STEAM BOWING PROCEDURE OF STAGE # 1

Slides:



Advertisements
Similar presentations
Main Condensate & Feed Systems
Advertisements

CONTROLS OF SUPER CRITICAL BOILERS
OFF DESIGN PERFORMANCE PREDICTION OF STEAM TURBINES
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Operational Ideas for Supercritical Systems The Ultimate Criteria for Appreciation ….. P M V Subbarao Professor Mechanical Engineering Department I I.
Reheater Protection Logic
Boiler Operation Procedures
Circulating Water System
CHEMICAL CLEANING OF PRE-BOILER SYSTEM
ACADs (08-006) Covered Keywords Chemical and volume control system, normal letdown, charging, makeup water flow paths. Description Supporting Material.
Watertube Boiler.
SIPAT SUPER THERMAL POWER PROJECT
Thermal Power Station Plant. Introduction 150 MW Thermal power station plant, produce 450t/hr steam at full load The max steam pressure is 150 bar with.
THERMAL POWER PLANT.
Hydro Milling Group, Inc. welcomes:
Boiler Mountings.
Boiler Circulation Natural Circulation
Steam Power Plant.
Spiral Condensors. Working Principle The Spiral Condensor consists of two sheets stainless steel strips which have been wounded from the centre.
ANY PIPE CONNECTION TO THE TURBINE IS A POTENTIAL SOURCE OF WATER EITHER BY INDUCTION FROM EXTERNAL EQUIPMENT OR BY ACCUMULATION OF CONDENSED STEAM.
M3D - LMEA Coles. Aim To achieve a greater understanding and appreciation of HMS Lancaster’s Pall Rochem Reverse Osmosis Plants.
WELCOME TOPIC- STEAM BLOWING ADANI POWER MAHARASHTRA LTD,TIRODA,
Lesson 7 Steam Power Plant.
Control & Automation For Super Critical Units
Design Criteria for LP BYPASS SYSTEM
SELECTION OF SUPPORTING ARRANGEMENT FOR CRITICAL PIPING By DILEEP PILLAI.
Hydronic Mechanical Controls
TURBINE & COOLING SYSTEM Presented By – AVIJEET PRATAP 07ME12 IET AGRA
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
ACADs (08-006) Covered Keywords Description Supporting Material
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
Plan 2 – Dead-end Seal Chamber Optional Jacket
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
STEAM POWER PLANTS.
Page 1 Petten 27 – Feb ALFRED and ELFR Secondary System and Plant Layout.
Thermal Power Station.
HP BY PASS WARM UP METHODS: (A) Equalising line with orifice (B) Drain line at upstream side of valve connected to downstream side of Main Steam line strainers.
Presentation on Steam Power Plants R.C.Chaturvedi
Boiler Safety Valve Regulations
ARÇELİK TİCARİ KLİMA EĞİTİM DÖKÜMANI APPENDIX.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
DEAERATOR-STAGE-II/TPS-II /NLC INDIA LTD
Lesson 7 Steam Power Plant.
First Law of Thermodynamics applied to Flow processes
Review Questions Chapter 5
V VENTURI SEPARATORS STEAM.
SALIENT FEATURES OF 500 MW BOILER
Thermodynamics Cycles.
Troubleshooting Hydraulic Pumps
EVAPORATIVE EMISSION CONTROL SYSTEMS
DELTAK HEAT RECOVERY STEAM GENERATOR
Presented by:- ARAVIND P V MS S5 NO:-60
UBOH PLTU JAWA BARAT 2 PALABUHANRATU 3 x 350MW
HIGH PERFORMANCE LEVEL CONTROL.
POWER PLANT THERMAL POWER STATION.
Globe Valve - Introduction, Advantage, Disadvantage and Application.
Super critical power plant. HPT IPT LPT CONDENSERCONDENSER FEED WATER FRS STORAGE TANKSTORAGE TANK SEPARATOR BWRP Spiral water walls MS LINE HRH LINE.
Module 3 Domestic Heating/MMA Welding
THERMAL POWER PLANT.
TO PRESENTATION ON SUPERCRITICAL BOILER
Furnace Heat Transfer & Steam Generation
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
AIR COMPRESOR Chapter-13.
WATER AND STEAM SYSTEM.
Boiler Safety Valve Regulations
MERC TRAINING ACADEMY BOILER SPEFICATIONS.
Presentation transcript:

STEAM BOWING PROCEDURE OF STAGE # 1 OBJECTIVE AND PRINCIPLE OF STEAM BLOWING STEPS INVOLVED IN STEAM BLOWING ( WITH PATH DIAGRAM) PROCEDURE OF PRE-STEP STEAM BLOWING PROCEDURE OF MAIN STEP STEAM BLOWING COMPLETION CRITERIAN OF STEAM BLOWING PHOTOS OF SIPAT U # 1 STEAM BLOWING

