Greendale Baseball Stadium

Slides:



Advertisements
Similar presentations
Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
Advertisements

Facilitated by Joanne Fraser RiverSystems
21 st Century DIAMOND Parker Field The Diamond 21 st Century Diamond –
Project Management Information Systems and Management.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
Peak LAN Project Kirk Baringer Meagan Beeman Allison Benton
Date ▪ Educational Program - Update Automotive Options ▪ Practice Fields - Additional Options Agenda – Rebuild Stafford High School.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Project Planning. Learning Objectives: By the end of this topic you should be able to:
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Risks  All projects have some degree of risk  Risks are issues that can cause problems  Delay in schedule  Increased project costs  Technical risk.
Project management A whistle-stop tour Toot!. Places to see Overview Project design in detail Task analysis example Design documentation examples Terminus.
PROJECT TIME CONTROL. PROJECT SCHEDULING REFERENCES PRIMARY REFERENCE IN THIS PRESENTATION IS Operations Management, Ed 6, Heizer & Render, Prentice Hall,
Systems Analysis and Design 8th Edition
Introduction to Project Management ECE 480 Erik Goodman.
Telecommunications Project Management Time and Cost Management.
The Analyst as a Project Manager
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
07 – Project Management Software
CIS 321—IS Analysis & Design Chapter 3: The Analyst as a Project Manager.
PROJECT COMPLETION TIMELINE
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Cost and Time Control. Project completed on time and on budget –Want to get done early –Lower costs –More profit.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Project Management Formal Methods. How do you monitor a project?
Project Management 101 Business Management.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
OIRM Business Process Planning Overview for Business & Operations Advisory Committee May 27 – 28, 2015.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
Introduction to Central Services Branch Building a caring correctional system that truly belongs to all PROGRESS ON THE 7 DAY ESTABLISHMENT PORTFOLIO COMMITTEE.
Implementation Orientation. We are here to set you up for success! We guide you through an implementation process designed for successful launch and continued.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Project Management Planning Techniques
LOOKING BEYOND THE DEAL: WHAT YOU SHOULD EXPECT IN EFFECTIVELY INTEGRATING PEOPLE, PROCESSES, AND ASSETS INTO A VIBRANT BUSINESS.
Outsourcing of Census Operations United Nations Statistics Division UNSD-ESCWA Regional Workshop on Census Data Processing in the ESCWA region: Contemporary.
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Class 5 – Planning IT Projects
Rightsizing Project Management with EasyProjects Val Harper, Faculty Fellow for Project Management University Library, University of New Hampshire Problem:
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
Fall CS-EE 480 Lillevik 480f06-l9 University of Portland School of Engineering Senior Design Lecture 9 Project management Project plan Change request.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
Managing the Project Lifecycle
Systems Analysis and Design in a Changing World, 4th Edition
Project scheduling Precedence diagram method Project Management
Project scheduling Precedence diagram method Project Management
CHANNEL DISTRICT ACTION TEAM
 I – INTRODUCTION  II – PRESENTATION  III-CHARACTERISTICS  IV– CONSTRUCTION a- Construction of concrete structure b- Roof construction c- Difficulties.
Facilities Report to the Buffalo State College Senate May 6, 2016
Project Management in Construction And Its challenges in Armenia
Introduction to Project Management ECE 480 Erik Goodman.
On the National Scene.
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
Construction Considerations
Project Progress Summary - Week 18
Project Scheduling KULIAH 10 Magister Sistem Informasi
Regional WMS Migration Governance Meeting
Overall Project RAG Status:
Presentation transcript:

Greendale Baseball Stadium D & G Project Management This presentation will outline the project plan developed by D&G Project Management Firm for the Greendale Baseball Stadium build. This presentation was developed by Zachary J. Gooch for use by the D&G Project Management Firm.

Project Objectives Build the new 47,000 seat Greendale baseball stadium. Start Construction on July 1, 2010 and complete by May 20, 2012. Complete construction by the start of the 2012 baseball season. Complete project on time and under budget. The build for the new 47,000 seat Greendale baseball stadium will start by July 1, 2010 and will be set for completion by May 20, 2012. This timeline was developed to have the stadium opened and operational by the 2012 baseball season opener. This is a large contract and will be a benchmark for the firm. Baseball stadium renovation is a growing market and our firm would like to set the bar high with the Greendale stadium project. We are excited and eager to take on this challenge.

Project Challenges The project must be completed in time to start the 2012 baseball season. Adjacent building must be demolished to build construction site. Penalty clause of $100,000 per day past deadline. Multiple observable holidays that fall within the construction period. Retractable roof must have measurements early to ensure completion on schedule. This project is not without it’s problems. There are a few challenges that must be overcome. The biggest of these challenges is completing the stadium in the target time so that the stadium is fully operational by the 2012 baseball season. Although this deadline sets a small window in which to complete this project our firm feels confident that the project will be a major success. If the stadium is not completed by that timeframe there is a $100,000 per day penalty to the company until the stadium is completed and open for business. There are also multiple observable holidays during this time period that will have to be negotiated to conserve time and preserve schedule. Many of the construction elements are dependent upon one another for timely completion.

Project Tasks and Estimated Timing Duration Clear stadium site 70 days Demolish Building 30 days Set up construction site Drive support pilling 120 days Pour lower concrete bowl Pour main concourse Install playing field 90 days Construct upper steel bowl Install seats 140 days Build luxury boxes Install jumbotron Stadium infrastructure Construct steel canopy 75 days Light installation Build roof supports Construct roof 180 days Install roof tracks Install roof Final inspections 20 days The list of tasks above are all the tasks that must be completed to finish the stadium project. The time durations listed next to each task are the number of days estimated to complete said tasks. The durations are estimates and are padded for minor delays. Many of these tasks will be completed simultaneously so the timeframes will run concurrently. These tasks will be broken down into three phases of work packages that will be codependent upon one another and crucial to the success of the project.

