The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
 Outline: ◦ 325 MHz Superconducting Spoke Resonators in the Project X Linac (HINS front end). ◦ SSR1 Single Spoke Resonator with β g =.21: Fabrication.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Ofelia Capatina on behalf of the CERN specification team
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
First TBL PETS prototype tank development D. Carrillo, E. Rodríguez, F. Toral, CIEMAT N. Chritin, S. Doebert, I. Syratchev, CERN CERN, 24/01/2008 Courtesy.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Page 1 Jean Delayen HyeKyoung Park Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
Dr G Burt (CI), Dr R. Rimmer (Jlab), H. Wang (Jlab) & B. Hall (CI)
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
6 TH C RAB C AVITY W ORKSHOP – December 9-11, 2013, CERN (Geneva, Switzerland) Silvia Verdú-Andrés Silvia Verdú-Andrés on behalf of (BNL) Sergey Belomestnykh,
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Page 1 Subashini De Silva Center for Accelerator Science Old Dominion University CAVITY II – RF-DIPOLE CAVITY TEST RESULTS LHC – CC-13, CERN December 9-11,
Compact Crab Cavity Status E. Jensen for WP4 R. Appleby, T. Baer, J. Barranco, I. Ben-Zvi, G. Burt, R. Calaga, E. Ciapala, S. Da Silva, J. Delayen, L.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Cavity support scheme options Thomas Jones 25/06/15 1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Progress in unconventional RF structures Dr Graeme Burt Cockcroft Institute, Security Lancaster, Lancaster University.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
WP 4: Crab Cavity Ed Ciapala, Erk Jensen BE-RF, CERN HL-LHC Meeting, CERN, 20 July 2010.
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Page 1 Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator Facility.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
A Four Rod Compact Crab Cavity for LHC Dr C Lingwood for Dr G Burt Lancaster University / Cockcroft Institute.
CERN – Zanon discussions
RF Dipole HOM Electromagnetic Design
Review of options for crab cavities in LHC:
Manufacturing Process
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Odu/slac rf-dipole prototype
SPS – RFD Experience and Evolution to LHC
DQW HOM filter fabrication quality control
SC spoke cavity for China-ADS 3~10MeV injector
Double Quarter Wave Crab Cavity
Crab Cavity Manufacturing Readiness Meeting
HWR Cavities for China ADS
Discussion on the TDI impedance specifications
SPS-DQW HOM Measurements
Double-Spoke Cavities
HWR and Test Cryomodule for China ADS
Presentation transcript:

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Rod Crab cavity Status G. Burt on behalf of 4RCC collaboration

Cavity Shape MV/m mT Transverse R/Q915 Ohms Cavity fitted LHC scenario (84 mm aperture compact transverse size) and has tolerable fields at the design gradient. Removal of voltage variation. R T /Q=(V(a) 2 /wU)*(c/  a) 2

Multipactor Multipactor on the beam pipe was found on the beam pipe at ~2 MV. Same type of multipacting was seen on KEKB crab cavity. Studies with processed surface SEY shows it can be processed through CI SAC meeting October 2012

1. Conventional fabrication, ideal RF design Fabricate from multiple pressed sections (multiple dies) Fabricate from multiple pressed sections (multiple dies) Multiple multi-axis e-beam welds (esp. rod to end plate joint) Multiple multi-axis e-beam welds (esp. rod to end plate joint) May be possible but weld development needed. May be possible but weld development needed. E-beam weld line of sight Almost parallel weld

2. Machine end plates and rods from solid Consider to make major parts from solid Consider to make major parts from solid Wire EDM pre-forms from ingot Wire EDM pre-forms from ingot Machine all surfaces Machine all surfaces Add beam pipes and can Add beam pipes and can This allows any material thickness or even a variable thickness. Also stiffeners can easily be added. This allows any material thickness or even a variable thickness. Also stiffeners can easily be added. This will also allow fine detail to be added to avoid multipactor (like the ridges suggested by SLAC for the 800 MHz elliptical cavity) This will also allow fine detail to be added to avoid multipactor (like the ridges suggested by SLAC for the 800 MHz elliptical cavity) However a substantial lump of Nb ingot is required (£50k worth) However a substantial lump of Nb ingot is required (£50k worth)

Rod profile can be reduced to allow both base plates to be wire etched from a single block of niobium. Rod profile can be reduced to allow both base plates to be wire etched from a single block of niobium. This saves the amount of Nb required by 20%. This saves the amount of Nb required by 20%. Clearance of 2mm between both rods to allow wire EDM. Clearance of 2mm between both rods to allow wire EDM. Alternative fab, slightly modified RF design

Modified Rod Shape Reduced tip size leads to a 10% increase in peak surface electric field. Reduced tip size leads to a 10% increase in peak surface electric field. Original design Reduced profile MV/m35.9 MV/m mT60.1 mT Transverse R/Q915 Ohms963 Ohms OriginalReduced profile E Abs B Abs

11 Mechanical Design

Additional heating on the ports The lengths of each port has to be carefully chosen to avoid excessive additional losses at the flanges which will make it impossible to measure the Qo of the cavity when testing The lengths of each port has to be carefully chosen to avoid excessive additional losses at the flanges which will make it impossible to measure the Qo of the cavity when testing 50 mm is sufficient for our cavity

Pressure sensitivity The outer can needs a thickness of at least 3 mm in order to minimise the pressure sensitivity to below 100 Hz/Torr. This is a relatively small dependance and is due to the fact that the frequency is dependant on the cavity length and the cavity is quite stiff to longitudinal pressure.

Stiffening Ribs The stress on the outer can exceeds the 70 Mpa yield strength of Nb at room temp with 2 bar pressure. The stress on the outer can exceeds the 70 Mpa yield strength of Nb at room temp with 2 bar pressure. Stiffening ribs were added to the cavity to reduce the stress to tolerable levels. Stiffening ribs were added to the cavity to reduce the stress to tolerable levels.

15 Parts after trimming and final polishing

Cavity Welding 16 All components inspected for surface imperfections prior to etch. All components inspected for surface imperfections prior to etch. 20 micron etch on all weld joints. 20 micron etch on all weld joints. Weld Chamber pumped down to 3.7x10 -5 torr before welding. Weld Chamber pumped down to 3.7x10 -5 torr before welding. Surface temperature of all welded components below 160ºF when chamber opened. Surface temperature of all welded components below 160ºF when chamber opened. All weld seems visually inspected before removing components from chamber. All weld seems visually inspected before removing components from chamber. Post weld cavity leak check performed using copper gaskets, and conflat blanks. Post weld cavity leak check performed using copper gaskets, and conflat blanks. No detectable leaks found (minimum detectable leak of 1.0x torr ℓ/s) No detectable leaks found (minimum detectable leak of 1.0x torr ℓ/s)

4 Rod prototype built NIOWAVE CI SAC meeting October 2012

Tests at CERN SM18 The cavity was prepared for vertical testing mid-November at CERN in SM18.

1 st test results (preliminary) Helium processing due to leak? Low Q probably due to incomplete cleaning.

We now have lots of LHC crab prototypes