PRINCIPLE OF STEAM BLOWING OBJECTIVE The purpose of steam line blowing is to remove pipe slag, weld bead deposits and other foreign material from the main and reheat steam systems prior to turbine operation. The cleaning is accomplished by subjecting the piping systems to heating, blowing steam and cooling cycles in sufficient number and duration until clean steam is obtained. PRINCIPLE OF STEAM BLOWING To ensure that sufficient cleaning forces are applied to the piping, the steam momentum during the steam blow must be equal to or greater than the steam momentum at normal maximum load condition. The Cleaning Force Ratio (CFR) is typically used to evaluate if satisfactory blow conditions are obtained. CFR = ( vb / vmcr ) x ( Fb / Fmcr )2 > 1.00 Where vb = specific volume at steam blowing condition vmcr = specific volume at maximum load condition Fb = steam mass flow rate at blowing condition Fmcr = steam mass flow rate at maximum load condition

STEPS OF STEAM BLOWING PRE STEP # 1 : Separator – SH - main steam line- Temporary pipe - martyr valve - tailpipe to atmosphere. PRE STEP # 2 : Separator - main steam line- HPBP – CRH Line – CRH Isolator - martyr valve - tailpipe to atmosphere. MAIN STEP # 1 : Separator-SH-main steam line-MSV-temporary pipe with martyr-valve-NRV-CRH-RH-HRH-IPT Stop Valve-temporary pipe-target-tailpipe to atmosphere MAIN STEP # 2 : Separator-SH-main steam line-MSV-temporary pipe with martyr-valve­NRV-CRH-RH-HRH-LP Bypass valve-temporary pipe-tailpipe to atmosphere

PRE STEP PROCEDURE COMPLETION CRITERIA Start the Boiler as per normal working principle Raise the Seaprator Pressure to 40 Ksc At 40 Ksc Shut all Fuel Burners in service Stop The BRP Pump Open The Martyr Valve Let the pressure fall to 20 Ksc Close The Martyr Valve COMPLETION CRITERIA Clean White Smoke to be observed at the Exhaust of Tail Pipe NOTE : CFR < 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP First Blow at every Step to be given at much reduced pressure to check the temporary piping healthiness

MAIN STEP PROCEDURE Start the Boiler as per normal working principle Raise the Seaprator Pressure to 80 Ksc ( SH O/L Temp : 370 oC) At 80 Ksc Shut all Fuel Burners in service Stop The BRP Pump Open The Martyr Valve Let the pressure fall to 40 Ksc Close The Martyr Valve Maintain the Separator Storage Tank Level Light The Boiler For Next Blowing NOTE : CFR > 1.0 AND NO TARGET PLATE IS TO BE USED DURING THIS STEP First Blow at every Step to be given at much reduced pressure to check the temporary piping healthiness

COMPLETION CRITERIAN No impacts with an diameter larger than 1 mm A Target Plate is used to access the impacts of particle during steam Blowing. Steam Blowing will be declared when No impacts with an diameter larger than 1 mm Not more than 4 impacts with an diameter larger than 0.5 mm Not more than 10 impacts with an diameter of 0.2 to 0.5 mm

Pre Step # 1 : MS Line Steam Blowing Martyr V/v Martyr V/v Final SH Final SH ESV ESV MSV MSV MS Line Martyr V/v Martyr V/v Final SH Final SH ESV ESV MSV CRH NRV CRH NRV CRH Drain Pot CRH Drain Pot IP SV IP SV HP Bypass HP Bypass CRH Line HRH Line HRH Line RH O/L Hdr RH O/L Hdr LP Bypass LP Bypass Open Open Close Close Martyr Valve Martyr Valve LPBP V/ v Steam Blow Line Steam Blow Line Temporary Line Temporary Line

Pre Step # 2 : HPBP / CRH Line Steam Blowing Martyr V/v Final SH ESV MSV Martyr V/v Final SH MS Line ESV MSV CRH NRV CRH Drain Pot IP SV HP Bypass CRH Line HRH Line RH O/L Hdr LP Bypass Open Close Martyr Valve Steam Blow Line Temporary Line

Main Step # 1 : HRH Line Steam Blowing Martyr V/v Final SH ESV MSV Martyr V/v Final SH MS Line ESV MSV CRH NRV CRH Drain Pot IP SV HP Bypass CRH Line HRH Line RH O/L Hdr LP Bypass Open Close Martyr Valve Steam Blow Line Temporary Line

Main Step # 2 :LPBP Line Steam Blowing Martyr V/v Final SH ESV MSV Martyr V/v Final SH MS Line ESV MSV CRH NRV CRH Drain Pot IP SV HP Bypass CRH Line HRH Line RH O/L Hdr LP Bypass Open Close Martyr Valve Steam Blow Line Temporary Line

WATER CIRCULATION SYSTEM To Separator From Separator From Separator STORAGE TANK SH D.S.H. No1 Click Here Sample Cooler Blow Down Tank FLASH TANK MIXING PIECE ZR WR BRP ECO MIXING LINK SH COMMN DRAIN LINE CRH DRAIN LINE CHEM CLEANING SYS BLR FILL PUMP TO ECO FROM FEED WATER TO DRAIN HDR WATER CIRCULATION SYSTEM

Modification # 2 Modification # 1 To D/A Floor From Storage Tank FLASH TANK ZR WR Condensor From Service Water Condensor Dummy Temporary Connection To Station Drain