Chapter 4 More Interest Formulas
CTC 475 Review Interest/equity breakdown What to do when interest rates change Nominal interest rates Converting nominal interest rates to regular interest.
Engineering Economics I
Engineering Economics ENGR 3300
1 Warm-Up Review Homepage Rule of 72 Single Sum Compounding Annuities.
ACCT 201 ACCT 201 ACCT Time Value of Money UAA – ACCT 201 Principles of Financial Accounting Dr. Fred Barbee.
ANNUITIES Sequences and Series
Engineering Economics
Engineering Economics Outline Overview
(c) 2002 Contemporary Engineering Economics 1 Chapter 4 Time Is Money Interest: The Cost of Money Economic Equivalence Development of Interest Formulas.
Recap of Previous Lecture Equivalence Equations Type I Interest rate is fixed or changes a finite number of times within the year Equivalence Equations.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
(c) 2002 Contemporary Engineering Economics
Chapter 7 Engineering Economic Analysis Time Value of Money.
By Assoc. Prof. Dr. Ahmet ÖZTAŞ GAZİANTEP University Department of Civil Engineering CE ECONOMIC DECISION ANALYSIS IN CONSTRUCTION Chapter III- Nominal.
(c) 2002 Contemporary Engineering Economics
Flash Back from before break The Five Types of Cash Flows (a) Single cash flow (b) Equal (uniform) payment series (c) Linear gradient series (d) Geometric.
LECTURE 6 NONUNIFORM SERIES Prof. Dr. M. F. El-Refaie.
EGR 403 Capital Allocation Theory Dr. Phillip R. Rosenkrantz
Engineering Economic Analysis - Ninth Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis.
Engineering Economic Analysis Canadian Edition
Topic 9 Time Value of Money.
Chapter 4 The Time Value of Money Chapter Outline
Time Value of Money – Part II
Naval Postgraduate School Time Value of Money Discounted Cash Flow Techniques Source: Raymond P. Lutz, “Discounted Cash Flow Techniques,” Handbook of Industrial.
Summer Time Value of Money Session 2 07/02/2015.
ISU CCEE CE 203 Annual Cash Flow Analysis (EEA Chap 6)
Single-Payment Factors (P/F, F/P)
Exam I Review Exam is closed text book, no loose sheet paper
Finance 2009 Spring Chapter 4 Discounted Cash Flow Valuation.
ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)
Engineering Orientation Engineering Economics. Value and Interest The value of a dollar given to you today is of greater value than that of a dollar given.
Multiple/Continuous Compounding. Understand Effective Interest Rates Figure out how to use Inflation/Deflation in your decisions.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 4-1 Developed.
MIE Class #3 Manufacturing & Engineering Economics Concerns and QuestionsConcerns and Questions Quick Recap of Previous ClassQuick Recap of Previous.
Equivalence and Compound interest
Single-Payment Factors (P/F, F/P) Fundamental question: What is the future value, F, if a single present worth, P, is invested for n periods at an ROR.
Engineering Orientation Engineering Economics. Value and Interest Cost of Money Simple and Compound Interest Cash Flow Diagrams Cash Flow Patterns Equivalence.
1 EGGC4214 Systems Engineering & Economy Lecture 4 Interest Formulas.
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. The Time Value of Money 9.
ISU CCEE CE 203 EEA Chap 3 Interest and Equivalence.
ISU CCEE CE 203 Present Worth Analysis (EEA Chap 5)
Equivalence of cash flows Construction Engineering 221.
Engineering Economic Analysis Canadian Edition Chapter 4: More Interest Formulas.
Financial Mathematics 1. i = interest rate (per time period) n = # of time periods P = money at present F = money in future –After n time periods –Equivalent.
Interest Formulas for Single Cash Flows
TM 661 M2 - Probs II. Consider a simple five year investment project with discrete end-of-year cash flows shown below. Revenue at the end of year one.
TM 661 Engineering Economics for Managers Unit 1 Time Value of Money.
12/26/2015rd1 Engineering Economic Analysis Chapter 4  More Interest Formulas.
MER Design of Thermal Fluid Systems Econ Lecture 2 Professor Bruno Winter Term 2002.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Living with the lab Engineering Economics - Cash Flow Diagrams Cash flow diagrams provide a simple way to visualize the cash that comes “in” and the cash.
Chapter 5 Time Value of Money. Basic Definitions Present Value – earlier money on a time line Future Value – later money on a time line Interest rate.
Consider a principal P invested at rate r compounded annually for n years: Compound Interest After the first year: so that the total is now 1.
Chapter 4 More Interest Formulas
1. What is the order of magnitude difference between an inch and a mile? between an inch and a mile? 2. How many times bigger is a mile compared to an.
Section 8.3 Compound Interest Math in Our World. Learning Objectives  Compute compound interest.  Compute the effective interest rate of an investment.
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Interest Formulas – Equal Payment Series
Interest Formulas (Gradient Series)
Chapter 2 Time Value of Money
Interest Formulas for Single Cash Flows
LECTURE 6 NONUNIFORM SERIES
Engineering Economic Analysis
Chapter 2 Factors: How Time and Interest Affect Money
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
IET 333: Week 3 Jung-woo Sohn
Presentation transcript:

