© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-1 Developing an Implementation Plan Final Design and Implementation.

Slides:



Advertisements
Similar presentations
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v Determining Customer Requirements Cisco Unity Design ProcessPresales.
Advertisements

© 2003, Cisco Systems, Inc. All rights reserved..
Copyright © Open Text Corporation. All rights reserved. Slide 1 Automatic Routing With Captaris FaxPress and FaxPress Premier Darin McGinnes Sales Engineer.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v Understanding Cisco Unity Bridge and Avaya Interoperability Migrating Voice Mail to Unified.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Implement VTP LAN Switching and Wireless – Chapter 4.
Introducing Campus Networks
Lotus Notes - the University of Nebraska Experience Greg Gray University of Nebraska Central Administration Computing Services Network.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-1 Providing Cutover Support and Optimization Final Design and Implementation.
Sweeping lame DNS reverse delegations APNIC16 – DNS Operations SIG Seoul, Korea, 20 August 2003.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—1-1 Understanding Cisco Unity Configurations and Messaging Models Cisco Unity Design Process—Presales.
Operating and Configuring Cisco IOS Devices © 2004 Cisco Systems, Inc. All rights reserved. Operating Cisco IOS Software INTRO v2.0—8-1.
© 2004 Cisco Systems, Inc. All rights reserved. Operating and Configuring Cisco IOS Devices Starting a Switch INTRO v2.0—8-1.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—4-1 Designing Cisco Unity Bridge and Avaya Migrating Voice Mail to Unified Messaging and Interoperability.
Managing Your Network Environment © 2004 Cisco Systems, Inc. All rights reserved. Managing Cisco IOS Devices INTRO v2.0—9-1.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 VLANs LAN Switching and Wireless – Chapter 3.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 VLANs LAN Switching and Wireless – Chapter 3.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—4-1 Migrating from Voice Mail to Unified Messaging Migrating Voice Mail to Unified Messaging.
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—2-1 Ethernet LANs Operating Cisco IOS Software.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—1-1 Understanding the Role of Telephony Components in Cisco Unity Design Cisco Unity Design Process—Presales.
Understand Virtualized Clients Windows Operating System Fundamentals LESSON 2.4.
Testing - an Overview September 10, What is it, Why do it? Testing is a set of activities aimed at validating that an attribute or capability.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—1-1 Messaging Product Overview Cisco Unity Design Process—Presales.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—1-1 Using Active Directory and Exchange 2000 or 2003 in Cisco Unity Design Cisco Unity Design.
© Wiley Inc All Rights Reserved. CCNA: Cisco Certified Network Associate Study Guide CHAPTER 8: Virtual LANs (VLANs)
11 SYSTEMS ADMINISTRATION AND TERMINAL SERVICES Chapter 12.
Final Design and Implementation
© 2004 Cisco Systems, Inc. All rights reserved. Managing Your Network Environment Managing Router Startup and Configuration INTRO v2.0—9-1.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—4-1 Designing VPIM Solutions Migrating Voice Mail to Unified Messaging and Interoperability.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—1-1 Designing with the Directory and Mailstore in Domino Cisco Unity Design Process—Presales.
© 2007 Cisco Systems, Inc. All rights reserved.ICND1 v1.0—4-1 Module Summary  Cisco routers operate at Layer 3, and their function is path determination.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—2-1 Understanding Bandwidth Provisioning Issues The Design Process—Planning.
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity Connection 1.x Documentation What you need to know.
© 2008 Cisco Systems, Inc. All rights reserved.CIPT1 v6.0—5-1 Implementing Media Resources, Features, and Applications Integrating Cisco Unified Communications.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 10: DHCP Routing & Switching.
INSTALLING MICROSOFT EXCHANGE SERVER 2003 CLUSTERS AND FRONT-END AND BACK ‑ END SERVERS Chapter 4.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialBCMSN BCMSN v3.0—2-1 Correcting Common VLAN Configuration Errors BSMSN Module.
VoIP Implementation Pitt County Government September 13, 2004.
1 © 2002, Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Key differences between Cisco Unity Connection and Cisco Unity Manjit.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 5 Cabling LANs and WANs.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—2-1 Understanding Capacity-Planning Considerations The Design Process—Planning.
© 2006 Cisco Systems, Inc. All rights reserved CUDN v1.1—1 Cisco Unity Design and Networking.
Sources of Cisco IOS Honolulu Community College Cisco Academy Training Center Semester 2 Version 2.1.
1 © 2005 Cisco Systems, Inc. All rights reserved. Session Number Presentation_ID Cisco Public Cisco Unity Connection Notification Jane Rygg Core Services.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Connecting to the Network Introduction to Networking Concepts.
Network design Topic 6 Testing and documentation.
Unity 5.0 TOI. © 2006 Cisco Systems, Inc. All rights reserved.2 Logging changes Licensing changes 144 port support Michael McCann
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 VLANs LAN Switching and Wireless – Chapter 3.
© 2006 Cisco Systems, Inc. All rights reserved.1 Documentation for Cisco Unity 5.0 (Woo)
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-1 Developing a High-Level Design Final Design and Implementation.
© 2006 Cisco Systems, Inc. All rights reserved. ICND v2.3—1-1 Configuring Catalyst Switch Operations Identifying Problems That Occur in Redundant Switched.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 VLANs LAN Switching and Wireless – Chapter 3.
1 © 2005 Cisco Systems, Inc. All rights reserved. Cisco Unity 4.1 Documentation What you need to know.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 UC 7.0 Install and Upgrade Changes TOI Josh Rose UCBU Software Engineer.
© 2002, Cisco Systems, Inc. All rights reserved..
© 2002, Cisco Systems, Inc. All rights reserved..
HOW TO GUIDE: INEXPENSIVE INTERNET PROTOCOL TELEPHONY SOLUTION Created by: Cameron Adkisson Eastern Kentucky University
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 2 v3.1 Module 2 Introduction to Routers.
1 © 2004, Cisco Systems, Inc. All rights reserved. CISCO CONFIDENTIAL Private Secure Messaging Unity 4.0(5)
CCNA Routing and Switching Routing and Switching Essentials v6.0
Network Life Cycle Created by Michael Law
Cisco Unity Connection 2.0 Phone View Configuration
Chapter 10: Device Discovery, Management, and Maintenance
CCNA Routing and Switching Routing and Switching Essentials v6.0
Routing and Switching Essentials v6.0
Chapter 10: Device Discovery, Management, and Maintenance
Chapter 2: Scaling VLANs
The Design Process—Planning
The Design Process—Planning
Presentation transcript:

