemented prior to PV Why? Inquire about EE before installing PV

7 We’re Committed to Energy Efficiency 0 2,000 4,000 6,000 8,000 10,000 12,000 14, California United States Over the past 30 years, California per capita energy use has remained relatively flat compared to the 50% increase in U.S. per capita energy use. Source: California Energy Commission

SGIP Background, Guidelines, & Eligibility

9 SGIP Background: Program Summary California Public Utilities Commission (CPUC) rebate program initiated in 2001 to reduce peak demand on the grid Scheduled to continue accepting applications through 2012 Provides incentives for the installation of new, qualifying self- generation equipment installed to meet all or a portion of the electric energy needs of a facility (Large Wind, Fuel Cell, and Advanced Energy Storage Systems) Program Administrators: 1. Pacific Gas & Electric Company (PG&E) 2. Southern California Edision (SCE) 3. Southern California Gas (SoCal Gas) 4. California Center for Sustainable Energy (CCSE) for San Diego Gas & Electric (SDG&E)

10 SGIP Background: Eligible SGIP Technologies Level 1: PV, Wind, Renewable Fuel Cells Level 2: Non-Renewable Fuel Cells Level 3N, 3R: Microturbines, IC Engines, Small Gas Turbines 2006 Level 1: PV Level 2: Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines, & Wind Level 3: Non-Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines 2007 Level 1: PV transitioned into California Solar Initiative (CSI) Program Level 2: Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines, & Wind Level 3: Non-Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines

11 SGIP Background: Eligible SGIP Technologies (Cont.) 2008 Level 2: Renewable Non-Solar: Fuel Cells, Wind Level 3: Non-Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines 2009: Level 2: Renewable Non-Solar: Fuel Cells, Wind Level 3: Non-Renewable Non-Solar: Fuel Cells, Microturbines, IC Engines, Small Gas Turbines Level 2 or Level 3: Advanced Energy Storage, Coupled with a new or existing SGIP funded Wind or Fuel Cell

12 SGIP Guidelines & Eligibility Pacific Gas and Electric (PG&E) Southern California Edison (SCE) Southern California Gas Company (SoCal Gas) San Diego Gas & Electric (SDG&E) –The California Center for Sustainable Energy (CCSE) administers the SGIP in the SDG&E Service Territory Eligible customer projects must be within the service territory of and must receive retail level electric and/or gas service from:

13 SGIP Guidelines & Eligibility (Cont.) Maximum incentive is 3 MW, with maximum system size 5 MW 1 Must be interconnected and serve on-site load Non-Renewable systems must satisfy PU Code requirements or documenting a minimum electric efficiency equal to or greater than 40% of higher heating value basis All fossil fuel combustion generators must satisfy both a 60% overall system efficiency and a NOx emissions equal or less than.07 lbs/MWh 1 Per Decision (D.) , SGIP Administrators for 2008 and 2009, on a pilot basis, will pay qualifying distributed generation projects incentives up to 3 megawatts (MW) from prior years’ carryover funds

2009 SGIP Program & Updates

Program Updates California Supplier - An additional incentive of 20 percent will be provided for the installation of eligible distributed generation technologies from a California Supplier. (Section 3.5) AES - Advanced Energy Storage systems that meet certain technical parameters and are coupled with eligible SGIP technologies, currently wind and fuel cell technologies, are eligible in PY2009 and will receive an incentive of $2 per watt of installed capacity. The PY2009 budgets by SGIP Program Administrator are –

SGIP Incentive Rates For projects that are greater than 1 MW up to 3 MW, the incentives identified above declines according to the schedule below: CapacityIncentive Rate (Pct. of Base) 0 – 1 MW100% >1 MW – 2 MW50% >2 MW – 3 MW25%

PG&E Program Goals Encourage and facilitate more DG systems Reduce Barriers –SGIP Application Requirements –Interconnection Paperwork Expand Marketing & Outreach Efforts Possible partnerships with Developers and State Educate Community about DG systems and SGIP Program –Webinars, Classes, Expos, Conventions

Wind, Fuel Cells, and Advanced Energy Storage

19 Wind Requirements Wind turbine rated capacity is the highest electrical output from the manufacturer’s power output curve for wind speeds up to 30 mph including inverter losses. (Section 2.5.4) Wind Turbine Projects may be sized up to 200% of the Host Customer’s previous 12-month annual peak demand at the proposed Site. (Section ) Equipment: Inverter must be on CEC Approved List, Wind Turbines must be commercially available System Size: > 30 kW, < 30 kW applies through CEC Emerging Renewable Program 5-year system warranty

20 Fuel Cell Requirements Renewable Fuel Cell vs. Non-Renewable Fuel Cell –Renewable Fuel: Biogas, Landfill Gas, Digester Gas –Non-renewable Fuel: Natural Gas, Waste Gas –To qualify as a renewable fuel cell, fuel source must be > 75% renewable Non-Renewable Fuel cells must meet a minimum 40% operating efficiency requirement Fuel Cell Projects may be sized up to 100% of the Host Customer’s previous 12-month annual peak demand at the proposed Site. Equipment: Fuel Cell Equipment must be commercially available System Size: Capped at 5 MW with incentives up to 3 MW 5-year system warranty

