Construction Engineering 221 Cost Estimating and Bidding.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
Construction Contracting
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Construction Engineering 221 Cost Estimating and Bidding II.
Construction Cost Estimation Michael Mincic Civil Engineering Technology Department 22 February 2007.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Chapter18 Contract Construction 1CE 417, King Saud University.
Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.
Chapter 5 Cost Estimating and Bidding BCN 4708 Fall 2008.
Marcy Mealy Procurement Specialist CDBG Program
CIVL202 Construction Engineering I
PREPARED BY: Mohammed Tanbora SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
Construction Engineering 221 Drawings and Specifications.
1 CDBG Procurement Requirements For Local Officials.
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
Expectations What your Construction Professional, Architect, Construction Manager/Contractor expects from you? What you can expect from your Construction.
1 Construction Engineering 221 Construction Insurance.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Technical Manager; Bechtel Oil, Gas & Chemicals.
Construction Contracts and Project Delivery Methods
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specification & Quantities Estimating
Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
King Fahd University of Petroleum & Minerals
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
CONSTRUCTION CONTRACTS DOCUEMENTS
TYPES OF CONTRACTS.
Webinar for FY 2011 i3 Grantees February 9, 2012 Fiscal Oversight of i3 Grants Erin McHughJames Evans, CPA, CGFM, CGMA Office of Innovation and Improvement.
CON 4003 CVE 4073/5073 Construction Cost Estimating Class #2: The Estimating Process Prof. Ralph V. Locurcio, PE.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Conaway Conference March 15-16, 2016 “A Bridge from Concept to Construction” A Contractor’s Perspective.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
FIDIC Tendering Procedures
TD Government Solutions
TD Government Solutions
Estimating Project Costs
Costs and Economics of Construction
(Additional materials)
9/18/2018 Bids CONTRACTING Khamis…..
Engineering Project Tendering.
CIVL 493 CONSTRUCTION MANAGEMENT
Traditional Steps Leading To A Bid Document
Directed Change Constructive Change
Presentation transcript:

Construction Engineering 221 Cost Estimating and Bidding

Construction Engineering RPQs 1. Lump-sum and unit-price estimates are forms of fixed-price estimates. A = True B = False 2. The “bidding climate” refers to the anticipated weather conditions during the duration of a project. A = True B = False 3. An employee of a contractor pays $450 per month for his/her portion of the medical insurance. This is an example of a contractor’s indirect labor costs. A = True B = False

Construction Engineering RPQ #1 1. Lump-sum and unit-price estimates are forms of fixed-price estimates. A = True B = False The correct answer is A = True

Construction Engineering RPQ #2 2. The “bidding climate” refers to the anticipated weather conditions during the duration of a project. A = True B = False The correct answer is B = False

Construction Engineering RPQ #3 3. An employee of a contractor pays $450 per month for his/her portion of the medical insurance. This is an example of a contractor’s indirect labor costs. A = True B = False The correct answer is B = False

Construction Engineering Important Estimating Principle Become thoroughly familiar with the bid documents. Why?

Construction Engineering Because……. Accurate quantity takeoff of material Accurate quantity takeoff of labor Determine general and project overhead What equipment will be needed and when

Construction Engineering More Reasons…… Begin the formation of a project schedule Determine how project will be managed Develop a list of questions (get answers) Begin a relationship with owner/AE

Construction Engineering What Must Happen…… In the arena of competitive bidding for a contractor to stay in business? AND In the arena of negotiated bidding what must happen in order to continue to attract clients to the negotiated process?

Construction Engineering Estimating Is Very Important In the competitive arena Need to be low bidder on sufficient number of projects to maintain a revenue base And realize a reasonable profit to stay in business. In the negotiated arena Reliable advanced cost information that will become the “project cost”

Construction Engineering Fixed-Price Estimate Forms Lump-Sum Estimates Building construction Nature of work and quantities will defined Great for owner – financing and risk Unit-Price Estimates What type of construction is normally bid using unit- price estimates? Nature of work is still well defined Quantities of material or work items not precise Who first determines quantities of work items? Quantities shown for each work item.

Construction Engineering Estimate Foundation What is the term use to describe a complete listing of all the materials and items of work that will be required for a project? (foundation to a good estimate) Quantity survey or quantity take-off

Construction Engineering Bidding Procedures Private – procedures (rules and regulations) normally established by owner and AE Public – procedures follow various procurement statutes developed by federal, state, county and municipal governments

Construction Engineering QUESTION ? Why do we have public bidding statutes (laws)? Public bidding statutes are designed to protect the public interest, not that of the contractor or AE. Their essential purpose is to protect public funds; prevent fraud, collusion, and favoritism; and obtain quality construction at reasonable and fair prices.

Construction Engineering Decision to Bid The decision to bid by the contractor depends on the bidding climate. What is meant by “Bidding Climate”? The bidding climate is the affected by: 1.Bonding capacity considerations 2.Location of project 3.Severity of contractual terms (contractor responsibilities and liabilities) 4.Owner and their financial status 5.Who is the architect/engineer 6.Nature and size of project as it relates to company experience and equipment 7.Labor conditions and supply 8.Completion date

Construction Engineering The Bidding Period Why is a reasonable bidding period important? 1.An accurate bid requires adequate time 2.Too little time to bid results in contractors either not bidding or bidding too high 3.Result of “rushed” or “quick” bids is NOT a lower price 4.When unsure, contractors add CONTINGENCY $$$$$$$ to their bid

Construction Engineering Preparing a Bid Preliminary Considerations Become familiar with Instruction to bidders Proposal form Alternates General and supplementary/special conditions Drawing and specifications (addenda) Form of the contract Prebid meeting (in-house) Prebid meeting (with owner)

Construction Engineering Preparing a Bid (cont.) Jobsite visit Observe job site specific conditions that must be covered in the bid (site access, logistics…) Bid invitations Quantity surveys (take-offs) Unit-price project (AE’s #’s vs contractors) Experience needed to do quantity surveys? General contractor’s cost estimate of own work

Construction Engineering Bid Components Material Costs – anything that becomes a part of the finished structure Material Allowance – What is it? Example? Direct Labor costs Basic wage rates of the labor categories Production rate that applies to the work type The largest areas of uncertainty Where is the most reliable labor productivity information to found? HISTORICAL COST DATA