3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee.

Slides:



Advertisements
Similar presentations
Vacuum Vessel Production Readiness Review
Advertisements

Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Chapter 5 – Design for Different Types of Loading
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems X-LAT Assy1 GLAST Large Area Telescope: Mechanical.
Cavity support scheme options Thomas Jones 25/06/15.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
1 LHC-DFBX Shipping Specification Steve Virostek LBNL Presented at the DFBX RFP Review October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC.
Cavity support scheme options Thomas Jones 25/06/15 to 06/07/15 1.
Stress and Cool-down Analysis Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
3.9 GHz Cryomodule Transport December 17, 2007 Mike McGee, Chuck Grimm & Warren Schappert 3.9 GHz CM Transport Review.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Design Stress & Fatigue
Mechanics of Materials Lab
IHEP High Power Input Coupler Activity Report First Mini-workshop on IHEP 1.3 GHz Superconducting RF project June 10th, 2009, Beijing IHEP High Power Input.
Nikolay SolyakILC-GDE, Beijing, Feb.4-8, Fermilab 3 rd Harmonic Cryomodule Status N.Solyak, H. Edwards, D.Mitchell, M.Foley, T.Khabiboulline, E.Harms,
1.3GHz Input Coupler for ILC
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
An alternative spectrograph mount Bruce C. Bigelow University of Michigan Department of Physics 5/14/04.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
LCLS-II FPC Aluminum Waveguide Box Karen Fant with work done by Chris Nantista and Ken Premo 6/24/2015.
Cavity support scheme options Thomas Jones 1. Introduction Both cavities will be supported by the fundamental power coupler and a number of blade flexures.
Jiangyu Li, University of Washington Yielding and Failure Criteria Plasticity Fracture Fatigue Jiangyu Li University of Washington Mechanics of Materials.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Type IV Cryomodule (T4CM) Vibration Analysis Update January 23, 2007 Mike McGee 3 rd T4CM Meeting at INFN-Milan.
56 MHz SRF Cavity and Helium vessel Design
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Cavity support scheme options Thomas Jones 25/06/15 1.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Comments from the SNS Cryostat Design Review February 2010 Tom Peterson, Fermilab 15 February 2010.
RFQ Installation Status 10/27/2015 October 27, 2015 Jim Steimel & Curtis Baffes.
ISSUES TO ADDRESS... How do flaws in a material initiate failure? How is fracture resistance quantified; how do different material classes compare? How.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
LCWS11 WG4 Fully featured accelerating structure engineering design
Assembly of the doorknob
SPL RF coupler: integration aspects
TDR guideline discussion on Cavity Integration
Stress and cool-down analysis of the cryomodule
T5.2: Harmonization - Material and Component Reference
FNAL recent coupler troubles
Power coupler at DESY & for XFEL
Bellows Vibrations in the 3.9 GHz Cryomodule
The broken HOM Couplers on 3.9 GHz Cavity #2
V. Veshcherevich Cornell University
Main Coupler R&D at DESY
CW accelerating module test progress at DESY
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
V. Veshcherevich Cornell University
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
Presentation transcript:

3.9GHz Coupler Cold End Robustness Study Will Couplers survive on-site and overseas shipping? D. Olis, G. Galasso, M. McGee

The Coupler Cold End Outer Conductor / Warm End Waveguide

Final Assy. of couplers

Coupler installed on the test stand support

Ship w/ Cold Coupler Only Protect Cold End ceramic with cap. Without support of 80K flange during shipping, Cold End is cantilevered on cavity –This is a load on the cavity flange. Excessive? –Perhaps design a soft connection between coupler and vacuum vessel to damp motion of Cold End to protect cavity.

Transporting Cryomodules Cryomodule shipping options: 1.Ship individual components, assemble & align at final use point 2.Ship assembled cavity string, complete assembly and alignment at final use point 3.Ship assembled and aligned cryomodule In all cases, coupler antenna tip is unsupported. Will shipping loads & vibrations cause undue stress on ceramic window, copper collars, or antenna?

Cold End Assembly Cold End ceramic window

Failure Modes Will ceramic RF window fracture or develop a leak? Will antenna position move off center axis?

The first “test”: delivery from CPI. Good news: couplers survived shipment from vendor (domestic: Boston to Fermi). ~1dozen 1.3GHz TTF3 couplers have been shipped from DESY to Fermi (same ceramic design).

Study Plan FEA and hand calc’s using g-loads recorded during shipping of cavities between DESY and Fermilab Mechanical tests –Simple harmonic and drop test.

FEA Results (M. McGee, G. Galasso) Load = 1G from earth + 6G shocks Above: antenna (316L SS) max stress is 700PSI. Left: cold window (97% alumina) max stress is 550PSI. Stress is the same at interface with OFHC copper collars. These are pretty darn small!

ItemMat’l Predicted Stress [KSI] Yield Strength [KSI] Ultimate Strength [KSI] Endurance Limit [KSI] Antenna 316L stainless Collars OFHC copper RF window 97% alumina G loads well below allowable limits

Ansys: 0.12 mm tip of the antenna Static analysis. Load: acceleration 11G Maximum displacement Comsol: 0.11 mm tip of the antenna FEA by G. Galasso

mm mm mm Static analysis. Load: acceleration 11G Maximum displacement review Conclusion: Do NOT attempt to damp this end of Cold coupler. It could do harm without any benefit.

Window Brittle Failure Analysis At 550PSI stress, minimum crack length in alumina that results in catastrophic failure is 21.3 inches. –Window will not fail suddenly due to 6G shock At +/- 550PSI alternating stresses, any existing micro-cracks will not grow. –Window will not fail in fatigue due to 6G cyclic loads

Test Plan Load plan –Vibration analysis –Drop/shock tests Instrumentation –Accelerometers Measurements, before & after sdrop test –Leak check, CMM

Vibration Test To confirm harmonic characteristics

Modal Freq. [Hz] AnsysComsol 1 st nd rd rd 2nd 1st Real test. Impulse Response FE Model Modal Analysis Analysis by G. Galasso

Frequency Response. Load: 1 st mode Results in the frequency range 190 Hz<first natural Freq< 210 Hz ξ =0.005 Typically for metals like Stainless Steel: 0.01<ξ<0.005 Von Mises Stress [MPa] vs. Frequency antenna 67MPa/9.7ksi 200 Hz 8MPa/1.1ksi 200 Hz Von Mises Stress vs. frequency Copper-ceramic interface Analysis by G. Galasso

ItemMat’lPredicted Stress [ksi] Yield Strength [ksi] Displace- ment [mm] Antenna316L SS CollarsOFCH Copper Window97% Alumina (Ultim. Str.) Frequency Response. Load: 1 st mode Review Worst case considered: 1 st modal frequency range (190Hz-210Hz) Damping factor

Cold End Coupler drop test Test Coupler is simplified:  Window, 4.5”CF flange, antenna, and window  No copper plating  Instrumentation, inspection of antenna is easier Test Piece Input coupler

Drop Test plan Incremental increase in G-load until failure Leak check and CMM measurement between increments. Brazed assemblies to be rec’d in early January.