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-1 Developing an Implementation Plan Final Design and Implementation

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-2 Implementation Plan Overview Implementation Plan document drawn from Low-Level Design Definition document Step-by-step guide on installation of system including: Preinstallation tasks Installation tasks Cutover tasks Go or no-go criteria Fallback readiness Operations acceptance

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-3 Preinstallation Tasks Preinstallation tasks include: Telephony integration, PBX reconfiguration, other resources lined up Preparing administrative consoles Creating accounts for Cisco Unity installation Schema extension Loading Lotus DUCs on Domino servers

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-4 Installation Tasks Use the Low-Level Design Definition document for: Physical placement of Cisco Unity servers Installation of software on Cisco Unity, Domino servers Installation of client applications—ViewMail for OutLook, Lotus DUCs Configuration and importing of subscribers

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-5 Precutover Tasks Configuration testing Conversation test plan Integration test plan Simulated load testing Go or no-go decision Precutover subscriber enrollment

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-6 Fallback Readiness Ability to reinstate legacy voic system Severe issues that cannot be resolved in a timely manner: –Continuous fail-safe conversations –Ports timing out constantly due to connectivity issues to PBX –Hardware failures –Software failures—Cisco Unity services terminating unexpectedly –Infrastructure issues—messaging systems, domain controllers, switches or routers

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-7 Operations Acceptance No unexpected errors occur. Cisco Unity answers calls and voice ports remain registered or active. The TUI conversation responds normally even during high- traffic periods.

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-8 Summary The Implementation Plan document is derived from the Low-Level Design Definition document. Implementation steps include preinstallation, installation, precutover, and acceptance. Preinstallation steps include setting up administration consoles and creating Cisco Unity system accounts. Installation steps include physical placement of Cisco Unity servers, loading of software on servers and clients, and importing subscribers. Tests should be run before cutover to discover any issues.

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-9 Summary (Cont.) Criteria should be set and a plan developed should fallback be needed. Postcutover acceptance is the absence of any major issues.

© 2006 Cisco Systems, Inc. All rights reserved. CUDN v1.1—3-10