21 Fuel Cells – Typical Applications Fuel cells with thermal byproduct (“CHP”) Electric-only fuel cells Ideal site characteristicsLarge thermal load to take advantage of “free” thermal product Coincident thermal and electrical loads to (ensures thermal product can be utilized) Any facility interested in self- generation Low thermal needs (otherwise CHP system may be potentially more attractive) Typical applications Colleges and universities Food/beverage processing Hospitals and prisons Hospitality Manufacturing Wastewater treatment Any facility interested in self- generation Thermal load not necessary for project economics Typical payback period ~ 8 to 15 years, with incentives (varies)

22 AES Background Timeline December VRB submitted a request to include AES as an eligible technology in the SGIP July 2007 – SGIP Working Group delivered split recommendation to CPUC for deliberation Summer 2008 – CPUC conducted additional fact finding through the proceeding. November 2008 – CPUC approved introduction of AES What is AES? AES stands for Advanced Energy Storage. These are battery-like storage systems that convert energy to a storage medium and then reconvert back to energy.

23 AES Requirements AES is to be coupled with a current SGIP technology. It is required that incentives be funded from the same budget as the accompanying technology. Any current or previously funded SGIP projects (Wind or Fuel Cells) is eligible to install AES and receive incentives. AES must be sized no larger than the rated capacity (kW) of the SGIP eligible technology it is operating in concert with. The Advanced Energy Storage Project capacity rating must be the net continuous discharge power output (kW) over a four hour period and must be established from manufacturer documentation.

24 AES Requirements (Cont.) Advanced Energy Storage systems utilizing hydrogen as the storage medium are not eligible at this time. (Section 2.5 and Section 6). Ability to meet IEEE Interconnection standards Ability to operate in distributed, customer sited locations and comply with all local environmental and air quality requirements 5-year system warranty consistent with other eligible program technologies

SGIP Application Process

26 SGIP Application Process Overview Reservation Request Form Proof of Project Milestone (Due 60 days from Reservation) Incentive Claim Form Conditional Reservation Notice (Res/Com - 1 year expiration, Gvt/Non-profit – 1.5 yr expiration.) Reservation Confirmation & Incentive Claim Conduct Field Inspection & Payment Process ApplicantProgram Administrator

27 SGIP Application Process – Step 1 of 4 Reservation Request Form (RRF) Reservation Request Application Form & Checklist Proof of Utility Service 12-month Electric Load Documentation Proof of Adequate Renewable Fuel Source (Renewable Fuel Cell Only) Waste Heat Emission Worksheet (Non-Renewable Fuel Cell Only) Application Fee – 1% of requested incentive –For equipment that is not commercially available

28 SGIP Application Process – Step 2 of 4 Proof of Project Milestone (PPM) Proof of Project Milestone Checklist Copy of Executed Installation Contract Revised Minimum Operating Efficiency Calculations (Non- Renewable Fuel Cells, if applicable) Fuel Clean-Up Equipment Purchase Order (Renewable Fuel Cells Only) Renewable Fuel Affidavit (Renewable Fuel Cells Only)

29 SGIP Application Process – Step 3 of 4 Incentive Claim Form (ICF) Incentive Claim Form & Checklist Proof of Authorization to Interconnect Final Project Cost Breakdown Worksheet Final Project Cost Affidavit Final Building Permit Inspection Report Substantiation of load (if applicable) Substantiation of Renewable Fuel Source (Renewable Fuel Cells Only) Revised Sizing Calculations (if applicable) Revised Minimum Operating Efficiency Calculations (Non-Renewable Fuel Cells, if applicable) Final Fuel Clean-up Skid Documentation (Renewable Fuel Cells only) Final Air Permit Documentation (Non-Renewable/Renewable Fuel Cells Only)

30 SGIP Application Process – Step 4 of 4 Field Inspection Required for all SGIP projects Verify Make, Model, and System Sizing of Equipment Installed Verify Load Substantiation for project Verify Fuel Source Confirm Permanency of Installation

31 Net Energy Metering Options NEM Wind (NEMW) –Full retail credits < 50 kW systems –Generation credits only > 50 kW systems NEM Fuel Cells (NEMFC) –Generation credits only NEM Biogas (NEMBIO) –Generation credits only –Dairies can apply generation credits to other accounts NEM Multiple Technologies (NEMMT) –For meters with hybrid technologies or –NEM and Non-NEM interconnection NEM limited to 1 MW per meter Rule 21 Non-Export –Generators that will never export –Simpler billing for customers

32 Quick Tips Perform EE audit and implement measures –No Cost –Low Cost –Investment Contact PV consultants or vendors Solicit bids from multiple vendors Evaluate proposals using standardized criteria Inspect PV system periodically

33 SGIP Resources SGIP Contact Information SGIP Hotline: (415) SGIP Inbox: Website: Interconnection Contact Information Interconnection Hotline: (415) Interconnection Inbox: Website:

34 Q&A Questions?