Project Milestones Completion of site preparation Completion of Phase I Completion of Phase II Completion of Phase III The milestones listed above are target completions and will be updated throughout the project and represent the work packages that must be completed on time and on budget. These are general milestones and the work packages beneath each will be outlined for ease of understanding. Some of the sub tasks in the work packages by their nature and timeline will overlap into different phases but will be assigned to a phase to ease the tracking of the steps towards completion.

Project Timeframe Phase I Clearing construction site Demolition of building Building support site Driving support pilings Construction of lower concrete bowl Main concourse pour Playing field install Construction of upper steel bowl Estimated Completion: 460 days Phase I consists of a large majority of the preliminary set-up and preparation for the project. This phase also contains the initial construction of the stadium along with installation of the playing field. This phase is crucial because of the infrastructure that is being installed in the stadium. This phase contains the backbone of the stadium and many other tasks are unable to be started until these initial contraction tasks have been finished. Although 460 days seems like a long time this phase will prove to be the longest phase and will help to start other areas of the project to help save time in the end.

Project Timeframe Phase II Luxury box installation Seat installation Jumbotron installation Stadium infrastructure (bathrooms, locker rooms, restaurants, etc.) Estimated Completion: 240 days Phase II consists of interior installations. This phase is slated to take 240 days, however it is important to note that Phase II tasks will begin around the mid-point of phase one. This overlap will allow Phase I tasks to finish while Phase II tasks are being accomplished. The idea is to complete as much work at the same time as safely possible. This will help to save time and money on overdue tasks. Once these tasks get started they can be worked while Phase I ramps down and Phase III readies to ramp up.

Project Timeframe Phase III Construction of steel canopy Installation of lighting Installation of the Retractable roof - Retractable roof planning and construction will run parallel to the entire project. (This represents the critical path) Inspection of the Stadium Estimated Completion: 305 days As with the other two phases, Phase III will have tasks that run parallel to the other phases. Phase III represents the critical path for this project because if work is affected on the first two phases then Phase III will be unable to start. It is crucial that each phase be tracked and monitored for timely completion. There will be updated progress reports on the phases of the project and the estimated completion times for the phases as well as the project as a whole.

Project Costs Equipment Manpower Overtime Administrative costs Above is an overview of costs for the project from start to finish. The equipment is an understood cost and is factored into the contractors that will work each phase of the project. The manpower cost consists of hiring the contractors and ensuring that there is adequate manpower for project tasks. To resolve the holiday and weekend issues, the suggestion of overtime (time and a half) for workers who work during the holidays and weekends to conserve time. There will be several shifts of different workers who will work day and night shifts to ensure that the project is done one schedule. All other costs are labeled administrative and represent the smallest cost aspect.

Project Returns Future stadium renovation projects Financial return of close to $2 million for the company Valuable insight on stadium construction projects The returns for the project consist of a financial return for the company of around $2 million if project is completed on time and meets clients specifications. The company will gain valuable insight into stadium projects and be able to take those lessons and apply them to other stadium projects. This project will help attract other clients for stadium renovation projects that can earn large returns for the company.

Project Risk Assessment Risk Event Likelihood Impact Detection Difficulty When Weather related delays 3 4 Entire project Materials delay (Shipping, etc.) 2 5 Roof install delay Phase III Phase delays (any major delays) Entire Project Installation delays (materials, manpower) Phase II, and III Overall project delay Potential to go over scheduled end The slide shows some of the potential risks that are involved with this project. While these are not all the risks, these are the most likely to occur. The assessment shows numerical rankings on a scale of one through five. One is very low, two is low, three is moderate, four is high, and five is very high. The when represents when the risk is most likely to occur during the project.

Project Risk Assessment Matrix Risk Event Response Contingency Plan Trigger Who Is Responsible Weather related delays Reduce Work extra hours/implement 24 hour shifts to makeup lost time Project is pushed back more than 48 hours during any phase Phase manager and project manager Materials delay (Shipping, etc.) Locate source for new materials Materials are causing delays in all areas of phase Roof install delay Request additional assistance for roof install Roof installation is more than 48 hours behind Phase delays (any major delays) Phase is delayed more than a week off of schedule Installation delays (materials, manpower) Bring in extra help and locate new source for materials Overall project delay Project timeline is over schedule by more than three weeks Potential to go over scheduled end Project is nearing estimated completion date and is more than three weeks behind The risk assessment matrix shown above takes the risks identified in the previous chart and breaks them down. The break down includes a contingency plan and trigger for that plan. The matrix also identifies the responsible party for the risk. For this project any major risk decisions that are made will be with the coordination of the phase manager as well as the overall project manager.

Greendale Baseball stadium Project Progress Greendale Baseball stadium D&G Project management firm Phase I Phase I Manager Phase II Phase II Manager Phase III Phase III Manager The above shows the layout of the progress reports that will be put together during the project. Each phase is shown as well as the overall project. The colored circle next to each indicates green, yellow, or red. Green is for on schedule, yellow is for potential to fall off of schedule, and red represents completely off schedule. These progress reports will be generated and dispersed to the clients as well as the phase/project managers. This will provide everyone with an easy to read and understand progress update for the project.

Conclusion Thank you for choosing D&G Project management team for the construction of Greendale Baseball Stadium