ISU CCEE CE 203 More Interest Formulas (EEA Chap 4)

ISU CCEE l Arithmetic Gradient: payments increase by a uniform AMOUNT each payment period l Geometric Gradient: payments increase by a uniform RATE each payment period Formulas for non-uniform payments

ISU CCEE Arithmetic Gradient Series AA P P A+GA+G A+2GA+2G A+3GA+3G A+(n-1)GA+(n-1)G = (can be divided into) Amount increases by “G” each period

ISU CCEE Arithmetic Gradient Series Components AA P’P’ P’P’ P ’’ GG AAAAAAAA 2G2G 3G3G (n-1)G(n-1)G

ISU CCEE Arithmetic Gradient Future Worth F ’’ GG 2G2G 3G3G (n-1)G(n-1)G F’’ = [ - n ] (1 + i) n - 1 i The Future Worth of an arithmetic gradient cash flow is given by (see text p for derivation of formula) 00 = G [ ] (1 + i) n – in - 1 i2i2 G i

ISU CCEE Arithmetic Gradient Uniform Series Factor A = G [ ] = G (A/G, i, n) (1 + i) n – in - 1 i {(1 + i) n - 1} If the arithmetic gradient factor is multiplied by the sinking fund factor, the result is called the Arithmetic Gradient Uniform Series Factor: (gives the uniform series cash flow payment equivalent to that of an arithmetic gradient cash flow) (see text p. 100 for derivation of formula)

ISU CCEE In-class Example 1 (arithmetic series) Your company just purchased a piece of equipment. Maintenance costs are estimated at $1200 for the first year and are expected to rise by $300 in each of the subsequent four years. How much should be set aside in a “maintenance account” now to cover these costs for the next five years? Assume payments are made at the end of each year and an interest rate of 6%.

ISU CCEE Geometric Gradient Series A1A1A1A1 A1A1A1A1 P P A 1 (1+g) - Amount changes at the uniform RATE, g - Useful for some types of problems such as those involving inflation A 1 (1+g) 2 A 1 (1+g) 3 A 1 (1+g) 4

ISU CCEE Present Worth for Geometric Gradient Series A1A1A1A1 A1A1A1A1 P P A 1 (1+g) for i ≠ g A 1 (1+g) 2 A 1 (1+g) 3 A 1 (1+g) 4 P = A 1 [ ] 1 - (1 + g) n (1 + i) -n i - g = A 1 (P/A, g, i, n) Can be very complex unless programmed on a computer

ISU CCEE In-class Example 2 (geometric series) You have just begun you first job as a civil engineer and decide to participate in the company’s retirement plan. You decide to invest the maximum allowed by the plan which is 6% of your salary. Your company has told you that you can expect a minimum 4% increase in salary each year assuming good performance and typical advancement within the company. 1) Choose a realistic starting salary 2) Assuming you stay with the company, the company matches your 6% investment in the retirement plan, expected minimum salary increases, and an interest rate of 10%, how much will you have in your retirement account after 40 years?

ISU CCEE Nominal vs. Effective interest rate Nominal interest rate, r: annual interest rate without considering the effect of any compounding at shorter intervals so that i (for use in equations) = r/m where m is number of compounding periods per year (this is what we have been doing)

ISU CCEE Nominal vs. Effective interest rate Effective interest rate, i a : annual interest rate taking into account the effect of any compounding at shorter intervals; also called “yield” An amount of $1, invested at r%, compounded m times per year, would be worth $1(1 + r/m) m and the effective interest 1(1 + r/m) m - 1 i a = (1 + i) m – 1 (see text p. 110, 9 th Ed for derivation)

ISU CCEE ExampleExample A bank pays 6% nominal interest rate. Calculate the effective interest with a) monthly, b) daily, c) hourly d) secondly compounding i a = (1 + i) m – 1 i a monthly = (1 +.06/12) = % i a daily = (1 +.06/365) = % i a hourly = (1 +.06/8760) = % i a secondly = (1 +.06/31.5M) 31.5M -1 = %

ISU CCEE Continuous Compounding The effective interest rate for continuous compounding (i.e., as the length of the compounding period → 0 and the number of periods → ∞) i a = e r – 1 (see text pp for derivation and equations involving continuous compounding) In our previous example, i a = e 0.06 – 1 = %

ISU CCEE Nominal vs. Effective interest rate Comparison of nominal and effective interest rates for various APR values and compounding periods Nominal rateEffective interest rate, i a, for compounding … rYearly Semi- annuallyMonthlyDaily Contin- uously

ISU CCEE l Cash flow period is not equal to compounding period l There is cash flow in only some of periods l Pattern does not exactly fit any of basic formulas l Etc. Adjustments may be needed because…

ISU CCEE Partial review l Single payment compound amount F = P(1+i) n = P(F/P,i,n) l Uniform series (sinking fund) l Arithmetic gradient series A = F [ ] = F (A/F, i, n) (1 + i) n - 1 i A = G [ ] = G (A/G, i, n) (1 + i) n – in - 1 i {(1 + i) n - 1}